⭐ 9.96/10 Checkatrade · 114+ Reviews
📞 07359 872594
External Works & Facades8 min read

External Cladding for London Homes: Fibre Cement, Timber, and Rainscreen Systems Guide

External cladding is an increasingly popular choice for London homes on rear extensions, side extensions, garden studios, and partial facade upgrades. Unlike render, which is applied directly to the substrate, cladding systems use a ventilated rainscreen principle — the cladding panels are fixed away from the structure with a cavity behind, allowing any moisture that penetrates the outer skin to drain harmlessly away without reaching the structure. This makes rainscreen cladding one of the most robust and low-maintenance external finishes available. This guide covers the main cladding types used in London residential projects: fibre cement (Cedral, Marley Eternit), engineered timber (Accoya, thermally modified Kebony), natural timber (Western red cedar, larch), and the associated fire safety, fixing, and detailing requirements.

Key Takeaways

  • Rainscreen cladding principle: minimum 25mm ventilated cavity behind cladding for drainage and drying — open at base and top, cavity fire barriers at each floor level
  • Cedral Click fibre cement (12mm, A2-S1,D0 non-combustible): the UK market leader — factory-coloured, 15-year colour warranty, no painting required, stainless A2/A4 screws essential
  • Timber cladding permitted on UK houses under 11m height with cavity fire barriers at floor levels — buildings over 11m require non-combustible Class A2 systems throughout
  • Accoya (acetylated radiata pine): 50-year above-ground warranty, 5% moisture absorption vs 30% for untreated pine — the premium specification for long-life timber cladding
  • Western red cedar: naturally durable (Use Class 3), no treatment needed, weathers to silver-grey, requires annual cedar oil if colour to be maintained
  • Breather membrane (Wraptite SA, Tyvek Housewrap) essential under battens — prevents wind-driven rain reaching substrate while allowing vapour diffusion outward
  • Installed costs: Cedral Click £65-110/m², Cedar £75-130/m², Accoya £110-180/m², Kebony £100-160/m²

The Rainscreen Cavity Principle

A CORRECTLY DESIGNED CLADDING SYSTEM IS ALWAYS A RAINSCREEN — THE CLADDING PANEL IS NOT SEALED AGAINST THE STRUCTURE BENEATH IT BUT IS SEPARATED BY A VENTILATED CAVITY OF MINIMUM 25MM CLEAR WIDTH. THIS CAVITY SERVES MULTIPLE FUNCTIONS.

FIRST, DRAINAGE: ANY RAINWATER THAT PENETRATES BEHIND THE OUTER CLADDING (THROUGH JOINTS, FIXINGS, OR IMPACT) CAN DRAIN DOWN THE BACK OF THE PANEL THROUGH THE CAVITY AND EXIT AT THE BASE THROUGH A VENTILATED CAVITY TRAY, RATHER THAN BEING TRAPPED AGAINST THE STRUCTURE.

SECOND, VENTILATION: AIR CIRCULATES UPWARD THROUGH THE CAVITY (DRIVEN BY THERMAL BUOYANCY), DRYING ANY RESIDUAL MOISTURE AND PREVENTING CONDENSATION BUILDUP ON THE INNER FACE OF THE CLADDING OR THE OUTER FACE OF THE STRUCTURE.

THIRD, THERMAL BUFFER: THE VENTILATED AIR LAYER REDUCES THE TEMPERATURE DIFFERENTIAL BETWEEN THE OUTER CLADDING SURFACE (WHICH MAY REACH 60'C IN SUMMER SUN) AND THE INSULATED STRUCTURE BEHIND, REDUCING DIFFERENTIAL THERMAL MOVEMENT.

THE TECHNICAL REQUIREMENTS FOR A COMPLIANT RAINSCREEN CAVITY ARE: MINIMUM 25MM CLEAR CAVITY (MEASURED BETWEEN THE BACK OF THE PANEL AND ANY INSULATION OR BREATHER MEMBRANE SURFACE); OPEN AT THE BASE FOR DRAINAGE AND AT THE TOP FOR VENTILATION (NET FREE AREA NOT LESS THAN 500MM' PER METRE WIDTH AT EACH LEVEL); CAVITY FIRE BARRIERS AT EVERY FLOOR LEVEL AND WINDOW PERIMETER (IN BUILDINGS OVER TWO STOREYS).

Fibre Cement Cladding: Cedral Click and Marley Eternit

FIBRE CEMENT (FIBRE REINFORCED CEMENT) CLADDING IS THE DOMINANT LOW-MAINTENANCE CLADDING MATERIAL IN UK RESIDENTIAL CONSTRUCTION. IT IS COMPOSED OF PORTLAND CEMENT, SILICA, AND WOOD FIBRE REINFORCEMENT, AUTOCLAVED TO PRODUCE A DIMENSIONALLY STABLE, DURABLE BOARD THAT IS NOT COMBUSTIBLE (EUROCLASS A2-S1,D0 — IMPORTANT FOR FIRE SAFETY COMPLIANCE UNDER PART B), MOISTURE-RESISTANT, FROST-RESISTANT, AND TERMITE/ROT-RESISTANT.

CEDRAL CLICK (BY ETEX) IS THE UK MARKET LEADER FOR RESIDENTIAL FIBRE CEMENT CLADDING. THE CEDRAL CLICK SYSTEM IS A HORIZONTAL LAPPED PROFILE (WEATHERBOARDING) IN 12MM THICK X 190MM FACE WIDTH BOARDS, WITH A CONCEALED CLICK FIXING THAT ALLOWS BOARDS TO BE CLIPPED TOGETHER WITHOUT EXPOSED SCREW HEADS ON THE FACE. CEDRAL CLICK IS AVAILABLE IN A RANGE OF 20+ FACTORY-APPLIED COLOURS AND A WOOD-EFFECT SMOOTH FINISH OR SAWN TIMBER TEXTURE. THE BOARDS ARE NAILED OR SCREWED INTO VERTICAL TIMBER BATTENS AT 600MM CENTRES FIXED TO THE SUBSTRATE, WITH THE BATTENS CREATING THE MINIMUM 25MM CAVITY.

MARLEY ETERNIT CEDRAL (THE MARLEY BRAND VERSION OF ESSENTIALLY THE SAME PRODUCT) AND JAMES HARDIE HARDIEPLANK ARE DIRECT COMPETITORS WITH SIMILAR PERFORMANCE CHARACTERISTICS. ALL THREE ARE AVAILABLE THROUGH NATIONAL BUILDERS' MERCHANTS AND CARRY BBA CERTIFICATES.

KEY PRACTICAL POINTS FOR CEDRAL CLICK INSTALLATION: ALL CUT EDGES MUST BE SEALED WITH CEDRAL WEATHERBOARD EDGE SEAL (PRIMER) TO PREVENT MOISTURE PENETRATION INTO THE CUT CEMENT FACE. ALL INTERNAL AND EXTERNAL CORNERS USE PROPRIETARY CORNER TRIM PROFILES (PVC OR ALUMINIUM) — NOT TIMBER. THE HORIZONTAL BATTENS MUST BE PRESSURE-TREATED TO USE CLASS 3 (TANALITH E) OR BE CONSTRUCTED FROM NATURALLY DURABLE SPECIES. STARTER TRIM AND DRIP EDGE AT THE BASE OF THE CLADDING MUST DIRECT WATER AWAY FROM THE WALL FACE.

Timber Cladding: Accoya, Larch, Cedar, and Kebony

NATURAL AND ENGINEERED TIMBER CLADDING IS POPULAR FOR REAR EXTENSIONS AND GARDEN STRUCTURES IN LONDON, PARTICULARLY WHERE A WARMER AESTHETIC IS DESIRED. TIMBER CLADDING REQUIRES MORE MAINTENANCE THAN FIBRE CEMENT BUT CAN BE SPECIFIED IN HIGH-DURABILITY SPECIES OR MODIFIED TIMBERS TO REDUCE MAINTENANCE REQUIREMENTS.

ACCOYA (ACETYLATED RADIATA PINE) IS THE PREMIUM ENGINEERED TIMBER FOR EXTERNAL CLADDING. THE ACETYLATION PROCESS MODIFIES THE WOOD AT A MOLECULAR LEVEL, REDUCING ITS MOISTURE ABSORPTION TO LESS THAN 5% (COMPARED TO 30% FOR UNTREATED PINE) AND MAKING IT DIMENSIONALLY STABLE, ROT-RESISTANT, AND TERMITE-RESISTANT. ACCOYA IS CERTIFIED USE CLASS 4 (GROUND CONTACT) AND CARRIES A 50-YEAR ABOVE-GROUND GUARANTEE. IT CAN BE FINISHED WITH TRANSPARENT OR OPAQUE MICROPOROUS PAINTS OR OIL SYSTEMS AND WILL WEATHER TO A SILVER-GREY IF LEFT UNCOATED. ACCOYA FEATHER-EDGE OR SHADOWCLAD PROFILES ARE AVAILABLE FROM FINNFOREST/MEDITE SMARTPLY.

WESTERN RED CEDAR (THUJA PLICATA) IS A NATURALLY DURABLE TIMBER (USE CLASS 3 WITHOUT TREATMENT) WITH A WARM REDDISH-BROWN TONE THAT WEATHERS TO SILVER-GREY. IT IS COMMONLY USED IN LONDON FOR REAR EXTENSION AND GARDEN STUDIO CLADDING. CEDAR OIL (WATCO DANISH OIL OR SIKKENS CETOL BL) APPLIED ANNUALLY PRESERVES THE COLOUR AND EXTENDS SERVICE LIFE. CEDAR IS AVAILABLE AS FEATHER-EDGE, TONGUE-AND-GROOVE, OR REBATED PROFILE.

LARCH (LARIX SPP.) — PARTICULARLY SIBERIAN LARCH (LARIX SIBIRICA) — IS ANOTHER NATURALLY DURABLE OPTION (USE CLASS 3 UNTREATED) WITH A GOLDEN-AMBER COLOUR. IT IS DENSER AND HARDER THAN CEDAR AND TAKES CLEAR FINISHES WELL.

KEBONY (THERMALLY MODIFIED RADIATA PINE) IS A SCANDINAVIAN PRODUCT THAT USES HEAT AND STEAM TO MODIFY THE WOOD STRUCTURE, ACHIEVING USE CLASS 3 DURABILITY WITH AN ATTRACTIVE BROWN-GREY TONE. IT IS AN FSC-CERTIFIED, SUSTAINABLE ALTERNATIVE TO TROPICAL HARDWOODS.

Fire Safety Under Building Regulations Part B

FIRE SAFETY IS THE MOST IMPORTANT REGULATORY CONSIDERATION IN EXTERNAL CLADDING SPECIFICATION FOR UK RESIDENTIAL BUILDINGS, PARTICULARLY FOLLOWING THE GRENFELL TOWER TRAGEDY IN 2017 AND SUBSEQUENT CHANGES TO BUILDING REGULATIONS.

FOR HOUSES (TYPICALLY UNDER 11M HEIGHT AND NO MORE THAN 3 STOREYS): ALL EXTERNAL CLADDING ON RESIDENTIAL BUILDINGS BELOW 11M HEIGHT MUST BE OF LIMITED COMBUSTIBILITY — MINIMUM EUROCLASS B-S3,D2 OR BETTER — OR USE A THIRD-PARTY CERTIFIED SYSTEM WHERE THE SYSTEM AS A WHOLE (PANELS + INSULATION + CAVITY BARRIERS + FIXINGS) HAS BEEN ASSESSED FOR FIRE PERFORMANCE. FIBRE CEMENT CLADDING (CEDRAL, HARDIE) IS CLASS A2-S1,D0 (ESSENTIALLY NON-COMBUSTIBLE) AND COMPLIES WITHOUT FURTHER ASSESSMENT. ACCOYA AND MODIFIED TIMBER CLADDING IS CLASS C OR D (COMBUSTIBLE) — ON MOST HOUSES (UNDER 11M) THIS IS PERMISSIBLE PROVIDED CAVITY FIRE BARRIERS ARE INSTALLED AT EACH FLOOR LEVEL.

FOR BUILDINGS OVER 11M: THE JANUARY 2023 REGULATIONS (APPROVED DOCUMENT B, VOLUME 2, AMENDMENT 2023) REQUIRE ALL ELEMENTS OF AN EXTERNAL WALL SYSTEM ON BUILDINGS OVER 11M IN HEIGHT TO BE CLASS A2-S1,D0 OR BETTER — I.E., ESSENTIALLY NON-COMBUSTIBLE THROUGHOUT. COMBUSTIBLE TIMBER CLADDING IS NOT PERMITTED ON RESIDENTIAL BUILDINGS OVER 11M.

CAVITY FIRE BARRIERS MUST BE INSTALLED AT EVERY FLOOR LEVEL, AROUND EVERY WINDOW AND DOOR OPENING, AND AT EVERY JUNCTION WITH A COMPARTMENT WALL IN ANY MULTI-STOREY RESIDENTIAL BUILDING. CAVITY FIRE BARRIERS FOR TIMBER-FRAME CONSTRUCTION: ROCKWOOL FLEXIROCK OR KNAUF EARTHWOOL ACOUSTIC FIRE BARRIER (MINERAL WOOL, 50MM MINIMUM). FOR MASONRY CONSTRUCTION: PROPRIETARY INTUMESCENT CAVITY CLOSERS (FIRE AND SMOKE CAVITY BARRIER FSC 047 OR EQUIVALENT).

Fixing Systems, Substrates, and Breather Membranes

CLADDING SYSTEMS ARE FIXED TO THE STRUCTURE VIA A BATTEN AND COUNTER-BATTEN (OR VERTICAL BATTEN) FRAMEWORK. THE CORRECT SEQUENCE FOR A REAR EXTENSION CLADDING SYSTEM OVER A MASONRY OR TIMBER FRAME SUBSTRATE IS: BREATHER MEMBRANE + VERTICAL BATTENS + CLADDING PANELS.

BREATHER MEMBRANE: WRAPTITE SA (A. PROCTOR GROUP) OR TYVEK HOUSEWRAP (DU PONT) IS A VAPOUR-PERMEABLE, AIR-TIGHT BREATHER MEMBRANE THAT IS APPLIED DIRECTLY TO THE SUBSTRATE FACE (MASONRY OR TIMBER SHEATHING) BEFORE BATTENS ARE FIXED. IT PREVENTS WIND-DRIVEN RAIN AND DRAUGHTS FROM PENETRATING THE SUBSTRATE WHILE ALLOWING WATER VAPOUR TO DIFFUSE OUTWARD — CRITICAL FOR THE THERMAL PERFORMANCE OF THE WALL. THE MEMBRANE IS LAPPED HORIZONTAL JOINTS AT MINIMUM 150MM, VERTICAL JOINTS AT MINIMUM 150MM, AND TAPED WITH COMPATIBLE MEMBRANE TAPE AT ALL OVERLAPS.

VERTICAL BATTENS: 50X25MM (OR 50X38MM FOR THICKER CAVITY SYSTEMS) PRESSURE-TREATED SOFTWOOD (TANALITH E USE CLASS 3) FIXED AT 600MM CENTRES THROUGH THE BREATHER MEMBRANE INTO THE SUBSTRATE STRUCTURE (MASONRY VIA STAINLESS STEEL FRAME ANCHORS, TIMBER FRAME VIA 65MM RING SHANK NAILS OR SCREWS INTO STUDS). THE BATTENS CREATE THE VENTILATED CAVITY BEHIND THE CLADDING.

FOR FIBRE CEMENT CLADDING, SCREWS MUST BE STAINLESS STEEL A2 OR A4 GRADE — STANDARD ZINC-PLATED SCREWS WILL CORRODE WITHIN 5 TO 10 YEARS IN THE WET CAVITY ENVIRONMENT AND PRODUCE RUST STREAKS ON THE CLADDING FACE.

STARTER TRIM AND BASE DETAIL: A PROPRIETARY STARTER TRIM OR PERFORATED CAVITY CLOSER AT THE BASE OF THE CLADDING ALLOWS WATER TO DRAIN FROM THE CAVITY WHILE EXCLUDING INSECTS AND SMALL ANIMALS. WITHOUT A CORRECTLY DETAILED BASE, NESTING AND INSECT ENTRY INTO THE CAVITY ARE COMMON.

Costs for External Cladding in London

CLADDING COSTS FOR LONDON RESIDENTIAL PROJECTS DEPEND ON MATERIAL CHOICE, FIX COMPLEXITY, AND SCAFFOLD REQUIREMENT. INDICATIVE COSTS FOR SUPPLY AND INSTALLATION ARE AS FOLLOWS.

FIBRE CEMENT CLADDING (CEDRAL CLICK, INCLUDING BATTENS, BREATHER MEMBRANE, STARTER TRIM AND CORNER TRIM, FIXINGS): £65 TO £110 PER M' INSTALLED ON A STRAIGHTFORWARD SINGLE-STOREY REAR EXTENSION ELEVATION.

WESTERN RED CEDAR CLADDING (FEATHER-EDGE, INCLUDING BATTENS, MEMBRANE, STAINLESS STEEL FIXINGS, CEDAR OIL TREATMENT): £75 TO £130 PER M'.

ACCOYA CLADDING (SHADOWCLAD OR FEATHER-EDGE, FACTORY PRIMED, INCLUDING BATTENS, MEMBRANE): £110 TO £180 PER M'.

KEBONY CLADDING (VERTICAL TONGUE-AND-GROOVE, INCLUDING BATTENS): £100 TO £160 PER M'.

FOR A TYPICAL LONDON REAR EXTENSION WITH 30M' OF CLADDED ELEVATION, TOTAL INSTALLED COST RANGES FROM £1,950 TO £5,400 DEPENDING ON MATERIAL SPECIFICATION — SIGNIFICANTLY LESS THAN A FULL RENDER SYSTEM ON THE SAME AREA AND WITH LOWER ONGOING MAINTENANCE REQUIREMENTS.

SCAFFOLD IS TYPICALLY NOT REQUIRED FOR SINGLE-STOREY REAR EXTENSION CLADDING — A SCAFFOLD TOWER IS USUALLY SUFFICIENT. SCAFFOLD WOULD ADD £500 TO £1,500 IF REQUIRED FOR HIGHER ELEVATIONS.

Frequently Asked Questions

Is timber cladding allowed on a London house under current fire regulations?
Yes, for houses (residential buildings below 11m height), combustible timber cladding is permitted subject to the installation of cavity fire barriers at each floor level and around openings. The October 2023 amendments to Approved Document B tightened requirements for buildings over 11m, but standard two-storey London houses are well below this threshold. For certainty, your architect or building engineer should confirm the applicable height and specify cavity barriers accordingly.
Does Cedral Click cladding need painting?
Cedral Click is factory-finished in through-colour — the pigment goes through the full board depth, not just the surface. It does not need painting and the factory finish is warranted for 15 years against fading. For a colour change after installation, Cedral recommends repainting with a suitable masonry or exterior silicate paint system. Unlike timber, fibre cement does not require regular oiling or staining for preservation.
What is the difference between a ventilated and a non-ventilated cladding cavity?
A ventilated (rainscreen) cavity has open joints or perforated details at the base and top of the cladding area that allow air to circulate through the 25mm+ air gap, drying out any moisture that penetrates behind the cladding. A closed cavity traps moisture, leading to condensation, mould growth, and timber decay. All correctly specified cladding systems are ventilated rainscreens — if a builder proposes to seal the base of a cladding cavity, this is technically incorrect.
How long does Accoya timber cladding last before needing maintenance?
Accoya with a transparent or semi-opaque microporous oil finish (Owatrol Scandinavian Classic, Sikkens Cetol or Remmers Aqua HSL) requires maintenance approximately every 3-5 years — recoating the surface after gentle washing. Left uncoated, Accoya weathers to a stable silver-grey without structural deterioration (the acetylation prevents the rot that would affect uncoated untreated softwood). The 50-year Accoya structural guarantee applies regardless of finish.
Do I need planning permission for cladding on a rear extension?
Cladding a rear extension that is itself permitted development (within PD limits) does not normally require separate planning permission — the material choice is part of the overall PD extension. However, in conservation areas, cladding that alters the external appearance of the original building or affects the conservation area character may require permission. A pre-application enquiry to the local planning authority is advisable in any conservation area or Article 4 Direction area.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.

Ready to Discuss Your Project?

Free site survey. No obligation. Covering all Greater London & M25.

📞 Call now💬 WhatsAppFree Quote