Contents
Why Traditional Felt Fails and What Replaces It
TRADITIONAL BUILT-UP FELT ROOFING (ALSO CALLED MINERAL FELT OR THREE-LAYER FELT) WAS THE DOMINANT FLAT ROOFING SYSTEM IN LONDON RESIDENTIAL CONSTRUCTION FROM THE 1950S THROUGH TO THE 1990S. IT CONSISTS OF TWO OR THREE LAYERS OF BITUMEN-SATURATED GLASS FIBRE OR POLYESTER FELT, LAID IN HOT BITUMEN OR SELF-ADHESIVE VERSIONS, WITH A MINERAL CHIPPING OR SAND FINISH ON THE UPPERMOST LAYER.
THE DESIGN LIFE OF TRADITIONAL BUILT-UP FELT IS 10-15 YEARS UNDER TYPICAL UK CONDITIONS. IT FAILS THROUGH: UV DEGRADATION OF THE BITUMEN (CAUSING SURFACE CRAZING AND MICRO-CRACKING); THERMAL CYCLING STRESS (FLAT ROOFS EXPERIENCE SIGNIFICANTLY GREATER TEMPERATURE EXTREMES THAN PITCHED ROOFS — SURFACE TEMPERATURES CAN REACH 70-80°C IN DIRECT SUMMER SUN); FOOT TRAFFIC PUNCTURE; POOR DETAILING AT UPSTANDS, OUTLETS, ROOFLIGHTS, AND PERIMETERS WHERE WATER INGRESS FIRST OCCURS; AND LACK OF MAINTENANCE ALLOWING PONDING WATER AND DEBRIS ACCUMULATION AT OUTLETS.
THE MODERN ALTERNATIVES TO TRADITIONAL FELT ARE:
TORCH-ON SBS MODIFIED BITUMEN (POLYESTER OR GLASS FIBRE CARRIER): STILL BITUMEN-BASED BUT WITH STYRENE-BUTADIENE-STYRENE (SBS) POLYMER MODIFICATION GIVING ENHANCED FLEXIBILITY AND UV RESISTANCE. PRODUCTS INCLUDE SOPREMA ELASTOPHENE FLAM PLUS, BAUDER TORCHON, AND IKO ARMOURPLAN SBS. TORCH-ON APPLICATION REQUIRES A HOT-TORCH QUALIFIED APPLICATOR. DESIGN LIFE: 15-25 YEARS. SUITABLE FOR LOW-PITCH AND FLAT APPLICATIONS WITH SUITABLE SUBSTRATE.
EPDM (ETHYLENE PROPYLENE DIENE MONOMER) RUBBER MEMBRANE: SINGLE-PLY VULCANISED RUBBER MEMBRANE — HIGHLY ELASTIC (300-400% ELONGATION), UV-STABLE, TEMPERATURE-RESISTANT (-40°C TO +150°C). PRODUCTS: FIRESTONE RUBBERCOVER (1.14MM AND 1.52MM), CLASSICBOND EPDM (1.2MM), CARLISLE SURE-SEAL (1.14MM). LOOSE-LAID OR FULLY-BONDED (FULLY-BONDED PREFERRED FOR BETTER WIND-UPLIFT RESISTANCE). SEAMS JOINED WITH SPECIALIST TAPE (FIRESTONE QUICKSEAM). DESIGN LIFE: 30-50 YEARS WITH PROPER INSTALLATION. EXCELLENT FOR SMALL ROOFS AND DIY-ACCESSIBLE APPLICATIONS WHERE SEAM FREQUENCY IS LOW.
GRP (GLASS REINFORCED POLYESTER, FIBREGLASS): COLD-APPLIED SYSTEM — FIBREGLASS MATTING SATURATED WITH POLYESTER RESIN, FINISHED WITH GRP TOPCOAT. CREATES A SEAMLESS RIGID WATERPROOF SHELL. PRODUCTS: CROMAR GRP FLAT ROOFING SYSTEM, RUBERGLAS, BBA-CERTIFIED SYSTEMS FROM SEVERAL MANUFACTURERS. DESIGN LIFE: 25-40 YEARS. EXCELLENT FOR COMPLEX SHAPES AND AROUND ROOFLIGHTS. BRITTLE AT LOW TEMPERATURES — SHOULD NOT BE WALKED ON HEAVILY WITHOUT SACRIFICIAL WALKWAY PADS.
SINGLE-PLY PVC AND TPO MEMBRANES: SIKA SARNAFIL G410-15EL (PVC, 1.5MM) AND S327-12EL (PVC, 1.2MM); ICOPAL/MONARPLAN PVC; FIRESTONE ULTRAPLY TPO. FACTORY-WELDED OR HOT-AIR-WELDED SEAMS — EXTREMELY RELIABLE JOINT IF EXECUTED BY A TRAINED OPERATOR. MECHANICALLY FIXED (SCREWS INTO DECKING) OR FULLY BONDED. DESIGN LIFE: 25-40 YEARS. PREFERRED SYSTEM FOR COMMERCIAL AND LARGER RESIDENTIAL FLAT ROOFS — DOMINANT SYSTEM ON LONDON REAR EXTENSION ROOFS WHERE ARCHITECTS SPECIFY A MEMBRANE SYSTEM.
Flat Roof Build-Up: Warm Roof vs Cold Roof
THE THERMAL BUILD-UP OF THE FLAT ROOF IS AS IMPORTANT AS THE WATERPROOFING MEMBRANE. GETTING THIS WRONG CAUSES CONDENSATION WITHIN THE ROOF STRUCTURE AND DRAMATICALLY SHORTENS ITS LIFE.
COLD ROOF CONSTRUCTION (TRADITIONAL — NOT RECOMMENDED FOR NEW WORK): - STRUCTURAL DECK (TIMBER JOISTS + PLYWOOD, OR CONCRETE) - VENTILATED AIR SPACE (TYPICALLY 50MM MINIMUM, CROSS-VENTILATED VIA PERIMETER) - WATERPROOFING MEMBRANE ON TOP OF THE DECK - INSULATION BELOW THE DECK (IN THE CEILING) PROBLEMS: REQUIRES PRECISE CROSS-VENTILATION — VERY DIFFICULT TO ACHIEVE IN PRACTICE ON EXISTING BUILDINGS. CONDENSATION RISK IN THE AIR SPACE WHERE VENTILATION IS INADEQUATE. GENERALLY AVOIDED IN NEW CONSTRUCTION SINCE PART L 2021.
WARM ROOF CONSTRUCTION (CURRENT BEST PRACTICE): - STRUCTURAL DECK (TYPICALLY 18-22MM T&G PLYWOOD, P5/P6 MOISTURE-RESISTANT GRADE — CABERFLOOR, EGGER) - VAPOUR CONTROL LAYER (VCL) ABOVE THE DECK — PREVENTS WARM MOIST AIR FROM THE INTERIOR MIGRATING INTO THE INSULATION (DUPONT AIRGUARD SD5 OR ISOVER VARIO KM DUPLEX RECOMMENDED — VARIABLE PERMEABILITY TYPE PREFERRED) - RIGID INSULATION ABOVE VCL: TYPICALLY POLYISOCYANURATE (PIR) — IKO ENERTHERM, XTRATHERM THIN-R, OR CELOTEX GA4000. FOR 0.18 W/M²K (PART L 2021 MINIMUM): APPROXIMATELY 120-150MM PIR INSULATION. FOR 0.15 W/M²K (ENHANCED PERFORMANCE): 150-170MM. - WATERPROOFING MEMBRANE ON TOP OF INSULATION - NO VENTILATED SPACE — THE INSULATION IS WARM (ABOVE THE VCL) SO CONDENSATION CANNOT FORM WITHIN IT ADVANTAGE: ELIMINATES INTERSTITIAL CONDENSATION RISK; EASIER TO DETAIL CORRECTLY; LONGER MEMBRANE LIFE (INSULATION BUFFERS THERMAL EXTREMES)
INVERTED ROOF (UPSIDE-DOWN ROOF) — ALTERNATIVE: - STRUCTURAL DECK - WATERPROOFING MEMBRANE DIRECTLY ON DECK - INSULATION ON TOP OF MEMBRANE (EXTRUDED POLYSTYRENE — STYRODUR, KINGSPAN STYROZONE, OR FOAMGLAS) - BALLAST (GRAVEL, PAVING SLABS, OR GREEN ROOF SUBSTRATE) ON TOP OF INSULATION ADVANTAGE: MEMBRANE PROTECTED FROM UV AND THERMAL EXTREMES BY INSULATION AND BALLAST — VERY LONG MEMBRANE LIFE. DISADVANTAGE: REQUIRES RAINWATER FACTOR (ADDITIONAL 20-25% INSULATION THICKNESS) FOR DESIGN U-VALUE.
FALLS (DRAINAGE): ALL FLAT ROOFS MUST HAVE ADEQUATE FALLS TO DRAINAGE OUTLETS — MINIMUM 1:80 (1.25%) PREFERRED, ABSOLUTE MINIMUM 1:80 FOR WARM ROOFS, 1:60 FOR INVERTED ROOFS. PONDING WATER ON A FLAT ROOF IS NOT ACCEPTABLE — IT ACCELERATES MEMBRANE DEGRADATION AND RISKS STRUCTURAL OVERLOAD (1MM WATER DEPTH = 1KG/M² ADDITIONAL LOAD). FALLS CAN BE CREATED BY: TAPERED INSULATION BOARDS (XTRATHERM TAPERED PIR — CUSTOM-CUT TO SPECIFIC DRAINAGE PATTERN); FIRRING PIECES ON FLAT JOISTS; OR EXISTING FALL IF ADEQUATE.
Detailing: Where Flat Roofs Fail
THE MAJORITY OF FLAT ROOF FAILURES OCCUR AT DETAILS RATHER THAN IN THE FIELD OF THE MEMBRANE. THE CRITICAL DETAILS ARE:
UPSTANDS AT PARAPET WALLS AND ABUTMENTS: THE MEMBRANE MUST TURN UP AGAINST VERTICAL SURFACES TO A MINIMUM HEIGHT OF 150MM ABOVE THE FINISHED ROOF LEVEL (BS 6229:2018 SPECIFIES 150MM MINIMUM). THE UPSTAND MUST BE SECURED AT THE TOP WITH A CONTINUOUS METAL COUNTER-FLASHING (LEAD CODE 4 MINIMUM, ALUMINIUM, OR SPECIALIST SYSTEM TRIM) FIXED TO THE WALL AND LAPPED OVER THE MEMBRANE UPSTAND BY MINIMUM 75MM. A COMMON DEFECT IS UPSTANDS LESS THAN 150MM — THIS ALLOWS WINDBLOWN RAIN AND SNOW TO PASS BEHIND THE MEMBRANE AT THE TOP.
OUTLET DETAILS: THE ROOF DRAIN OR OUTLET IS THE MOST CRITICAL POINT ON THE ROOF — WHERE WATER IS CONCENTRATED AND WHERE DETRITUS ACCUMULATES. OUTLETS MUST BE: LOCATED AT THE LOWEST POINT OF THE ROOF DRAINAGE ZONE; HAVE AN INTEGRAL SUMP THAT ALLOWS THE MEMBRANE TO BOND INTO THE OUTLET; AND BE ACCESSIBLE AND CLEANABLE. TYPICAL OUTLETS: ACO KLICK TOP DRAIN, SITA ROOF DRAINS, OR WADE ROOF OUTLETS — ALL WITH INSPECTION COVERS. FLAT ROOF OUTLETS MUST BE CLEANED ANNUALLY.
ROOFLIGHT AND SKYLIGHT DETAILS: VELUX INTEGRA FLAT ROOF WINDOWS (GGU-CA) OR KORNICHE ROOF LANTERNS HAVE INTEGRAL KERBS THAT ACCEPT THE FLAT ROOF MEMBRANE UPSTAND. THE CRITICAL DETAIL IS THE CORNER JUNCTION BETWEEN THE KERB AND THE MEMBRANE — ALWAYS FACTORY-PRE-FORMED CORNER PIECES OR A LIQUID WATERPROOFING DETAIL (SIKA LIQUID PLASTICS OR FIBREGLASS RESIN) AT INTERNAL CORNERS. AVOID TRYING TO FOLD EPDM OR SINGLE-PLY AT CORNERS — THE FOLD ALWAYS THINNED AT THE CORNERS.
PERIMETER EDGES: DRIP EDGES AND TRIMS AT THE PERIMETER CONTROL WHERE WATER LEAVES THE ROOF. TYPICAL SYSTEMS: FOLDED ALUMINIUM TRIM (SIKA ROOF EDGING, IKO PERMATRIM) MECHANICALLY FIXED TO THE DECK WITH FIXINGS AT 300MM CENTRES; OR LEAD FASCIA FLASHING (CODE 5 LEAD FOLDED OVER THE DECK EDGE AND DRESSED DOWN). THE MEMBRANE MUST BOND OR MECHANICALLY FIX INTO THE TRIM CONTINUOUSLY — A GAP BETWEEN MEMBRANE AND TRIM EDGE IS AN IMMEDIATE INGRESS POINT.
Costs by System (London Market)
FLAT ROOF REPLACEMENT COSTS FOR LONDON RESIDENTIAL PROPERTIES (LABOUR + MATERIALS, 2025-2026):
BAY WINDOW TOP FLAT ROOF (TYPICAL 2M X 1.5M = 3M²): - EPDM FIRESTONE RUBBERCOVER 1.14MM: £450-900 COMPLETE (SMALL ROOFS HAVE HIGH MINIMUM CHARGE) - GRP FIBREGLASS: £500-900 - SINGLE-PLY PVC (SIKA SARNAFIL): £600-1,100 (MINIMUM MOBILISATION CHARGE)
REAR ADDITION FLAT ROOF (TYPICAL 15-25M²): - EPDM 1.14MM: £1,800-3,500 - GRP FIBREGLASS: £2,200-4,000 - SINGLE-PLY PVC/TPO: £2,500-4,500 - TORCH-ON SBS: £1,500-3,000
GARAGE FLAT ROOF (TYPICAL 20-30M²): - EPDM 1.14MM: £2,000-4,000 - GRP FIBREGLASS: £2,500-5,000 - SINGLE-PLY PVC: £3,000-5,500
REAR EXTENSION NEW BUILD FLAT ROOF (TYPICAL 20-40M², WARM ROOF FULL BUILD-UP): - SINGLE-PLY PVC/TPO WITH WARM ROOF: £4,000-9,000 (INCLUDES STRUCTURAL DECK, VCL, PIR INSULATION, MEMBRANE, DETAILING) - EPDM WITH WARM ROOF: £3,500-8,000
COST DRIVERS: SYSTEM CHOICE; SIZE OF ROOF (LARGE ROOFS HAVE BETTER £/M² VALUE); ACCESSIBILITY (SCAFFOLD REQUIRED?); EXISTING DECK CONDITION (DECK REPLACEMENT ADDS £20-40/M²); NUMBER AND COMPLEXITY OF DETAILS (ROOFLIGHTS, OUTLETS, ABUTMENTS); AND UPSTAND HEIGHT SPECIFICATION.
HOW TO COMPARE QUOTES: ENSURE QUOTES SPECIFY: MEMBRANE MANUFACTURER AND PRODUCT (E.G. FIRESTONE RUBBERCOVER 1.14MM); INSULATION SPECIFICATION AND U-VALUE; DECK MATERIAL AND THICKNESS; OUTLET TYPE AND NUMBER; GUARANTEE LENGTH AND MANUFACTURER-BACKED NATURE; AND WHAT HAPPENS TO OLD MEMBRANE (STRIP AND DISPOSE, OR LAY OVER).
Finding and Vetting Contractors
FLAT ROOFING QUALITY VARIES DRAMATICALLY IN THE LONDON MARKET. THE FOLLOWING CHECKS HELP IDENTIFY COMPETENT CONTRACTORS:
MEMBRANE MANUFACTURER TRAINING AND CERTIFICATION: - FIRESTONE CERTIFIED APPLICATOR (FOR RUBBERCOVER EPDM) - SIKA SARNAFIL QUALIFIED CONTRACTOR (FOR SARNAFIL PVC/TPO) - BAUDER LICENSED CONTRACTOR - IKO PRONTO ACCREDITED CONTRACTOR MANUFACTURER CERTIFICATION MEANS THE CONTRACTOR HAS PASSED TRAINING AND CAN ISSUE A MANUFACTURER-BACKED GUARANTEE (TYPICALLY 15-25 YEARS). MANUFACTURER GUARANTEES ARE MORE RELIABLE THAN CONTRACTOR-ONLY GUARANTEES.
PROFESSIONAL MEMBERSHIP: - NATIONAL FEDERATION OF ROOFING CONTRACTORS (NFRC): THE PRINCIPAL ROOFING INDUSTRY BODY — MEMBERS MUST PASS TECHNICAL AND FINANCIAL VETTING - COMPETENT ROOFER REGISTRATION (CPS ROOFER): A GOVERNMENT-ENDORSED COMPETENT PERSON SCHEME FOR ROOFING WORK — MEMBERS SELF-CERTIFY COMPLETION UNDER BUILDING REGULATIONS
RED FLAGS TO AVOID: - CASH-ONLY CONTRACTORS WITH NO VAT REGISTRATION - CONTRACTORS WHO CANNOT NAME THE SPECIFIC MEMBRANE PRODUCT - PROPOSALS TO LAY NEW MEMBRANE DIRECTLY OVER EXISTING WITHOUT STRIPPING (EXCEPT WHERE EXISTING DECK IS CONFIRMED SOUND BY SURVEY) - GUARANTEES THAT ARE ONLY FROM THE CONTRACTOR (NO MANUFACTURER BACKING) - VERY CHEAP QUOTES THAT OMIT WARM ROOF INSULATION SPECIFICATION OR PROPOSE COLD ROOF FOR NEW INSTALLATION
PLANNING PERMISSION: LIKE-FOR-LIKE FLAT ROOF REPLACEMENT IS NORMALLY PERMITTED DEVELOPMENT. CHANGING A FLAT ROOF TO A PITCHED ROOF MAY REQUIRE PLANNING PERMISSION (CHANGE OF ROOF FORM). ADDING A ROOFLIGHT OR INCREASING PARAPET HEIGHT MAY ALSO REQUIRE CONSENT. CONFIRM WITH YOUR LOCAL PLANNING AUTHORITY IF IN DOUBT.
Frequently Asked Questions
How long does a flat roof last?▼
What is the best flat roof system for a London home?▼
Is a warm roof better than a cold roof?▼
Does a flat roof replacement need planning permission?▼
How much does it cost to replace a flat roof in London?▼
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.