Boiler Flue Regulations and Installation for London Homes: A Complete Guide

Boiler flue positioning is one of the most commonly overlooked technical issues when extending or renovating London homes. Getting it wrong can result in flue gases entering the building, failed Gas Safe inspections, planning complications, and danger to occupants. This guide covers the key regulations, typical product specifications, costs, and the specific scenarios that arise during extensions, loft conversions, and refurbishments.

Key Takeaways

  • Balanced flue terminals must be at least 300mm from any openable window or door — this is frequently violated when extensions are built
  • Building a rear extension that encloses an existing boiler flue terminal requires a flue extension — this must be planned at design stage
  • All gas work must be carried out by a Gas Safe registered engineer who issues a certificate and notifies Building Control
  • CO alarms are legally required in every room with a fixed combustion appliance since October 2022
  • Boiler relocation during a refurbishment typically costs £800-2,500 and is best planned alongside the wider project
  • Flue terminals visible from a highway in a conservation area require planning permission

Boiler Flue Types: Balanced Flue vs Open Flue

VIRTUALLY ALL MODERN CONDENSING BOILERS INSTALLED IN LONDON HOMES SINCE 2005 ARE ROOM-SEALED WITH A BALANCED FLUE (ALSO CALLED A CONCENTRIC FLUE OR ROOM-SEALED FLUE). THIS MEANS THE BOILER TAKES ITS COMBUSTION AIR FROM OUTSIDE THROUGH AN OUTER CONCENTRIC DUCT AND EXPELS PRODUCTS OF COMBUSTION THROUGH A CENTRAL INNER DUCT — ALL WITHIN A SINGLE FLUE TERMINAL THAT PASSES THROUGH THE EXTERNAL WALL OR THROUGH THE ROOF.

THE KEY CHARACTERISTIC OF A BALANCED FLUE IS THAT IT DOES NOT RELY ON AIR FROM INSIDE THE ROOM. THE BOILER IS ENTIRELY SEALED FROM THE ROOM — NO PERMANENT VENTILATION IS REQUIRED IN THE BOILER CUPBOARD. THIS IS THE STANDARD FOR ALL MODERN COMBI BOILERS, SYSTEM BOILERS, AND MOST HEAT-ONLY BOILERS.

COMMON BALANCED FLUE PRODUCTS: - WORCESTER BOSCH GREENSTAR 8000 LIFE 30kW COMBI — 60/100MM CONCENTRIC BALANCED FLUE, MAXIMUM HORIZONTAL RUN 10M (EQUIVALENT LENGTH, DEDUCTING BENDS) - VAILLANT ECOTEC PLUS 835 — 60/100MM CONCENTRIC BALANCED FLUE, MAXIMUM EQUIVALENT LENGTH 18M USING HORIZONTAL/VERTICAL KIT - BAXI 800 COMBI 30 — 60/100MM CONCENTRIC BALANCED FLUE - IDEAL LOGIC MAX COMBI 30 — 60/100MM BALANCED FLUE, MAXIMUM 6M EQUIVALENT HORIZONTAL

NOTE: EACH MANUFACTURER SPECIFIES MAXIMUM FLUE LENGTH IN EQUIVALENT METRES (EACH 90° BEND = 1.0M EQUIVALENT; EACH 45° BEND = 0.5M EQUIVALENT). NEVER EXCEED THE MANUFACTURER\'S MAXIMUM — THIS CAUSES INCOMPLETE COMBUSTION.

OPEN-FLUE BOILERS (ALSO CALLED CONVENTIONAL FLUE OR NATURAL DRAUGHT): THESE ARE OLDER SYSTEMS THAT DRAW COMBUSTION AIR FROM THE ROOM AND EXPEL PRODUCTS OF COMBUSTION UP A CONVENTIONAL CHIMNEY FLUE OR VERTICAL FLUE PIPE. RARELY INSTALLED NEW TODAY. IF YOUR PROPERTY HAS ONE, IT REQUIRES A PERMANENT VENTILATOR IN THE BOILER ROOM (MINIMUM FREE AREA PER GAS SAFE/PART J) AND CARBON MONOXIDE ALARMS. AN OPEN-FLUE BOILER IN A ROOM THAT HAS BEEN SEALED (E.G. BY A NEW EXTENSION WRAPPING AROUND IT) IS A SERIOUS CARBON MONOXIDE RISK — THIS MUST BE ASSESSED BY A GAS SAFE ENGINEER.

Balanced Flue Terminal Distances: Part J and Building Regulations

APPROVED DOCUMENT J (COMBUSTION APPLIANCES AND FUEL STORAGE SYSTEMS) OF THE BUILDING REGULATIONS SETS THE MINIMUM DISTANCES FOR BALANCED FLUE TERMINALS FROM BUILDING OPENINGS. THESE ARE THE DISTANCES THAT GAS SAFE ENGINEERS MUST COMPLY WITH AND BUILDING CONTROL INSPECTORS CHECK.

KEY MINIMUM DISTANCES FOR A BALANCED FLUE TERMINAL (TABLE 2 OF APPROVED DOCUMENT J 2010):

FROM OPENABLE WINDOWS OR DOORS: MINIMUM 300MM (HORIZONTAL AND VERTICAL) — THIS IS THE DISTANCE MOST FREQUENTLY VIOLATED WHEN EXTENSIONS ARE BUILT NEXT TO EXISTING BOILER FLUES.

FROM A CORNER OF THE BUILDING: MINIMUM 300MM — TERMINAL MUST NOT BE WITHIN 300MM OF AN INTERNAL CORNER.

FROM THE GROUND: MINIMUM 300MM (MEASURED TO CENTRE OF TERMINAL) — TO PREVENT BLOCKAGE BY SNOW, PLANTS, OR TAMPERING.

FROM AN ADJACENT BUILDING OR BOUNDARY: NO SPECIFIED MINIMUM IN PART J (THE MINIMUM IN THE GAS INDUSTRY UNSAFE SITUATIONS PROCEDURE IGEM/UP/1A IS 600MM FROM AN ADJACENT BOUNDARY WHERE THERE IS AN OPENABLE WINDOW ON THE NEIGHBOURING PROPERTY). IN PRACTICE GAS SAFE ENGINEERS APPLY 600MM.

FROM A GAS OR ELECTRICITY METER: MINIMUM 150MM.

FROM AN OPENING IN THE SOFFIT ABOVE: MINIMUM 200MM.

FROM BELOW GUTTERING, EAVES, OR BALCONIES: MINIMUM 200MM.

FROM ANOTHER FLUE TERMINAL: MINIMUM 1,500MM IF SERVING THE SAME APPLIANCE; 300MM IF SERVING DIFFERENT APPLIANCES.

EXTENSION-SPECIFIC ISSUE: IF A REAR EXTENSION IS BUILT AND THE EXISTING BOILER FLUE NOW TERMINATES INSIDE OR CLOSE TO THE EXTENSION (E.G. ON THE OLD REAR WALL WHICH IS NOW AN INTERNAL WALL), THE FLUE MUST BE EXTENDED THROUGH THE NEW EXTENSION TO TERMINATE ON THE NEW EXTERNAL WALL. THIS ADDS FLUE EXTENSION COST AND MUST BE PLANNED BEFORE THE EXTENSION IS BUILT. DISCUSS THIS WITH YOUR GAS SAFE ENGINEER AT DESIGN STAGE.

LOFT CONVERSION ISSUE: A LOFT CONVERSION ADDS HABITABLE SPACE ABOVE THE EXISTING BOILER FLUE ROUTE. IF THE BOILER HAS A VERTICAL FLUE THROUGH THE ROOF, THIS IS USUALLY STRAIGHTFORWARD — THE VERTICAL FLUE SIMPLY PASSES THROUGH THE NEW LOFT FLOOR WITH A FIRE-RATED COLLAR. IF THE BOILER HAS A HORIZONTAL FLUE ON THE REAR WALL, ADDING DORMERS ABOVE THE FLUE TERMINAL HEIGHT REQUIRES CHECKING THE DISTANCES FROM THE DORMER WINDOWS.

Flue Products: Specifications and Compatibility

BOILER MANUFACTURERS SELL PROPRIETARY FLUE SYSTEMS THAT MUST BE USED WITH THEIR BOILERS — DO NOT MIX MANUFACTURERS\' FLUE COMPONENTS. THE MAIN FLUE SYSTEM FORMATS ARE:

60/100MM CONCENTRIC (STANDARD FOR MOST COMBI BOILERS): - INNER 60MM EXHAUST, OUTER 100MM COMBUSTION AIR SUPPLY - HORIZONTAL TERMINAL (C1X CONFIGURATION IN BS EN 15502-1): MOST COMMON IN LONDON — PASSES THROUGH THE REAR OR SIDE WALL - VERTICAL TERMINAL (C3X CONFIGURATION): EXITS THROUGH THE ROOF — BETTER FOR LONGER FLUE RUNS AND WHERE WALL TERMINAL DISTANCES CANNOT BE MET - 45° AND 90° BENDS REDUCE THE MAXIMUM PERMISSIBLE RUN — EACH 90° BEND TYPICALLY DEDUCTS 1.0M FROM THE MAXIMUM EQUIVALENT LENGTH

80/125MM CONCENTRIC (FOR HIGH-OUTPUT OR CONDENSING SYSTEM BOILERS): - USED FOR HIGHER-OUTPUT BOILERS (TYPICALLY 35KW+) OR WHERE LONGER RUNS ARE NEEDED - WORCESTER BOSCH GREENSTAR 8000 LIFE 40KW: 80/125MM FLUE, MAXIMUM 20M EQUIVALENT

80MM TWIN-PIPE FLUE (C5X CONFIGURATION): - SEPARATE 80MM EXHAUST PIPE AND SEPARATE 80MM AIR SUPPLY PIPE - ALLOWS MUCH LONGER RUNS AND MORE FLEXIBLE ROUTING - IDEAL FOR RUNS EXCEEDING 10M OR WHERE BALANCED CONCENTRIC FLUE CANNOT BE ROUTED - COST IS HIGHER — APPROXIMATELY 30-50% MORE PIPE MATERIAL

PLASTIC FLUE SYSTEMS (FOR CONDENSING BOILERS BELOW 110°C FLUE TEMPERATURE): - ICAD (INTENSITY CONCENTRIC AIR/DISCHARGE) PLASTIC FLUE — MANUFACTURER-SPECIFIC SYSTEM (E.G. WORCESTER BOSCH GREENSTAR LIFE PLASTIC FLUE, VAILLANT ECOTEC PLASTIC FLUE KIT) - ABS OR POLYPROPYLENE FLUE PIPE — SUITABLE FOR CONDENSATE AND COOL FLUE GAS FROM MODERN CONDENSING BOILERS - LIGHTER, CHEAPER TO INSTALL THAN STAINLESS BUT MUST NOT BE USED WITH NON-CONDENSING BOILERS (FLUE GAS TOO HOT)

STAINLESS STEEL RIGID FLUE SYSTEMS: - POUJOULAT INOX OR JEREMIAS DPL DOUBLE-WALL STAINLESS — USED FOR BOILER INSTALLATIONS REQUIRING LONG VERTICAL RUNS OR WHERE HIGH FLUE GAS TEMPERATURES APPLY - APPROPRIATE FOR OPEN-FLUE APPLIANCES AND SOLID FUEL (THOUGH SOLID FUEL REQUIRES CLASS 1 CHIMNEY OR TWIN-WALL FLUE) - MANUFACTURER CE-MARKED FOR TEMPERATURE CLASS: T080 FOR CONDENSING GAS, T200 FOR CONVENTIONAL GAS

Planning Permission and Flue Positioning

BALANCED FLUE TERMINALS ON DWELLINGS ARE GENERALLY PERMITTED DEVELOPMENT UNDER THE GPDO 2015 SCHEDULE 2 PART 14 (MICROGENERATION) OR PART 1 (EXTENSIONS AND ALTERATIONS) PROVIDED THEY MEET CERTAIN CONDITIONS. HOWEVER, THERE ARE EXCEPTIONS:

CONSERVATION AREAS AND LISTED BUILDINGS: A FLUE TERMINAL VISIBLE FROM A HIGHWAY IN A CONSERVATION AREA REQUIRES PLANNING PERMISSION. IN PRACTICE THIS MEANS: REAR WALL FLUES ON PROPERTIES IN CONSERVATION AREAS ARE USUALLY PERMITTED DEVELOPMENT (NOT VISIBLE FROM HIGHWAY); FRONT WALL OR SIDE WALL FLUES VISIBLE FROM THE STREET REQUIRE CONSENT. FOR LISTED BUILDINGS, ALL MATERIAL ALTERATIONS (INCLUDING FLUE PENETRATIONS THROUGH LISTED WALLS OR ROOFS) REQUIRE LISTED BUILDING CONSENT. CONSULT YOUR LOCAL PLANNING AUTHORITY BEFORE INSTALLING A FLUE IN A CONSERVATION AREA OR LISTED BUILDING.

SIZE LIMIT: A FLUE MUST NOT PROJECT MORE THAN 1 METRE ABOVE THE HIGHEST PART OF THE ROOF IF IT IS A VERTICAL FLUE — OTHERWISE PLANNING PERMISSION IS REQUIRED.

PRACTICAL PLANNING NOTE: WHERE AN EXTENSION NECESSITATES RE-ROUTING THE BOILER FLUE TO A NEW POSITION ON THE BUILDING, THE NEW POSITION MAY REQUIRE PLANNING PERMISSION WHERE THE OLD ONE DID NOT — FOR EXAMPLE, IF THE NEW TERMINAL WOULD BE ON A SIDE WALL VISIBLE FROM THE STREET. PLAN THE FLUE ROUTE WITH YOUR ARCHITECT AND GAS SAFE ENGINEER AT DESIGN STAGE TO AVOID PLANNING ISSUES AFTER CONSTRUCTION BEGINS.

GAS SAFE REGISTRATION AND BUILDING REGULATIONS: ALL WORK ON GAS BOILERS AND FLUES MUST BE CARRIED OUT BY A GAS SAFE REGISTERED ENGINEER. THE GAS SAFE REGISTER IS MANDATORY FOR ALL GAS WORK IN THE UK UNDER THE GAS SAFETY (INSTALLATION AND USE) REGULATIONS 1998. UPON COMPLETION, THE ENGINEER ISSUES A GAS SAFETY CERTIFICATE AND NOTIFIES BUILDING CONTROL (IF A SELF-CERTIFICATION SCHEME MEMBER — WHICH MOST GAS SAFE ENGINEERS ARE). THIS FORMS PART OF THE BUILDING\' COMPLIANCE DOCUMENTATION.

Boiler Relocation and Extension Projects

ONE OF THE MOST COMMON TECHNICAL OVERSIGHTS IN LONDON EXTENSION AND LOFT CONVERSION PROJECTS IS FAILING TO PLAN THE BOILER AND FLUE POSITION AT DESIGN STAGE. THE FOLLOWING SCENARIOS ARISE REGULARLY:

REAR EXTENSION ENCLOSING THE EXISTING BOILER FLUE TERMINAL: IF THE EXISTING BOILER IS ON THE REAR KITCHEN WALL AND FLUES THROUGH THAT WALL, BUILDING A REAR EXTENSION IMMEDIATELY MAKES THE FLUE TERMINAL INTERNAL (INSIDE THE EXTENSION). THE BOILER MUST BE CONNECTED TO A NEW FLUE EXTENSION THAT ROUTES THROUGH THE EXTENSION AND TERMINATES ON THE NEW EXTERNAL REAR WALL. COST: £250-800 FOR FLUE EXTENSION AND REROUTING DEPENDING ON DISTANCE AND BENDS.

BOILER RELOCATION: SOMETIMES THE BOILER NEEDS TO MOVE ENTIRELY — FOR EXAMPLE, IF THE KITCHEN LAYOUT CHANGES OR THE BOILER CUPBOARD IS BEING DEMOLISHED AS PART OF AN OPEN-PLAN KITCHEN EXTENSION. BOILER RELOCATION REQUIRES: NEW GAS SUPPLY PIPE RUN TO NEW LOCATION (£150-400); NEW FLUE POSITION (£200-600); RE-PLUMBING OF FLOW AND RETURN PIPEWORK (£300-800); AND GAS SAFE CERTIFICATE. TOTAL RELOCATION COST TYPICALLY £800-2,500 DEPENDING ON COMPLEXITY.

BOILER REPLACEMENT DURING REFURBISHMENT: IF THE EXISTING BOILER IS MORE THAN 10-15 YEARS OLD, IT IS USUALLY MOST COST-EFFECTIVE TO REPLACE IT DURING THE WIDER REFURBISHMENT RATHER THAN AFTER. A NEW WORCESTER BOSCH GREENSTAR 8000 LIFE 30KW COMBI OR VAILLANT ECOTEC PLUS 835 INSTALLED DURING A FULL REFURBISHMENT TYPICALLY COSTS £1,200-2,500 (BOILER + INSTALLATION IN A REFURBISHMENT CONTEXT WHERE SCAFFOLD AND DISRUPTION ARE ALREADY PRESENT). STANDALONE BOILER REPLACEMENT COSTS £1,500-3,500 INSTALLED.

MINIMUM BOILER SIZE FOR DIFFERENT PROPERTY TYPES: - 1-BED FLAT, 1 BATHROOM: 18-24KW COMBI SUFFICIENT - 2-BED VICTORIAN TERRACE, 1 BATHROOM: 24-28KW COMBI - 3-BED VICTORIAN TERRACE, 2 BATHROOMS: 28-35KW COMBI OR SYSTEM BOILER WITH CYLINDER - 4-BED SEMI/DETACHED, 2+ BATHROOMS: 35-40KW COMBI OR SYSTEM BOILER NOTE: COMBI BOILERS ABOVE 40KW ARE NOT SIGNIFICANTLY MORE EFFICIENT — FOR LARGE PROPERTIES WITH MULTIPLE SIMULTANEOUS HOT WATER DRAWS, A SYSTEM BOILER WITH UNVENTED HOT WATER CYLINDER (MEGAFLO ECOSTATIC 170-250L OR EQUIVALENT) GIVES BETTER PERFORMANCE.

Carbon Monoxide Safety and Flue Inspection

CARBON MONOXIDE (CO) IS PRODUCED BY INCOMPLETE COMBUSTION OF GAS, OIL, OR SOLID FUEL. IT IS ODOURLESS, COLOURLESS, AND LETHAL. FLUE FAILURES OR SPILLAGE ARE A PRIMARY CAUSE OF CO INCIDENTS IN LONDON HOMES.

MANDATORY CO ALARMS: SINCE OCTOBER 2022, THE SMOKE AND CARBON MONOXIDE ALARM (AMENDMENT) REGULATIONS 2022 REQUIRE CO ALARMS IN EVERY ROOM WITH A FIXED COMBUSTION APPLIANCE (EXCLUDING GAS COOKERS). THIS MEANS A CO ALARM IS NOW LEGALLY REQUIRED IN ANY ROOM CONTAINING A GAS BOILER, GAS FIRE, OR SOLID FUEL APPLIANCE. LANDLORDS ARE REQUIRED TO TEST ALARMS AT THE START OF EACH TENANCY.

RECOMMENDED CO ALARM PRODUCTS: - AICO EI208 OPTICAL + CO MULTI-SENSOR: MAINS-WIRED, 10-YEAR BATTERY BACKUP, INTERLINKS WITH AICO RADIOLINK SYSTEM - NEST PROTECT 2ND GEN: SMART CO + SMOKE ALARM, WIFI CONNECTED, SUITABLE FOR HOMEOWNERS - KIDDE 7CO NIGHTHAWK: STANDALONE BATTERY CO ALARM, SUITABLE FOR RENTED PROPERTY COMPLIANCE

CO ALARMS SHOULD BE POSITIONED AT HEAD HEIGHT (CO IS SIMILAR DENSITY TO AIR — UNLIKE SMOKE WHICH RISES). DO NOT POSITION DIRECTLY NEXT TO THE APPLIANCE OR IN HUMID ENVIRONMENTS.

ANNUAL BOILER SERVICE: A GAS SAFE REGISTERED ENGINEER SHOULD SERVICE THE BOILER ANNUALLY. THIS INCLUDES: FLUE INTEGRITY CHECK (COMBUSTION ANALYSIS — MEASURING CO/CO2 RATIO IN FLUE GAS); BURNER INSPECTION; HEAT EXCHANGER VISUAL CHECK; CONDENSATE TRAP AND DRAIN CHECK; SAFETY DEVICE OPERATION CHECK. WITHOUT ANNUAL SERVICE, THE MANUFACTURER\'S GUARANTEE (TYPICALLY 5-10 YEARS ON WORCESTER BOSCH AND VAILLANT) IS VOIDED.

SPILLAGE TEST FOR OPEN-FLUE APPLIANCES: GAS SAFE ENGINEERS USE A SMOKE MATCH TO CHECK FOR SPILLAGE — FLUE GAS FLOWING BACK INTO THE ROOM RATHER THAN UP THE FLUE. THIS IS A CRITICAL CHECK ON OPEN-FLUE BOILERS AND GAS FIRES IN SEALED ROOMS.

SUSPECTED FLUE LEAK: IF RESIDENTS EXPERIENCE HEADACHES, DIZZINESS, NAUSEA, OR TIREDNESS THAT IMPROVES ON LEAVING THE PROPERTY — EVACUATE IMMEDIATELY, DO NOT RE-ENTER, OPEN WINDOWS IF SAFE TO DO SO, CALL GAS EMERGENCY 0800 111 999 AND THEN A GAS SAFE ENGINEER.

Frequently Asked Questions

How far does a boiler flue terminal need to be from a window?
APPROVED DOCUMENT J REQUIRES A MINIMUM OF 300MM FROM AN OPENABLE WINDOW OR DOOR — THIS IS MEASURED IN BOTH HORIZONTAL AND VERTICAL DIRECTIONS. IN PRACTICE, GAS SAFE ENGINEERS APPLY 600MM WHERE POSSIBLE TO PROVIDE A SAFETY MARGIN. THIS DISTANCE IS FREQUENTLY VIOLATED WHEN EXTENSIONS ARE BUILT WITHOUT CONSIDERING THE EXISTING FLUE POSITION.
Does a boiler flue need planning permission in a conservation area?
A FLUE TERMINAL THAT IS VISIBLE FROM A HIGHWAY IN A CONSERVATION AREA REQUIRES PLANNING PERMISSION. REAR WALL FLUES NOT VISIBLE FROM THE STREET ARE GENERALLY PERMITTED DEVELOPMENT. ALWAYS CONFIRM WITH YOUR LOCAL PLANNING AUTHORITY. FOR LISTED BUILDINGS, ALL FLUE PENETRATIONS REQUIRE LISTED BUILDING CONSENT.
What happens to my boiler flue when I build a rear extension?
IF THE EXISTING BOILER FLUE TERMINAL IS ON THE REAR WALL AND YOU BUILD A REAR EXTENSION, THE TERMINAL WILL END UP INSIDE THE EXTENSION — WHICH IS NOT PERMITTED. THE FLUE MUST BE EXTENDED THROUGH THE NEW EXTENSION WALL. THIS SHOULD BE PLANNED AT DESIGN STAGE AND TYPICALLY COSTS £250-800 FOR FLUE EXTENSION AND REROUTING. DISCUSS THIS WITH YOUR GAS SAFE ENGINEER BEFORE CONSTRUCTION STARTS.
Do I need a carbon monoxide alarm with my boiler?
YES — SINCE OCTOBER 2022 THE LAW REQUIRES A CO ALARM IN ANY ROOM CONTAINING A FIXED COMBUSTION APPLIANCE (EXCLUDING GAS COOKERS). THIS COVERS GAS BOILERS. FOR LANDLORDS, CO ALARMS MUST BE TESTED AT THE START OF EACH TENANCY. FOR HOMEOWNERS, AN AICO EI208 OR NEST PROTECT ARE RECOMMENDED CHOICES.
How much does it cost to relocate a boiler in London?
BOILER RELOCATION IN LONDON TYPICALLY COSTS £800-2,500 DEPENDING ON COMPLEXITY — THIS COVERS NEW GAS SUPPLY RUN, NEW FLUE POSITION, RE-PLUMBING OF FLOW AND RETURN PIPEWORK, AND A GAS SAFE CERTIFICATE. IF DONE DURING A WIDER REFURBISHMENT WHEN DISRUPTION AND ACCESS ARE ALREADY IN PLACE, THE COST IS OFTEN TOWARDS THE LOWER END OF THIS RANGE.
What size boiler do I need for a Victorian terrace?
FOR A STANDARD 3-BEDROOM VICTORIAN TERRACE WITH ONE BATHROOM, A 28-35KW COMBI BOILER (WORCESTER BOSCH GREENSTAR 8000 LIFE 30KW, VAILLANT ECOTEC PLUS 835, OR IDEAL LOGIC MAX 30) IS TYPICALLY APPROPRIATE. FOR TWO BATHROOMS WHERE SIMULTANEOUS HOT WATER IS NEEDED, EITHER A 35-40KW COMBI OR A SYSTEM BOILER WITH AN UNVENTED CYLINDER (MEGAFLO ECOSTATIC 170-210L) GIVES BETTER PERFORMANCE.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.