Full House Rewire for London Victorian Terraces: 18th Edition BS 7671, Consumer Units, and Part P

A full house rewire is one of the most significant and most disruptive building works in a London Victorian terrace — but in a property where the electrical installation dates from before approximately 1970 (rubber-insulated wiring, round-pin sockets, and a Wylex rewireable fuse board), it is also one of the most important safety works that can be carried out. The electrical installation in a London Victorian terrace built between 1860 and 1930 was originally designed for a lighting load only (the late Victorian and Edwardian terrace had minimal power sockets — typically one or two per room at most), and the wiring insulation in original Victorian electrical installations (rubber, vulcanised rubber, or early PVC) will have degraded significantly over 60-100 years — potentially to a condition where the insulation has cracked, split, or shrunk away from the conductor, exposing live conductors or causing high earth-fault resistance. This guide covers the specification, sequencing, and cost of a full house rewire in a London Victorian terrace.

Key Takeaways

  • Rewire triggers: rubber-insulated VIR wiring (pre-1960) = end-of-life, rewire immediately; 1960s-70s PVC wiring = get EICR first; consumer units requiring replacement: Wylex rewireable fuse board (ceramic fuseway covers, rewireable fuse wire), BS 3036 rewireable, BS 1361 cartridge without RCDs; EICR codes: C1 = danger present (immediate), C2 = potentially dangerous (urgent — absent earthing/bonding/RCD protection, deteriorated insulation), C3 = improvement recommended, FI = further investigation; renovation trigger: open renovation = lowest cost rewire window (before plastering, no making good required); surface rewire (through closed walls): add 30-50% to labour cost + replastering of chased channels; Part P: all new circuits + special locations (kitchen, bathroom, garden) = notifiable; NICEIC Domestic Installer/ELECSA/NAPIT: self-certify without Building Control; EIC (Electrical Installation Certificate) issued on completion = required for conveyancing
  • Consumer unit specification: 18th Edition BS 7671 (2018): non-combustible (metal) enclosure mandatory for new domestic consumer units; Hager VML910 (Hager UK, Telford — most widely specified dual-RCD board by NICEIC Domestic Installers 2023-2025): 10-way, 100A isolator, 2 x 63A 30mA type AC RCDs, metal enclosure, supply ~£60-90 (without MCBs); limitation: dual-RCD = group protection — fault on one circuit trips all 5 in group; Schneider RESI9 (Schneider Electric, Grenoble — most widely specified all-RCBO board): individual RCBO per circuit (MCB + 30mA RCD combined in one module per circuit), fault on one circuit trips only that RCBO; 18-way RESI9 with 14-16 RCBOs supply: £200-350; RCBO unit cost ~£8-15 each vs MCB ~£3-6; all-RCBO board premium over dual-RCD: ~£80-200 for typical Victorian terrace — strongly recommended for all new rewires
  • Circuit design (standard 12-16 circuit Victorian terrace 2-3 bed rewire): ring mains (20A MCB/RCBO, 2.5mm² T+E ring): ground floor ring, first floor ring, kitchen ring (dedicated); lighting circuits (6A, 1.5mm² T+E): ground floor, first floor, loft; dedicated high-load circuits: cooker (32A/40A, 6mm² — for >4kW range/cooker), dishwasher (13A fused spur or 20A radial), washing machine (20A radial, 2.5mm²), electric shower (40A, 10mm² — for 10.5kW shower), immersion heater (16A radial on time clock, 2.5mm²), EV charger provision (32A RCBO, 6mm² T+E pre-run to charger location — install during rewire even if charger not yet fitted), outdoor socket (RCD protected, 13A radial)
  • Earthing, bonding, and SPD (18th Edition): London TN-S or TN-C-S (PME) earthing: earthing conductor 16-25mm² green/yellow from DNO cut-out to MET (Main Earthing Terminal) at consumer unit; main equipotential bonding (BS 7671 Chapter 54 MANDATORY): gas service: 10mm² bonding conductor from gas meter/incoming pipe (within 600mm of building entry) to MET; water supply: 10mm² bonding conductor from stop cock/incoming pipe (within 600mm of entry) to MET; absent bonding = C2 on EICR; water: check if incoming pipe is now mdpe plastic (not metal) — may leave a section of metal pipework unbonded; SPD (18th Edition Section 443.4): Type 2 SPD mandatory where risk assessment indicates transient overvoltages could cause danger — standard interpretation for London Victorian terrace with modern electronics = SPD required; Hager VZSPH (or equivalent Schneider/Eaton Type 2, 100kA 8/20 waveform): supply £20-40; fit at consumer unit during rewire — negligible additional cost
  • Programme and costs London 2025 (NICEIC Domestic Installer, supply and fit, first + second fix, open renovation preferred): first fix (during open renovation, before plastering): 2 electricians x 2-4 days; second fix (after decoration/near-completion): 2 electricians x 2-3 days; 2-bedroom Victorian terrace (12 circuits, Hager VML910 dual-RCD, standard sockets/switches): £3,500-5,500; 3-bedroom Victorian terrace (14-16 circuits, Schneider RESI9 all-RCBO, chrome sockets/switches): £4,500-7,000; RCBO upgrade add-on: £80-200; EV charger provision circuit (6mm² cable pre-run during rewire): £80-150; SPD: £20-40; surface rewire premium (closed walls): +30-50% labour + replastering costs; EIC (Electrical Installation Certificate) + Part P notification: included in NICEIC installer cost; consumer unit brands: Hager, Schneider (RESI9), Eaton (MEM Memshield 3), Legrand, Wylex (NH Series) — all acceptable; avoid unbranded consumer units

When Is a Full House Rewire Required?

THE DECISION TO REWIRE A LONDON VICTORIAN TERRACE IS NOT ALWAYS STRAIGHTFORWARD — THE ELECTRICAL INSTALLATION MAY APPEAR TO FUNCTION WITHOUT PROBLEMS WHILE HAVING SIGNIFICANT HIDDEN SAFETY DEFICIENCIES. THE FOLLOWING INDICATORS STRONGLY SUGGEST THAT A FULL REWIRE IS REQUIRED RATHER THAN PARTIAL REPAIRS.

AGE OF INSTALLATION: ANY ELECTRICAL INSTALLATION IN A LONDON VICTORIAN TERRACE THAT HAS NOT BEEN FULLY REWIRED SINCE APPROXIMATELY 1960 SHOULD BE CONSIDERED FOR REWIRING. PRE-1960 WIRING MATERIALS (RUBBER-INSULATED WIRING — VIR — VULCANISED INDIA RUBBER — OR LEAD-SHEATHED WIRING) SHOULD BE CONSIDERED END-OF-LIFE AND REWIRED WITHOUT DELAY. 1960S-1970S PVC-INSULATED WIRING: STILL TECHNICALLY SERVICEABLE IN MANY CASES — BUT THE PVC INSULATION FROM THIS ERA (PARTICULARLY THE EARLY PVC FORMULATIONS WITH LOWER PLASTICISER CONTENT) IS OFTEN BRITTLE AND PRONE TO CRACKING WHEN DISTURBED — AN ELECTRICAL INSTALLATION CONDITION REPORT (EICR) BY A QUALIFIED ELECTRICIAN WILL IDENTIFY WHETHER THE CONDITION OF THE WIRING MERITS FULL REWIRING OR IS ADEQUATE FOR CONTINUED USE (WITH REPAIRS).

ELECTRICAL INSTALLATION CONDITION REPORT (EICR): AN EICR (ALSO KNOWN AS A PERIODIC INSPECTION REPORT) IS THE FORMAL ASSESSMENT OF AN EXISTING ELECTRICAL INSTALLATION BY A REGISTERED ELECTRICIAN — CLASSIFIED UNDER BS 7671 AS: C1 — DANGER PRESENT (IMMEDIATE RISK OF INJURY — MUST BE RECTIFIED IMMEDIATELY); C2 — POTENTIALLY DANGEROUS (REQUIRES URGENT ATTENTION — SHOULD BE RECTIFIED AS SOON AS POSSIBLE); C3 — IMPROVEMENT RECOMMENDED (NOT IMMEDIATELY DANGEROUS — BUT IMPROVEMENT WOULD BE BENEFICIAL); FI — FURTHER INVESTIGATION REQUIRED. AN EICR WITH C1 OR C2 CODES INDICATES THAT THE INSTALLATION IS NOT SAFE FOR CONTINUED USE WITHOUT RECTIFICATION — IN A LONDON VICTORIAN TERRACE WITH ORIGINAL OR EARLY REPLACEMENT WIRING, AN EICR TYPICALLY PRODUCES MULTIPLE C2 CODES RELATED TO: ABSENT OR INADEQUATE EARTHING; ABSENT OR INADEQUATE BONDING (OF GAS AND WATER SERVICES); ABSENCE OF RCD PROTECTION; OVERCURRENT PROTECTION INADEQUATE FOR THE INSTALLED CABLE SIZES; DETERIORATED WIRING INSULATION.

RENOVATION TRIGGER: A FULL REWIRE IS ALMOST ALWAYS THE CORRECT DECISION WHEN A LONDON VICTORIAN TERRACE IS UNDERGOING A COMPREHENSIVE RENOVATION — BECAUSE THE REWIRE IS MOST COST-EFFECTIVE WHEN THE WALLS AND CEILINGS ARE OPEN (DURING FIRST-FIX CONSTRUCTION PHASE — BEFORE PLASTERING OR DRYLINING) — REWIRING THROUGH CLOSED WALLS AND CEILINGS (THE ALTERNATIVE — CALLED A SURFACE REWIRE OR COSMETIC REWIRE) IS SIGNIFICANTLY MORE DISRUPTIVE AND EXPENSIVE FOR THE SAME END RESULT.

Consumer Unit Specification: Hager VML910, Schneider RESI9, and RCBO Protection

THE CONSUMER UNIT (THE MODERN EQUIVALENT OF THE FUSEBOX — CONTAINING THE MAIN SWITCH, THE OVERCURRENT PROTECTIVE DEVICES — EITHER MCBS OR RCBOS — AND THE RESIDUAL CURRENT DEVICES — RCDS) IS THE CENTRAL COMPONENT OF A REWIRED ELECTRICAL INSTALLATION IN A LONDON VICTORIAN TERRACE.

18TH EDITION BS 7671 REQUIREMENT FOR NEW CONSUMER UNITS (2018 AMENDMENT TO THE IET WIRING REGULATIONS — 18TH EDITION): ALL NEW CONSUMER UNITS INSTALLED IN DOMESTIC PREMISES MUST BE HOUSED IN A NON-COMBUSTIBLE ENCLOSURE (METAL ENCLOSURE — TYPICALLY STEEL POWDER-COATED GREY). THE REQUIREMENT FOR METAL CONSUMER UNITS WAS INTRODUCED IN THE 17TH EDITION AMENDMENT 3 (2015) AND IS MANDATORY UNDER THE 18TH EDITION — PLASTIC CONSUMER UNITS ARE NO LONGER PERMITTED FOR NEW DOMESTIC INSTALLATIONS.

HAGER VML910 (HAGER UK LTD — TELFORD, SHROPSHIRE — THE MOST WIDELY SPECIFIED CONSUMER UNIT IN UK DOMESTIC REWIRE PROJECTS 2023-2025 BY NICEIC DOMESTIC INSTALLERS): THE VML910 IS A 10-WAY DUAL RCD CONSUMER UNIT (TWO RCDs — EACH PROTECTING FIVE CIRCUITS — THE DUAL-RCD SPLIT-LOAD ARRANGEMENT IS THE MINIMUM 18TH EDITION STANDARD FOR NEW DOMESTIC INSTALLATIONS — PROVIDING DISCRIMINATION BETWEEN THE TWO RCD GROUPS SO THAT A FAULT ON ONE CIRCUIT DOES NOT TRIP ALL CIRCUITS SIMULTANEOUSLY). METAL ENCLOSURE (STEEL — GREY POWDER COAT). RATING: 100A ISOLATOR / 63A RCDS (TYPE AC — 30MA). CIRCUIT BREAKERS: 10 X MCB WAYS. PRICE (SUPPLY ONLY — WITHOUT CIRCUIT BREAKERS): APPROXIMATELY £60-90 (UK ELECTRICAL WHOLESALE — JTL, REXEL, CITYELECTRICAL FACTORS). LIMITATION: DUAL RCD PROVIDES GROUP-LEVEL PROTECTION — IF A CIRCUIT IN A GROUP DEVELOPS A PERSISTENT EARTH FAULT (E.G., A FAULTY APPLIANCE LEFT PLUGGED IN), THE ENTIRE GROUP OF 5 CIRCUITS IS DISCONNECTED. THE ALTERNATIVE (RCBO PROTECTION) PROVIDES INDIVIDUAL CIRCUIT PROTECTION.

SCHNEIDER RESI9 (SCHNEIDER ELECTRIC — GRENOBLE, FRANCE — THE MOST WIDELY SPECIFIED ALL-RCBO CONSUMER UNIT IN UK DOMESTIC INSTALLATIONS): THE RESI9 RANGE USES INDIVIDUAL RCBOS (RESIDUAL CURRENT CIRCUIT BREAKER WITH OVERCURRENT PROTECTION — AN RCBO COMBINES THE FUNCTIONS OF AN MCB + RCD IN A SINGLE MODULE — PROVIDING BOTH OVERCURRENT PROTECTION AND 30MA RCD PROTECTION FOR EACH CIRCUIT INDIVIDUALLY — SO A FAULT ON ONE CIRCUIT ONLY TRIPS THAT CIRCUIT'S RCBO — OTHER CIRCUITS ARE UNAFFECTED). ADVANTAGES: SUPERIOR DISCRIMINATION (A NUISANCE TRIP ON ONE CIRCUIT DOES NOT AFFECT ANY OTHER CIRCUIT — MAXIMUM CONVENIENCE FOR THE HOUSEHOLDER). DISADVANTAGE: HIGHER COST (EACH RCBO IS MORE EXPENSIVE THAN AN MCB — APPROXIMATELY £8-15/EACH FOR AN RCBO VS £3-6/EACH FOR AN MCB). FOR A TYPICAL LONDON VICTORIAN TERRACE REWIRE (12-16 CIRCUITS): SCHNEIDER RESI9 ALL-RCBO BOARD: £200-350 SUPPLY (BOARD + ALL RCBOS). HAGER VML910 DUAL-RCD + MCBS: £100-150 SUPPLY. THE ADDITIONAL COST OF AN ALL-RCBO BOARD OVER A DUAL-RCD BOARD IS APPROXIMATELY £80-200 — TYPICALLY RECOMMENDED FOR ALL NEW REWIRES IN A LONDON VICTORIAN TERRACE WHERE THE HOUSEHOLDER IS LIKELY TO HAVE ELECTRIC VEHICLES, SOLAR PV, ELECTRIC SHOWERS, AND MULTIPLE HIGH-CURRENT CIRCUITS.

Circuit Design for a London Victorian Terrace Rewire

A FULL REWIRE FOR A STANDARD LONDON VICTORIAN TERRACE (2-3 BEDROOMS — 2 STOREYS — REAR ADDITION) TYPICALLY INVOLVES 12-18 CIRCUITS — DESIGNED TO SEPARATE ELECTRICAL LOADS BY ZONE AND FUNCTION TO MINIMISE THE IMPACT OF A CIRCUIT FAULT AND TO MEET THE SPECIFIC REQUIREMENTS OF 18TH EDITION BS 7671.

STANDARD CIRCUIT LAYOUT FOR A LONDON VICTORIAN TERRACE (TYPICAL — 12-16 CIRCUIT REWIRE): RING MAIN CIRCUITS (20A MCBS/RCBOS — 2.5MM² TWIN AND EARTH CABLE — FORMING A RING FROM THE CONSUMER UNIT AND BACK AGAIN — PROVIDING POWER SOCKETS ON THE RING): (1) GROUND FLOOR RING (ALL SOCKET OUTLETS IN THE GROUND FLOOR RECEPTION ROOMS AND HALL). (2) FIRST FLOOR RING (ALL SOCKET OUTLETS IN THE FIRST FLOOR BEDROOMS AND LANDING). (3) KITCHEN RING (RING CIRCUIT DEDICATED TO THE KITCHEN — RECOMMENDED AS A SEPARATE RING FROM THE GROUND FLOOR RING BECAUSE THE KITCHEN HAS A HIGH ELECTRICAL LOAD FROM APPLIANCES). LIGHTING CIRCUITS (6A MCBS/RCBOS — 1.5MM² TWIN AND EARTH CABLE): (4) GROUND FLOOR LIGHTING. (5) FIRST FLOOR LIGHTING. (6) LOFT/ATTIC LIGHTING. DEDICATED HIGH-LOAD CIRCUITS (FIXED APPLIANCES REQUIRING THEIR OWN CIRCUIT): (7) COOKER CIRCUIT (32A OR 40A MCBO/RCBO — 6MM² CABLE — REQUIRED FOR ANY COOKER OR RANGE ABOVE 4KW). (8) DISHWASHER (13A FUSED SPUR — OR A 20A RADIAL FROM A DEDICATED CIRCUIT). (9) WASHING MACHINE (20A RADIAL — 2.5MM² CABLE — DEDICATED TO THE WASHING MACHINE). (10) ELECTRIC SHOWER (40A RCBO — 10MM² CABLE — FOR A 10.5KW SHOWER). (11) IMMERSION HEATER (TYPICALLY A 16A RADIAL ON A TIME CLOCK — 2.5MM² CABLE). (12) ELECTRIC VEHICLE CHARGER PROVISION (32A MCBO/RCBO — 6MM² TWIN AND EARTH — PRE-INSTALLED CABLE RUN FROM CONSUMER UNIT TO THE PLANNED EV CHARGER LOCATION — EVEN IF THE CHARGER IS NOT FITTED AT THE TIME OF REWIRE — THE PRE-INSTALLATION OF THE EV CIRCUIT CABLE DURING THE REWIRE IS SIGNIFICANTLY CHEAPER THAN A SEPARATE INSTALLATION LATER). OUTDOOR SOCKET CIRCUIT (13A FUSED SPUR OR 13A RADIAL — RCD PROTECTED — FOR GARDEN SOCKETS).

Earthing, Bonding, and SPD Requirements Under 18th Edition

THE 18TH EDITION BS 7671 INTRODUCED SEVERAL IMPORTANT NEW REQUIREMENTS FOR EARTHING, BONDING, AND SURGE PROTECTION THAT MUST BE ADDRESSED IN A FULL HOUSE REWIRE FOR A LONDON VICTORIAN TERRACE.

EARTHING ARRANGEMENT IN A LONDON VICTORIAN TERRACE: THE EARTHING ARRANGEMENT FOR A DOMESTIC PROPERTY IN LONDON IS TYPICALLY TN-S (PROTECTIVE MULTIPLE EARTHING — PME — THE NEUTRAL IS COMBINED WITH THE EARTH CONDUCTOR IN THE DISTRIBUTION NETWORK — UK POWER NETWORKS IN LONDON) OR TN-C-S (PME — PROTECTIVE MULTIPLE EARTHING): THE EARTH CONDUCTOR FROM THE ELECTRICITY NETWORK COMPANY (DNO — UK POWER NETWORKS IN LONDON) IS CONNECTED TO THE MAIN EARTH TERMINAL (MET — MAIN EARTHING TERMINAL — THE POINT WHERE THE INSTALLATION'S EARTH IS CONNECTED TO THE DNO EARTH). THE MET IS LOCATED AT THE CONSUMER UNIT. THE EARTHING CONDUCTOR FROM THE METER TO THE MET IS A 16MM² OR 25MM² SINGLE CORE GREEN AND YELLOW INSULATED CONDUCTOR (TYPICALLY RUNNING FROM THE DNO METER/CUT-OUT TO THE CONSUMER UNIT MET). MAIN EQUIPOTENTIAL BONDING (ALSO KNOWN AS MAIN BONDING): BS 7671 CHAPTER 54 REQUIRES THAT THE MAIN METALLIC SERVICES ENTERING THE BUILDING (GAS PIPEWORK — AT THE GAS METER OR AT THE INCOMING GAS PIPE BEFORE IT ENTERS THE BUILDING; AND WATER SUPPLY PIPE — AT THE STOP COCK OR WITHIN 600MM OF THE POINT OF ENTRY INTO THE BUILDING) ARE BONDED TO THE MET WITH A 10MM² MAIN BONDING CONDUCTOR (GREEN AND YELLOW INSULATED). FAILURE TO PROVIDE MAIN BONDING IS A C2 CODE ON AN EICR AND IS A SERIOUS SAFETY DEFICIENCY — PARTICULARLY IN A LONDON VICTORIAN TERRACE WHERE THE GAS METER IS OFTEN IN THE UNDER-STAIRS CUPBOARD AND THE MAIN BONDING CONDUCTOR IS FREQUENTLY ABSENT IN OLDER INSTALLATIONS.

SURGE PROTECTIVE DEVICE (SPD — REQUIRED UNDER 18TH EDITION BS 7671 SECTION 443 FOR NEW INSTALLATIONS WHERE THE LOSS OF EQUIPMENT DUE TO A TRANSIENT OVERVOLTAGE WOULD CAUSE INJURY OR SEVERE DISRUPTION): THE 18TH EDITION (2018) MADE SPD INSTALLATION MANDATORY WHERE A RISK ASSESSMENT DETERMINES THAT TRANSIENT OVERVOLTAGES COULD CAUSE DANGER (SECTION 443.4 — RISK ASSESSMENT GUIDANCE). FOR A LONDON VICTORIAN TERRACE WITH A MODERN TELEVISION, COMPUTER EQUIPMENT, AND SMART HOME DEVICES: THE STANDARD INTERPRETATION IS THAT AN SPD SHOULD BE FITTED. THE SPD IS TYPICALLY A TYPE 2 SPD (100KA 8/20 WAVEFORM — THE STANDARD DOMESTIC SPD) FITTED IN THE CONSUMER UNIT (HAGER VZSPH — OR EQUIVALENT FROM SCHNEIDER OR EATON). PRICE (SPD SUPPLY): £20-40. THE ADDITIONAL COST OF FITTING AN SPD IN THE CONSUMER UNIT AT THE TIME OF A REWIRE IS VERY SMALL — IT SHOULD ALWAYS BE INCLUDED.

Part P and NICEIC Registration Requirements

ELECTRICAL INSTALLATION WORK IN A LONDON VICTORIAN TERRACE IS NOTIFIABLE UNDER PART P OF THE BUILDING REGULATIONS (ELECTRICAL SAFETY — DWELLINGS) WHENEVER THE WORK INVOLVES: A NEW CIRCUIT FROM THE CONSUMER UNIT; ANY WORK IN A SPECIAL LOCATION (KITCHEN, BATHROOM, GARDEN — ZONES DEFINED IN BS 7671 PART 6); WORK THAT IS NOT CLASSIFIED AS MINOR WORKS (MINOR WORKS INCLUDE REPLACEMENT OF LIGHT SWITCHES, SOCKET OUTLETS, AND LUMINAIRES ON AN EXISTING CIRCUIT — THESE ARE NOT NOTIFIABLE).

FOR A FULL HOUSE REWIRE: ALL WORK IS NOTIFIABLE — BECAUSE A FULL REWIRE INVOLVES NEW CIRCUITS, CONSUMER UNIT REPLACEMENT, AND WORK IN SPECIAL LOCATIONS. THE INSTALLER MUST EITHER: BE REGISTERED UNDER A PART P APPROVED COMPETENT PERSON SCHEME — NICEIC DOMESTIC INSTALLER (NICEIC — NATIONAL INSPECTION COUNCIL FOR ELECTRICAL INSTALLATION CONTRACTING — THE LARGEST PART P SCHEME IN THE UK — NICEIC DOMESTIC INSTALLERS ARE ASSESSED ANNUALLY FOR TECHNICAL COMPETENCE AND WORK QUALITY); OR BE AN ELECSA APPROVED INSTALLER; OR BE AN NAPIT REGISTERED MEMBER — AND SELF-CERTIFY THE INSTALLATION (ISSUING AN ELECTRICAL INSTALLATION CERTIFICATE — EIC — AND NOTIFYING THE CERTIFICATE TO THE LOCAL AUTHORITY THROUGH THE SCHEME). OR NOTIFY BUILDING CONTROL BEFORE STARTING WORK AND HAVE BUILDING CONTROL INSPECT THE INSTALLATION BEFORE PLASTERING AND UPON COMPLETION (THIS ROUTE IS SLOWER AND MORE EXPENSIVE AND IS NOT USED FOR STANDARD FULL HOUSE REWIRES). DOCUMENTS ISSUED ON COMPLETION: ELECTRICAL INSTALLATION CERTIFICATE (EIC — SIGNED BY THE DESIGNER, INSPECTOR, AND TESTER OF THE INSTALLATION — IN PRACTICE ALL THE SAME NICEIC REGISTERED ELECTRICIAN FOR A SMALL FIRM DOING A DOMESTIC REWIRE); AND PART P NOTIFICATION CONFIRMATION (THE NOTICE FROM THE COMPETENT PERSON SCHEME TO THE LOCAL AUTHORITY THAT THE INSTALLATION HAS BEEN COMPLETED AND CERTIFIED — RETAINED IN THE PROPERTY RECORDS).

Full House Rewire Programme and Costs

A FULL HOUSE REWIRE FOR A LONDON VICTORIAN TERRACE (2-3 BEDROOMS — 2 STOREYS — REAR ADDITION — 12-16 CIRCUITS — ALL CABLING FIRST-FIX DURING RENOVATION WHEN CEILINGS AND WALLS ARE OPEN) FOLLOWS A TWO-STAGE PROGRAMME: FIRST FIX (CABLES INSTALLED) AND SECOND FIX (CONSUMER UNIT CONNECTIONS, FITTINGS, TESTING, AND CERTIFICATION).

FIRST FIX (INSTALLED DURING RENOVATION — BEFORE PLASTERING): THE ELECTRICIANS INSTALL ALL CABLE ROUTES (CHASED INTO BRICK WALLS OR RUN THROUGH CEILING VOIDS) — FIX ALL BACK BOXES FOR SOCKETS AND SWITCHES — FIX ALL CEILING ROSE POSITIONS AND DOWNLIGHT VOID BRACKETS — INSTALL THE CONSUMER UNIT ENCLOSURE AND ALL CABLE ENTRIES. TIMING: TYPICALLY 2-4 DAYS FOR 2 ELECTRICIANS (BASED ON A STANDARD VICTORIAN TERRACE 2-3 BEDROOM — 12-16 CIRCUITS). THIS OCCURS BEFORE PLASTERING — THE PLASTERER PLASTERS OVER THE BACK BOXES AND FLUSH CABLE RUNS.

SECOND FIX (AFTER DECORATION OR NEAR-COMPLETION): THE ELECTRICIANS RETURN TO: CONNECT ALL CABLES TO THE CONSUMER UNIT. INSTALL ALL SOCKETS, SWITCHES, CEILING ROSES, AND LIGHT FITTINGS. TEST THE COMPLETE INSTALLATION (INSULATION RESISTANCE, CONTINUITY, EARTH FAULT LOOP IMPEDANCE, AND RCD TESTS — AS REQUIRED BY BS 7671 CHAPTER 61). ISSUE THE ELECTRICAL INSTALLATION CERTIFICATE (EIC). TIMING: TYPICALLY 2-3 DAYS FOR 2 ELECTRICIANS.

FULL HOUSE REWIRE COSTS IN LONDON (2025 — NICEIC DOMESTIC INSTALLER — SUPPLY AND FIT — INCLUDING LABOUR, CONSUMER UNIT, CABLE, BACK BOXES, SOCKETS, SWITCHES, AND EIC/PART P NOTIFICATION): STANDARD VICTORIAN TERRACE 2-BEDROOM (12 CIRCUITS — HAGER DUAL-RCD BOARD — STANDARD SOCKETS AND SWITCHES): £3,500-5,500 (SUPPLY AND FIT — FIRST AND SECOND FIX). STANDARD VICTORIAN TERRACE 3-BEDROOM (14-16 CIRCUITS — SCHNEIDER RESI9 ALL-RCBO BOARD — CHROME SOCKETS AND SWITCHES): £4,500-7,000. UPGRADE COSTS: SCHNEIDER RESI9 ALL-RCBO BOARD VS HAGER DUAL-RCD: ADD £80-200. EV CHARGER PROVISION CIRCUIT (PRE-INSTALLED 6MM² CABLE FROM CU TO EV CHARGER LOCATION DURING REWIRE — BEFORE PLASTERING — THE CHEAPEST TIME TO RUN THE CABLE): ADD £80-150 (JUST THE CABLE RUN — CHARGER FITTED SEPARATELY LATER). SPD (HAGER VZSPH OR EQUIVALENT TYPE 2 SPD): ADD £20-40 (SUPPLY AND FIT DURING REWIRE). NOTE: IF THE REWIRE IS DONE WITH WALLS AND CEILINGS CLOSED (SURFACE REWIRE — NOT DURING RENOVATION): ADD 30-50% TO LABOUR COST FOR THE ADDITIONAL TIME REQUIRED TO FEED CABLES THROUGH CLOSED CEILINGS AND WALLS — AND ALLOWANCE FOR MAKING GOOD (REPLASTERING CHANNELS) AFTER CABLING.

Frequently Asked Questions

How do I know if my London Victorian terrace needs a full rewire?
Key indicators that a full rewire is needed: (1) wiring age: any installation not fully rewired since approximately 1960 should be assessed — rubber-insulated (VIR) or lead-sheathed wiring from before 1960 is end-of-life and should be rewired without delay; 1960s-70s early PVC wiring may be serviceable but is often brittle — have an EICR done; (2) consumer unit type: Wylex rewireable fuse board (ceramic fuse holders with rewireable fuse wire — identifiable by the individual coloured fuseway covers), BS 3036 rewireable, or BS 1361 cartridge fuse board without RCDs — all indicate an installation requiring full replacement; (3) EICR codes: an EICR with multiple C1 (danger present) or C2 (potentially dangerous) codes for absent earthing, absent bonding, absent RCD protection, or deteriorated wiring insulation indicates rewiring is required; (4) renovation trigger: if the Victorian terrace is being comprehensively renovated with walls and ceilings open, a full rewire is the correct decision regardless of the apparent age of the wiring — the cost of a rewire during open renovation is significantly less than a surface rewire later.
Should I specify dual-RCD or RCBO protection for my Victorian terrace rewire?
RCBO (individual circuit protection — one RCBO per circuit) is the recommended specification for a full house rewire in a London Victorian terrace. Dual-RCD (two RCDs each protecting a group of 5 circuits — the minimum 18th Edition standard): a fault on one circuit trips all 5 circuits in the group — nuisance tripping can affect 4 working circuits in addition to the faulty one. RCBO (Schneider RESI9 or equivalent all-RCBO board): each circuit has its own RCBO (combined MCB + 30mA RCD in one module) — a fault on one circuit trips only that circuit's RCBO — all other circuits unaffected. The additional cost of an all-RCBO board vs dual-RCD is approximately £80-200 for a typical 14-16 circuit Victorian terrace rewire — well worth the additional cost for the improved discrimination and convenience. Recommended specification: Schneider RESI9 18-way all-RCBO consumer unit (or equivalent from Hager or Eaton) for all full house rewires in London Victorian terraces.
Do I need main bonding for my Victorian terrace rewire?
Yes — main equipotential bonding is a mandatory requirement under BS 7671 Chapter 54 and is a C2 code on an EICR if absent. Main bonding connects the main incoming metallic services to the Main Earthing Terminal (MET) at the consumer unit: gas service (10mm² main bonding conductor from gas meter or incoming gas pipe within 600mm of entry to building to the MET); and water supply (10mm² main bonding conductor from stop cock or incoming water pipe within 600mm of entry to building to the MET). In London Victorian terraces, main bonding is frequently absent in older installations — particularly the water service (the incoming water supply in many older Victorian terraces has been upgraded to plastic pipe (mdpe blue) which does not conduct electricity, potentially leaving a section of metal pipe unbonded). A full rewire must include installation of correct main bonding to both gas and water services.
What is Part P and do I need it for a house rewire?
Part P of the Building Regulations (Electrical Safety — Dwellings) requires that all notifiable electrical installation work in domestic premises is either (a) carried out by a registered competent person who self-certifies the installation, or (b) notified to Building Control before starting and inspected and certified by Building Control on completion. A full house rewire is fully notifiable under Part P — it involves new circuits, consumer unit replacement, and work in special locations (kitchen, bathroom). The practical requirement: use a NICEIC Domestic Installer, ELECSA Approved Installer, or NAPIT Member — all are Part P registered competent person schemes. On completion, they issue an Electrical Installation Certificate (EIC) and notify the local authority through the scheme. The EIC is critical for conveyancing (solicitors check for it when you sell the property). Always ask your electrician for their NICEIC (or scheme) registration number and verify on the scheme website before engaging.
How much does a full house rewire cost in London?
Full house rewire costs in London (2025, NICEIC Domestic Installer, supply and fit, first and second fix, including labour, consumer unit, cable, back boxes, sockets, switches, EIC and Part P notification): 2-bedroom Victorian terrace (12 circuits, Hager dual-RCD board, standard sockets and switches): £3,500-5,500; 3-bedroom Victorian terrace (14-16 circuits, Schneider RESI9 all-RCBO board, chrome sockets and switches): £4,500-7,000. Key additional costs: RCBO upgrade vs dual-RCD: add £80-200; EV charger provision circuit (6mm² cable pre-run during rewire — cheapest time to install): add £80-150; SPD (surge protective device, Type 2, e.g., Hager VZSPH): add £20-40; surface rewire premium (if not during open renovation): add 30-50% to labour. Note: these costs assume the rewire is done during a renovation when walls and ceilings are open — a surface rewire (through closed walls) adds significantly to cost and disruption.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.