EV Charger Installation for London Homes: OZEV Grant, Pod Point, Andersen, Ohme, and Part P Guide

Home electric vehicle (EV) charger installation has become one of the most frequently requested electrical upgrades for London homeowners, driven by the rapid growth in EV and plug-in hybrid vehicle ownership and the significant cost savings of home charging versus public charge points. A 7kW home wallbox charges most EVs overnight from near-empty to full, at a cost of approximately £3 to £7 per 100 miles at domestic electricity tariffs — compared to £20 to £40 per 100 miles at public rapid chargers. Government grant support through the OZEV (Office for Zero Emission Vehicles) EV ChargePoint Grant makes home charger installation affordable for eligible properties. This guide covers the full installation process, grant eligibility, charger specification, electrical requirements, and Building Regulations compliance.

Key Takeaways

  • OZEV EV ChargePoint Grant: 75% up to £350 off installation — claimed by the installer, not the homeowner; must use OZEV-approved installer and approved chargepoint list
  • Top chargers: Pod Point Solo 3 (7.2kW, smart, widely installed), Andersen A2 (premium finish/cable management), Ohme Home Pro (smart tariff integration), Hypervolt Home 3 (IP65, solar divert), Zappi (solar-first charging)
  • Circuit: dedicated 6.0mm² radial circuit from consumer unit, protected by 40A Type B RCBO; DNO G100 notification to UKPN required for 7kW (32A) charger
  • DC fault protection: most modern approved chargers have built-in DC fault detection — confirm before specifying an external DC RCM
  • Smart tariff: Octopus Intelligent at ~7p/kWh overnight vs 26p/kWh standard — saves approximately £475/year at 10,000 miles/year
  • Zappi solar-divert mode (ECO+): charges only on excess solar generation — effectively free miles from 4kWp roof PV system (1,000-2,000 kWh/year free in London)
  • Installed cost (after £350 grant): simple installation £600-900; with groundworks to rear garage £900-1,800; premium Andersen A2 £1,400-2,500

OZEV EV ChargePoint Grant: Eligibility and Value

THE ELECTRIC VEHICLE CHARGEPOINT GRANT (FORMERLY THE OLEV DOMESTIC RECHARGING SCHEME AND BEFORE THAT THE EVHS) IS ADMINISTERED BY OZEV AND PROVIDES A GOVERNMENT GRANT OF 75% OF THE COST OF PURCHASING AND INSTALLING AN EV CHARGER AT A DOMESTIC PROPERTY, UP TO A MAXIMUM OF £350 PER CHARGER.

ELIGIBILITY CRITERIA AS OF 2025: THE PROPERTY MUST BE A DOMESTIC DWELLING (HOUSE, FLAT, OR BUNGALOW). THE VEHICLE ASSOCIATED WITH THE CHARGER MUST BE A PLUG-IN ELECTRIC VEHICLE (FULL BEV OR PLUG-IN HYBRID) FROM THE CURRENT OZEV APPROVED VEHICLE LIST. THE APPLICANT MUST INSTALL A CHARGER FROM THE APPROVED CHARGEPOINT LIST (SEE BELOW). THE INSTALLATION MUST BE CARRIED OUT BY AN OZEV-AUTHORISED INSTALLER.

FOR FLAT DWELLERS IN LONDON: THE GRANT FOR FLATS IS AVAILABLE ONLY WHERE THE CHARGER IS INSTALLED IN A PRIVATE OFF-STREET PARKING SPACE ASSOCIATED WITH THE FLAT (NOT A COMMUNAL AREA UNLESS A SEPARATE LANDLORD GRANT IS USED). MANY LONDON FLAT OWNERS DO NOT HAVE PRIVATE OFF-STREET PARKING AND ARE THEREFORE INELIGIBLE FOR THE DOMESTIC CHARGEPOINT GRANT. THE SEPARATELY FUNDED EV INFRASTRUCTURE GRANT FOR CAR PARKS (FOR LANDLORDS OF RESIDENTIAL BUILDINGS WITH 5 OR MORE FLATS) IS A DIFFERENT ROUTE.

PRACTICAL NOTE: MOST OZEV-AUTHORISED INSTALLATION COMPANIES (POD POINT, ANDERSEN, OHME, HYPERVOLT, ROLEC, CHARGEMASTER, ZAPPI BY MYENERGI) HANDLE THE GRANT CLAIM ON BEHALF OF THE HOMEOWNER — THE GRANT AMOUNT IS DEDUCTED FROM THE CUSTOMER'S INVOICE AT THE POINT OF INSTALLATION. THE HOMEOWNER DOES NOT NEED TO APPLY DIRECTLY. THE NET CUSTOMER COST AFTER THE £350 GRANT IS TYPICALLY £500 TO £900 FOR A STANDARD HOME CHARGER INSTALLATION.

Choosing a Home EV Charger: Pod Point, Andersen, Ohme, and Hypervolt

THE FOLLOWING CHARGERS ARE ON THE OZEV APPROVED CHARGEPOINT LIST AND ARE THE MOST WIDELY INSTALLED IN LONDON RESIDENTIAL PROPERTIES.

POD POINT SOLO 3 (7.2KW): THE MARKET-LEADING HOME EV CHARGER IN THE UK. POD POINT IS A BP-OWNED BRAND (NOW BP PULSE). THE SOLO 3 IS AN UNTETHERED SMART CHARGER (TYPE 2 SOCKET, NO CABLE INCLUDED — CABLE IS CONNECTED FROM THE VEHICLE SIDE), FEATURING: WI-FI AND 4G CONNECTIVITY FOR REMOTE MONITORING AND SCHEDULING; INTEGRATION WITH ENERGY TARIFFS (OVO ENERGY, OCTOPUS ENERGY, E.ON NEXT); OLEV/OZEV GRANT ELIGIBLE; IP54 WEATHER RATING; 7KW SINGLE-PHASE (32A) OUTPUT. THE POD POINT APP ALLOWS SCHEDULE SETTING, ENERGY TRACKING, AND SMART TARIFF INTEGRATION. RRP APPROXIMATELY £849 + INSTALLATION (LESS £350 GRANT).

ANDERSEN A2 (7.4KW): POSITIONED AS THE PREMIUM HOME EV CHARGER IN THE UK MARKET. THE ANDERSEN A2 IS DISTINGUISHED BY ITS PREMIUM BUILD QUALITY (ANODISED ALUMINIUM FACEPLATE, AVAILABLE IN MULTIPLE COLOURS AND MATERIALS INCLUDING TEAK WOOD, BESPOKE COLOUR MATCHING, BRUSHED STAINLESS STEEL) AND ITS CABLE MANAGEMENT SYSTEM (INTEGRATED CABLE RETRACTOR OR TETHERED CABLE HOLDER). THE A2 IS A TETHERED CHARGER (TYPE 2 CABLE INTEGRATED WITH RETRACTOR) OR UNTETHERED VERSION AVAILABLE. FEATURES: SOLAR INTEGRATION COMPATIBLE; ECO MODE FOR OFF-PEAK CHARGING; APP CONTROL AND SCHEDULING; OCPP PROTOCOL SUPPORT. RRP APPROXIMATELY £1,200 TO £2,000 DEPENDING ON FINISH + INSTALLATION (LESS £350 GRANT).

OHME HOME PRO (7.4KW): THE SMART TARIFF-INTEGRATED CHARGER. OHME'S PRIMARY DIFFERENTIATION IS DEEP INTEGRATION WITH SMART ENERGY TARIFFS — THE CHARGER AUTOMATICALLY CHARGES WHEN ELECTRICITY IS CHEAPEST (INCLUDING OCTOPUS AGILE AND INTELLIGENT OCTOPUS INTEGRATION, WHERE THE CHARGER IS DISPATCHED BY THE ENERGY SUPPLIER TO CHARGE AT OFF-PEAK OVERNIGHT RATES). THE OHME HOME PRO IS ALSO COMPATIBLE WITH HOME ENERGY MANAGEMENT SYSTEMS (GIVENENERGY, SOLIS, MYENERGI EDDI) TO OPTIMISE SOLAR SELF-CONSUMPTION. RRP APPROXIMATELY £799 + INSTALLATION (LESS £350 GRANT).

HYPERVOLT HOME 3 (7.3KW): HYPERVOLT IS A UK-FOUNDED MANUFACTURER. THE HOME 3 FEATURES IP65 WEATHERPROOFING (HIGHER THAN MOST COMPETITORS), INTEGRATED CABLE HOLDER, WI-FI AND APP CONTROL, SOLAR DIVERT CAPABILITY (ROUTES EXCESS SOLAR GENERATION TO THE EV RATHER THAN EXPORTING TO GRID), AND SMART CHARGING SCHEDULING. MANUFACTURED IN THE UK. RRP APPROXIMATELY £649 + INSTALLATION (LESS £350 GRANT).

ZAPPI BY MYENERGI (7KW / 22KW 3-PHASE): THE ZAPPI IS THE LEADING SOLAR-DIVERT CHARGER — DESIGNED SPECIFICALLY TO MAXIMISE EV CHARGING FROM ROOF-MOUNTED SOLAR PANELS. THE ZAPPI OPERATES IN THREE MODES: FAST (GRID POWER ONLY, 7KW), ECO (CHARGES FROM MINIMUM 1.4KW GRID PLUS ANY AVAILABLE SOLAR EXCESS), AND ECO+ (CHARGES ONLY WHEN SOLAR GENERATION EXCEEDS HOUSE CONSUMPTION — FREE SOLAR MILES). RRP APPROXIMATELY £799 + INSTALLATION (LESS £350 GRANT).

Electrical Requirements: Cable Sizing, Consumer Unit, and DNO Notification

HOME EV CHARGER INSTALLATION IS A NOTIFIABLE ELECTRICAL WORK UNDER BUILDING REGULATIONS PART P (ELECTRICAL SAFETY IN DWELLINGS). THE INSTALLATION MUST BE CARRIED OUT BY A PART P REGISTERED ELECTRICIAN AND SELF-CERTIFIED THROUGH A COMPETENT PERSON SCHEME (NAPIT, NICEIC, ELECSA) OR NOTIFIED TO THE LOCAL AUTHORITY BUILDING CONTROL.

CABLE SIZING FOR A 7KW (32A) HOME EV CHARGER: THE STANDARD CIRCUIT FOR A 7KW HOME EV CHARGER IS A DEDICATED RADIAL CIRCUIT FROM THE MAIN CONSUMER UNIT. THE CABLE IS TYPICALLY 6.0MM' TWO-CORE-AND-EARTH PVC-INSULATED (6242Y FLAT TWIN+EARTH) IN 19MM CONDUIT IN THE WALL, OR 6.0MM' SWA (STEEL WIRE ARMOURED) BURIED DIRECTLY IN THE GROUND TO AN EXTERNAL GARAGE OR CAR PORT CHARGE POINT. THE CABLE IS PROTECTED BY A 40A TYPE B RCBO (RESIDUAL CURRENT CIRCUIT BREAKER WITH OVERCURRENT PROTECTION) IN THE CONSUMER UNIT — NOT A STANDARD MCB, AS AN RCBO PROVIDES BOTH OVERCURRENT AND RCD PROTECTION ON THE SAME DEVICE.

DC FAULT PROTECTION: ALL EV CHARGERS THAT DO NOT HAVE BUILT-IN DC FAULT DETECTION (MODE 3 TYPE 2 AC CHARGERS CAN PRODUCE A DC COMPONENT TO THE FAULT CURRENT THAT MAY BLIND A STANDARD AC RCD) REQUIRE A SEPARATE DC FAULT PROTECTION DEVICE (DC RESIDUAL CURRENT MONITOR). MOST MODERN OZEV-APPROVED CHARGERS (POD POINT SOLO 3, ANDERSEN A2, OHME HOME PRO) HAVE BUILT-IN DC FAULT PROTECTION AND DO NOT REQUIRE AN EXTERNAL DC RCM — THE ELECTRICIAN SHOULD CONFIRM THIS FOR THE SPECIFIC CHARGER BEING INSTALLED.

DNO NOTIFICATION FOR 7KW CHARGER: CONNECTIONS UP TO 3.68KW (16A SINGLE PHASE) REQUIRE NO DNO (DISTRIBUTION NETWORK OPERATOR — IN LONDON, UK POWER NETWORKS UKPN) NOTIFICATION. CONNECTIONS OF 3.68KW TO 11KW (16A TO 48A SINGLE PHASE) REQUIRE A G100 DNO NOTIFICATION TO UKPN. FOR A 7KW (32A) CHARGER, A G100 NOTIFICATION IS REQUIRED — THE ELECTRICIAN TYPICALLY HANDLES THIS AS PART OF THE INSTALLATION. THE DNO NOTIFICATION IS NOT AN APPROVAL — IT IS A NOTIFICATION, AND UKPN WILL ONLY OBJECT IF THE LOCAL GRID GENUINELY CANNOT SUPPORT THE LOAD (RARE IN MOST LONDON RESIDENTIAL AREAS).

Smart Charging: Time-of-Use Tariffs and Solar Integration

THE REAL FINANCIAL BENEFIT OF HOME EV CHARGING IS ONLY REALISED WITH SMART CHARGING AND A TIME-OF-USE ELECTRICITY TARIFF.

OCTOPUS INTELLIGENT TARIFF (FORMERLY INTELLIGENT OCTOPUS): THE MOST POPULAR TIME-OF-USE EV CHARGING TARIFF IN THE UK. OCTOPUS ENERGY DISPATCH EV CHARGERS DIRECTLY (POD POINT, OHME, HYPERVOLT, ZAPPI, AND OTHERS ARE DIRECTLY INTEGRATED) TO CHARGE WHEN WHOLESALE ELECTRICITY PRICES ARE LOWEST — TYPICALLY 23:00 TO 05:30 AT A FLAT CHEAP RATE (APPROXIMATELY 7P TO 10P/KWH AS OF 2025). THE REST OF THE DAY, THE TARIFF IS A NORMAL DOMESTIC RATE (APPROXIMATELY 24P TO 28P/KWH). INTELLIGENT OCTOPUS CAN REDUCE EV HOME CHARGING COST BY 50 TO 70% COMPARED TO UNSCHEDULED DAY-RATE CHARGING.

OCTOPUS AGILE: A HALF-HOURLY VARIABLE TARIFF WHERE ELECTRICITY PRICES TRACK THE WHOLESALE MARKET — SOMETIMES NEGATIVE (MEANING THE ENERGY SUPPLIER PAYS THE CUSTOMER TO USE ELECTRICITY). SUITABLE FOR TECHNICALLY SOPHISTICATED USERS WHO WANT TO MAXIMISE SAVINGS BY SCHEDULING CHARGING TO THE LOWEST-COST HALF-HOURS.

SOLAR INTEGRATION: WHERE THE PROPERTY HAS A ROOF-MOUNTED SOLAR PV SYSTEM, A SOLAR-DIVERT CAPABLE CHARGER (ZAPPI ECO+/ECO MODE, OHME HOME PRO, HYPERVOLT SOLAR BOOST) INTEGRATES WITH A SOLAR GENERATION MONITOR (MYENERGI HARVI OR OHME SMART METER INTEGRATION) TO DETECT WHEN SURPLUS SOLAR GENERATION EXCEEDS HOUSEHOLD CONSUMPTION AND DIVERTS THE EXCESS TO CHARGE THE EV. THIS PROVIDES EFFECTIVELY FREE EV MILES FROM DAYTIME SOLAR GENERATION. FOR A TYPICAL LONDON HOUSE WITH 4KWP OF SOLAR, 1,000 TO 2,000 KWH OF FREE EV ENERGY PER YEAR IS ACHIEVABLE — EQUIVALENT TO 3,000 TO 7,000 FREE EV MILES.

Physical Installation Considerations for London Properties

LONDON RESIDENTIAL PROPERTIES PRESENT SOME SPECIFIC INSTALLATION CHALLENGES COMPARED TO RURAL OR SUBURBAN PROPERTIES.

CABLE ROUTE FROM CONSUMER UNIT TO PARKING SPACE: MOST LONDON TERRACES HAVE THE CONSUMER UNIT IN THE HALL OR UNDER THE STAIRS. THE CABLE ROUTE TO A FRONT PARKING SPACE (TYPICALLY CROSSED BY A VEHICLE CROSSOVER THROUGH THE PAVEMENT) OR REAR PARKING SPACE (VIA A GARAGE OR REAR YARD) MAY REQUIRE DRILLING THROUGH WALLS, LAYING UNDERGROUND SWA CABLE IN CONDUIT AT 600MM MINIMUM DEPTH (UNDER DRIVEWAYS), OR RUNNING ALONG THE OUTSIDE OF THE BUILDING IN SWA CABLE PROTECTED BY EXTERNAL TRUNKING OR CONDUIT.

COMSUMER UNIT CAPACITY: OLDER LONDON TERRACES MAY HAVE SMALLER CONSUMER UNITS WITH LIMITED WAYS (NUMBER OF CIRCUIT POSITIONS). ADDING A DEDICATED 32A CIRCUIT FOR AN EV CHARGER MAY REQUIRE EITHER A REPLACEMENT CONSUMER UNIT (TYPICAL COST £400 TO £800 AS PART OF THE EV INSTALLATION) OR A SECONDARY DISTRIBUTION BOARD (WHERE A SPARE WAY IS NOT AVAILABLE IN THE MAIN UNIT).

PHASE AND SUPPLY CAPACITY: STANDARD LONDON RESIDENTIAL SUPPLY IS SINGLE-PHASE 100A (CUTOUT FUSE 100A). A 7KW (32A) EV CHARGER USES 32% OF THE MAXIMUM AVAILABLE SUPPLY CURRENT AND IS WELL WITHIN THE 100A SERVICE SUPPLY FOR A STANDARD TERRACE. ONLY IN EXCEPTIONAL CASES (VERY HIGH EXISTING ELECTRICAL LOAD, OR DESIRE TO INSTALL 22KW THREE-PHASE CHARGING) WOULD A SUPPLY UPGRADE FROM UKPN BE NEEDED.

CONSERVATION AREAS AND LISTED BUILDINGS: SOME LONDON CONSERVATION AREAS AND ALL GRADE I AND GRADE II* LISTED BUILDINGS REQUIRE PLANNING CONSENT FOR NEW EXTERNAL ELECTRICAL EQUIPMENT. WHERE THE CHARGE POINT IS ON THE EXTERNAL WALL OF A LISTED BUILDING, OR HIGHLY VISIBLE FROM THE PUBLIC HIGHWAY IN A CONSERVATION AREA, PLANNING ADVICE SHOULD BE SOUGHT BEFORE INSTALLATION. IN MOST CASES, A DISCREETLY POSITIONED CHARGER ON A GARDEN WALL OR GARAGE DOES NOT REQUIRE CONSENT.

Costs for EV Charger Installation in London

INDICATIVE COSTS FOR STANDARD HOME EV CHARGER INSTALLATION IN LONDON (AFTER APPLYING £350 OZEV GRANT WHERE ELIGIBLE) ARE AS FOLLOWS.

STANDARD SIMPLE INSTALLATION (CONSUMER UNIT TO CHARGER DIRECT INTERNAL ROUTE, CABLE UNDER 10M, NO GROUNDWORKS): £600 TO £900 INSTALLED, AFTER £350 GRANT. THIS COVERS THE MAJORITY OF LONDON TERRACES WHERE THE CONSUMER UNIT IS IN THE HOUSE NEAR THE FRONT WALL AND THE CHARGE POINT IS ON THE EXTERNAL FRONT WALL ABOVE A DRIVEWAY OR FRONT PARKING SPACE.

INSTALLATION WITH GROUNDWORKS (UNDERGROUND SWA CABLE TO REAR GARAGE OR OUTBUILDING, CABLE OVER 15M, INCLUDING TRENCH EXCAVATION): £900 TO £1,800 AFTER GRANT. THE EXTRA COST IS FOR GROUNDWORKS: EXCAVATING A TRENCH, LAYING 100MM CONDUIT IN SAND BED, INSTALLING SWA 6.0MM' THREE-CORE CABLE, AND REINSTATEMENT OF PATHWAY OR DRIVEWAY SURFACE.

INSTALLATION REQUIRING NEW OR UPGRADED CONSUMER UNIT (CU FULL, OR OUTDATED FUSE BOARD NEEDING REPLACEMENT WITH RCBO CONSUMER UNIT): ADD £400 TO £800 TO ABOVE COSTS.

PREMIUM CHARGER (ANDERSEN A2 WITH CABLE MANAGEMENT): TOTAL INSTALLED COST AFTER GRANT TYPICALLY £1,400 TO £2,500, REFLECTING HIGHER UNIT COST.

ANNUAL RUNNING COST COMPARISON: FULLY ELECTRIC CAR USING APPROXIMATELY 25KWH PER 100 MILES. WITH OCTOPUS INTELLIGENT (7P/KWH OVERNIGHT): 25KWH X 7P = £1.75 PER 100 MILES. WITH STANDARD RATE (26P/KWH): 25KWH X 26P = £6.50 PER 100 MILES. AT 10,000 MILES/YEAR, INTELLIGENT TARIFF SAVES APPROXIMATELY £475 PER YEAR IN HOME CHARGING COSTS VERSUS STANDARD-RATE HOME CHARGING.

Frequently Asked Questions

Am I eligible for the OZEV EV ChargePoint Grant if I live in a flat?
Eligibility for the domestic EV ChargePoint Grant requires a private off-street parking space associated with your home — not a communal car park. If you have a private garage or dedicated parking bay, you are likely eligible. If your parking is communal or on-street, the domestic grant does not apply. There is a separate Residential EV Infrastructure Grant (REVIG) for landlords of residential buildings with 5 or more flats, which covers up to 75% of installation costs for communal charge points.
What is a tethered versus untethered EV charger?
A tethered charger has the charging cable permanently attached to the unit — you plug the other end (Type 2 connector) into your vehicle. Convenient because you never forget the cable, but it is exposed to weather, UV, and physical damage. An untethered charger has a Type 2 socket on the wall unit — you plug your own cable from the vehicle side. More versatile if you have multiple vehicles with different connectors, and the socket is more weather-resistant without a cable hanging from it. For a London home with one or two EVs of the same type, either works equally well.
Is a 7kW home charger much faster than a 3.6kW one?
Yes — significantly. A 3.6kW (16A) charger adds approximately 14-15 miles of range per hour of charging. A 7kW (32A) charger adds approximately 28-30 miles per hour. For a 60kWh battery EV with 50 miles remaining, a 3.6kW charger takes approximately 7 hours to reach 80% charge; a 7kW charger takes approximately 3.5 hours. For most UK EVs (60-100kWh battery), a 7kW overnight charge is enough to fully charge from near-empty in 8-12 hours. The 7kW charger costs more to install but is worth specifying for all but the smallest EVs.
Do I need planning permission for an EV charger on my house?
For most London terraces, no — installing an EV charger is permitted development under the Town and Country Planning Act (Schedule 2, Part 2, Class L) provided the charger is within 2 cubic metres in volume (they all are) and the cable connection is underground or follows the wall surface. However, if your property is a Listed Building or in a Conservation Area, the rules are different — external electrical equipment on a listed building or highly visible from a public highway in a conservation area may require Listed Building Consent or planning permission. Always check with your local planning authority before installation if you have any doubt.
Can my electrician also claim the OZEV grant?
No — the electrician (installer) must be registered as an OZEV Authorised Installer and must be an approved installer for the specific charger brand being fitted. The charger itself must be on the OZEV Approved Chargepoint List. Most of the leading charger brands (Pod Point, Ohme, Andersen, Hypervolt, Zappi, Wallbox) operate their own OZEV-authorised installer networks. When getting quotes, confirm the installer is OZEV-authorised, Part P registered, and check that the charger model is currently on the approved list at the OZEV website before committing.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.