Structural Knockthrough & Open Plan Living: London Homeowner Guide

CREATING OPEN PLAN LIVING SPACE BY REMOVING LOAD-BEARING WALLS IS ONE OF THE MOST TRANSFORMATIVE AND POPULAR HOME IMPROVEMENTS IN LONDON. THE TYPICAL VICTORIAN AND EDWARDIAN TERRACED HOUSE — TWO RECEPTION ROOMS AT THE FRONT, A NARROW REAR ADDITION, SEPARATE KITCHEN AND DINING ROOM — WAS DESIGNED FOR AN ERA OF FORMAL ENTERTAINING AND DOMESTIC SERVICE. MODERN LONDON HOUSEHOLDS WANT ONE LARGE, LIGHT-FILLED KITCHEN-DINER-LIVING SPACE, AND THE STRUCTURAL KNOCKTHROUGH IS THE KEY INTERVENTION THAT MAKES IT POSSIBLE. BUT REMOVING A LOAD-BEARING WALL IN A LONDON TERRACE IS NOT A DIY PROJECT. STRUCTURAL ENGINEERING, BUILDING REGULATIONS APPROVAL, PARTY WALL CONSIDERATIONS, AND CORRECT TEMPORARY SUPPORT ALL MATTER ENORMOUSLY. THIS GUIDE COVERS EVERY TECHNICAL AND COMMERCIAL ASPECT OF STRUCTURAL WALL REMOVAL IN A LONDON HOME.

Key Takeaways

  • ALL SOLID BRICK WALLS IN VICTORIAN LONDON HOUSES SHOULD BE TREATED AS POTENTIALLY LOAD-BEARING UNTIL CONFIRMED OTHERWISE BY A STRUCTURAL ENGINEER
  • STRUCTURAL ENGINEER CALCULATIONS AND BUILDING REGULATIONS APPROVAL ARE MANDATORY FOR LOAD-BEARING WALL REMOVAL — NO EXCEPTIONS
  • TYPICAL BEAM SIZES: UC 152X152X23 FOR SMALL OPENINGS, UB 254X146X31 FOR 3-3.5M SPANS, UB 305X165X40 FOR WIDE BIFOLD OPENINGS
  • CHIMNEY BREAST REMOVAL IS THE MOST COMMON STRUCTURAL INTERVENTION — THE CHIMNEY ABOVE MUST ALWAYS BE ADEQUATELY SUPPORTED (GALLOWS BRACKET OR FULL REMOVAL)
  • PARTY WALL NOTICE IS REQUIRED IF THE STRUCTURAL WORKS INVOLVE CUTTING INTO OR FIXING TO A PARTY WALL
  • TOTAL COST FOR A STANDARD LONDON KNOCKTHROUGH: £5,000-£12,000 INCLUDING ALL PROFESSIONAL FEES, STEEL, AND MAKING GOOD
  • INTUMESCENT PAINT (JOTUN JOTACHAR 1709) IS REQUIRED FOR EXPOSED STRUCTURAL STEEL FOR FIRE RESISTANCE UNDER PART B

Identifying Load-Bearing Walls: What to Look For

IN A LONDON TERRACED OR SEMI-DETACHED HOUSE, THE FOLLOWING WALLS ARE TYPICALLY LOAD-BEARING AND MUST NOT BE REMOVED WITHOUT STRUCTURAL ENGINEER INPUT AND APPROPRIATE TEMPORARY SUPPORT AND PERMANENT BEAM INSTALLATION:

GABLE WALLS: THE TWO END WALLS OF A TERRACED HOUSE (EFFECTIVELY THE PARTY WALLS) ARE STRUCTURAL — THEY CARRY THE ROOF STRUCTURE AT THE GABLE ENDS. IN MOST LONDON TERRACES, THE PARTY WALLS ARE ALSO PARTY WALLS WITHIN THE MEANING OF THE PARTY WALL ETC. ACT 1996 — ANY STRUCTURAL OPENING IN THEM REQUIRES A PARTY WALL NOTICE.

SPINE WALLS (CENTRAL LONGITUDINAL WALLS): IN MANY VICTORIAN TERRACES, AN INTERNAL WALL RUNS THE LENGTH OF THE HOUSE PARALLEL TO THE PARTY WALLS, TYPICALLY DIVIDING THE FRONT AND REAR RECEPTION ROOMS FROM THE HALLWAY. THIS SPINE WALL IS OFTEN LOAD-BEARING, SUPPORTING FLOOR JOISTS THAT BEAR ONTO IT FROM BOTH SIDES.

CROSS WALLS: WALLS RUNNING ACROSS THE WIDTH OF THE HOUSE (PERPENDICULAR TO THE PARTY WALLS) ARE COMMONLY LOAD-BEARING, PARTICULARLY WHEN THEY SUPPORT FLOORS ABOVE.

HOW TO IDENTIFY LOAD-BEARING WALLS IN PRACTICE: — CHECK WHAT'S ABOVE: IF THERE IS A ROOM OR FLOOR ABOVE THE WALL, IT IS ALMOST CERTAINLY BEARING SOME LOAD. IF THE WALL RUNS PERPENDICULAR TO THE FLOOR JOISTS (WHICH TYPICALLY RUN FRONT-TO-BACK IN LONDON TERRACES), IT IS LIKELY BEARING THE JOIST ENDS. — CHECK WHAT'S BELOW: IF THE WALL IS ABOVE A BEAM, COLUMN, OR WALL ON THE FLOOR BELOW (OR DIRECTLY OVER THE FOUNDATIONS), THE STRUCTURAL LOAD PATH IS LIKELY RUNNING THROUGH IT. — RULE OF THUMB: ALL SOLID BRICK WALLS IN VICTORIAN AND EDWARDIAN LONDON HOUSES SHOULD BE TREATED AS POTENTIALLY LOAD-BEARING UNTIL A STRUCTURAL ENGINEER HAS CONFIRMED OTHERWISE. PLASTERBOARD STUD WALLS (WITH HOLLOW SOUND WHEN TAPPED) ARE TYPICALLY NON-LOAD-BEARING, BUT NOT ALWAYS. — LOFT: IF THE WALL RUNS UP TO THE RIDGE BEAM OR SUPPORTS THE UNDERSIDE OF THE ROOF STRUCTURE, IT IS STRUCTURAL.

IMPORTANT: NEVER ASSUME A WALL IS NON-LOAD-BEARING WITHOUT PROFESSIONAL CONFIRMATION. REMOVING A LOAD-BEARING WALL WITHOUT TEMPORARY SUPPORT CAN CAUSE IMMEDIATE PARTIAL OR TOTAL STRUCTURAL COLLAPSE.

Structural Engineer: What You Need and Why

A STRUCTURAL ENGINEER MUST BE ENGAGED BEFORE ANY STRUCTURAL WALL REMOVAL IN A LONDON HOME. THEIR SCOPE OF WORK WILL TYPICALLY INCLUDE:

1. STRUCTURAL SURVEY: ASSESSMENT OF THE EXISTING STRUCTURE, IDENTIFYING WHICH WALLS ARE LOAD-BEARING AND WHAT LOADS THEY CARRY (DEAD LOADS FROM THE BUILDING'S OWN WEIGHT, AND IMPOSED LOADS FROM OCCUPANCY AND FURNITURE ABOVE).

2. BEAM CALCULATION (STRUCTURAL DESIGN CALCULATION PACK): THE ENGINEER CALCULATES THE REQUIRED SIZE AND SPECIFICATION OF THE PERMANENT STRUCTURAL BEAM TO SPAN THE NEW OPENING. CALCULATIONS FOLLOW BS EN 1993-1-1 (EUROCODE 3) FOR STEEL BEAMS, AND WILL TYPICALLY SPECIFY: — BEAM SECTION SIZE (E.G. UC 203X203X46, UB 254X146X31) — STEEL GRADE (S275 OR S355) — PADSTONE BEARING REQUIREMENTS AT EACH END (ENGINEERING BRICK PADSTONES OR REINFORCED CONCRETE PADSTONES TO SPREAD THE LOAD INTO THE SUPPORTING WALL OR FOUNDATION) — DEFLECTION LIMITS (L/360 FOR FLOORS, L/200 FOR ROOF BEAMS)

3. TEMPORARY WORKS DESIGN: FOR COMPLEX KNOCKTHROUGHS OR WHERE THE WALL BEING REMOVED IS CRITICAL TO THE STRUCTURE (E.G. SPINE WALL SUPPORTING MULTIPLE FLOORS), THE ENGINEER MAY SPECIFY A TEMPORARY WORKS DESIGN, INDICATING HOW ACROW PROPS, STRONGBOYS (WALL PROPS), AND SPREADER BOARDS ARE TO BE POSITIONED DURING THE WORK.

4. BUILDING CONTROL SUBMISSION: THE ENGINEER'S CALCULATIONS ARE SUBMITTED TO BUILDING CONTROL WITH YOUR APPLICATION. BUILDING CONTROL CHECKS THE CALCULATIONS AND INSPECTS THE STEEL INSTALLATION BEFORE COVERING UP.

COST OF STRUCTURAL ENGINEER FOR A KNOCKTHROUGH: £400-£800 FOR A SINGLE OPENING IN A STANDARD 2-STOREY LONDON TERRACE. MORE COMPLEX PROJECTS (MULTIPLE OPENINGS, STRUCTURAL REDESIGN, TEMPORARY WORKS DESIGN) COST £800-£2,500+. ALWAYS ENGAGE AN INSTITUTION OF STRUCTURAL ENGINEERS (ISTRUCTE) OR INSTITUTION OF CIVIL ENGINEERS (ICE) CHARTERED MEMBER.

Steel Beam Sizes for Common London Knockthroughs

THE FOLLOWING BEAM SIZES ARE TYPICAL FOR COMMON KNOCKTHROUGH SCENARIOS IN LONDON VICTORIAN TERRACED HOUSES (ALL SUBJECT TO SPECIFIC STRUCTURAL ENGINEER CALCULATION — THESE ARE INDICATIVE ONLY):

SINGLE DOOR TO DOUBLE DOOR WIDTH (900MM-1800MM OPENING), SUPPORTING 1 FLOOR ABOVE: UC 152X152X23 OR UC 152X152X30 — COMPACT UNIVERSAL COLUMN OFTEN USED WHERE DEPTH IS CONSTRAINED BY CEILING HEIGHT. PADSTONE 215X215X100MM ENGINEERING BRICK EACH END.

FULL ROOM-WIDTH OPENING (3.0-3.5M), SUPPORTING 1 FLOOR ABOVE: UB 254X146X31 OR UC 203X203X46 — COMMON FOR FRONT-TO-BACK KNOCKTHROUGH IN A VICTORIAN TERRACE. PADSTONES 440X215X100MM ENGINEERING BRICK EACH END OR RC PADSTONE.

FULL ROOM-WIDTH OPENING (4.0-5.0M) WITH BIFOLDS, SUPPORTING 1 FLOOR + ROOF: UB 305X127X37 OR UB 305X165X40 — TYPICALLY SPECIFIED FOR WIDE BIFOLD DOOR OPENINGS AT THE BACK OF A LONDON TERRACE WHERE THE STEEL ALSO CARRIES ROOF LOAD. CONCRETE PADSTONES 440X440X150MM EACH END.

LARGE OPENING (5.0-7.0M), SUPPORTING MULTIPLE FLOORS + ROOF (DOUBLE SPINE WALL REMOVAL): UB 406X178X54 TO UB 457X152X60 — SUBSTANTIAL BEAMS FOR COMPLEX OPEN-PLAN CONFIGURATIONS. MAY REQUIRE BOXED STEEL (TWO PARALLEL BEAMS ON EACH WALL FACE) AND PADSTONE ON NEW INTERMEDIATE COLUMN OR SUBSTANTIAL PIER.

BOXING STEELS: STRUCTURAL STEEL BEAMS IN RESIDENTIAL INTERIORS ARE ALMOST ALWAYS BOXED IN — PLASTERBOARD ON METAL STUD OR TIMBER FRAMEWORK, PLASTERED FLUSH WITH THE ADJACENT CEILING. THIS ADDS 50-100MM TO THE APPARENT BEAM DEPTH IN THE FINISHED CEILING. WHERE THE BEAM PROTRUDES BELOW CEILING LEVEL, A DOWNSTAND IS CREATED AND MUST BE ALLOWED FOR IN THE INTERIOR DESIGN.

FIRE PROTECTION: FOR EXPOSED STEELS (OPEN-PLAN SPACES WHERE THE BEAM IS LEFT VISIBLE), INTUMESCENT PAINT (JOTUN JOTACHAR 1709, STEELMASTER 60/120) IS REQUIRED TO PROVIDE 30 OR 60-MINUTE FIRE RESISTANCE UNDER PART B OF THE BUILDING REGULATIONS.

Chimney Breast Removal: The Most Common London Knockthrough

CHIMNEY BREAST REMOVAL IS THE SINGLE MOST COMMON STRUCTURAL INTERVENTION IN LONDON VICTORIAN TERRACES. MOST TERRACES HAVE A CHIMNEY STACK SHARED BETWEEN ADJACENT PROPERTIES, WITH CHIMNEY BREASTS PROJECTING INTO BOTH THE FRONT AND REAR RECEPTION ROOMS ON EACH FLOOR. REMOVING A GROUND-FLOOR CHIMNEY BREAST TO OPEN UP SPACE IS EXTREMELY POPULAR — BUT IT CREATES A CRITICAL STRUCTURAL RISK THAT IS FREQUENTLY UNDERESTIMATED.

THE PROBLEM: THE CHIMNEY BREAST ON THE GROUND FLOOR IS CARRYING THE WEIGHT OF THE CHIMNEY BREAST ON ALL FLOORS ABOVE AND THE CHIMNEY STACK ON THE ROOF. IF THE GROUND FLOOR CHIMNEY BREAST IS REMOVED WITHOUT ADEQUATE SUPPORT FOR THE STRUCTURE ABOVE, THE FLOOR ABOVE CAN CRACK, SETTLE, OR IN EXTREME CASES COLLAPSE.

THE SOLUTION: A STRUCTURAL ENGINEER MUST DESIGN THE SUPPORT SYSTEM. THERE ARE TWO COMMON APPROACHES:

1. STEEL GALLOWS BRACKET: A STEEL BRACKET BOLTED THROUGH THE PARTY WALL OR REAR WALL TO CANTILEVER AND SUPPORT THE CHIMNEY BREAST ABOVE FROM THE SIDES. THE GALLOWS BRACKET IS TYPICALLY 100X100X10MM ANGLE STEEL OR FABRICATED STEEL PLATE PROFILE. NOTE: IF THE GALLOWS BRACKET IS BOLTED THROUGH A PARTY WALL, A PARTY WALL SECTION 2 NOTICE MUST BE SERVED.

2. REMOVAL OF THE ENTIRE CHIMNEY BREAST AND STACK: COMPLETE REMOVAL OF THE CHIMNEY BREAST ON ALL FLOORS AND THE STACK ABOVE ROOF LEVEL. THIS REQUIRES PLANNING PERMISSION IN CONSERVATION AREAS IF IT CHANGES THE EXTERNAL APPEARANCE. PLANNING PERMISSION MAY BE REQUIRED FOR THE ROOF REPAIRS AND CHANGED ROOFLINE WHERE THE STACK WAS. STRUCTURAL ENGINEER MUST DESIGN THE SUPPORT FOR THE SURROUNDING ROOF STRUCTURE.

COST OF CHIMNEY BREAST REMOVAL (GROUND FLOOR ONLY, GALLOWS BRACKET SUPPORT): £2,000-£5,000 INCLUDING STRUCTURAL ENGINEER, BUILDING CONTROL, TEMPORARY WORKS, STEELWORK, AND MAKING GOOD.

COST OF COMPLETE CHIMNEY BREAST AND STACK REMOVAL: £4,000-£12,000 DEPENDING ON STACK HEIGHT, NUMBER OF FLUES, AND EXTENT OF REINSTATEMENT.

Practical Process and Costs

TYPICAL PROCESS FOR A STANDARD LONDON KNOCKTHROUGH (ONE INTERNAL LOAD-BEARING WALL, 3.0-4.5M SPAN):

WEEK 1-2: STRUCTURAL ENGINEER SURVEY AND DESIGN CALCULATIONS — £400-£800 WEEK 2-3: BUILDING CONTROL APPLICATION SUBMITTED WITH STRUCTURAL CALCULATIONS — BUILDING CONTROL FEE £250-£400 WEEK 3-5: PARTY WALL NOTICES SERVED IF WALL IS SHARED OR ADJACENT TO PARTY WALL (ADD 2-4 WEEKS FOR RESPONSE PERIOD) WEEK 5-6: MAIN WORKS: — TEMPORARY WORKS: ACROW PROPS AND SPREADER BOARDS SET UP (1 DAY) — WALL REMOVAL: BRICKWORK CAREFULLY REMOVED IN COURSES, WORKING FROM TOP DOWN (1-2 DAYS) — PADSTONE INSTALLATION: ENGINEERING BRICK PADSTONES LAID ON EACH BEARING POINT (HALF DAY) — STEEL INSTALLATION: BEAM LIFTED INTO POSITION (SMALL STEELS MANUALLY; LARGER STEELS MAY REQUIRE SCAFFOLD AND LIFTING EQUIPMENT) (1 DAY) — MAKING GOOD: DEBRIS REMOVAL, FLOOR PATCHING, TEMPORARY WORKS REMOVED (1 DAY) WEEK 6-7: BUILDING CONTROL INSPECTION OF EXPOSED STEEL AND PADSTONES WEEK 7-9: FINISHING WORKS — PLASTERING, CEILING REPAIR, BOXING IN BEAM, DECORATION

TOTAL COST (STANDARD 3.5M KNOCKTHROUGH, ALL-IN): £5,000-£12,000 DEPENDING ON FINISHES, BEAM SIZE, AND DECORATING SCOPE.

COST BREAKDOWN: STRUCTURAL ENGINEER: £500-£800 BUILDING CONTROL: £300-£450 TEMPORARY WORKS: £200-£500 STEEL BEAM SUPPLY (UB 254X146X31, 4.5M LENGTH): £400-£700 STEEL INSTALLATION LABOUR: £400-£800 BRICKWORK REMOVAL AND MAKING GOOD: £800-£1,500 CEILING REPAIR AND BEAM BOXING: £500-£1,000 PLASTERING AND DECORATION: £600-£1,200

Frequently Asked Questions

Can I remove a wall myself in my London terrace?
ONLY NON-LOAD-BEARING WALLS (TYPICALLY STUD PARTITION WALLS) CAN BE REMOVED AS DIY. LOAD-BEARING WALL REMOVAL IS A NOTIFIABLE STRUCTURAL ALTERATION REQUIRING BUILDING REGULATIONS APPROVAL, STRUCTURAL ENGINEER CALCULATIONS, AND PROPER TEMPORARY SUPPORT. DOING IT WITHOUT PROFESSIONAL INVOLVEMENT CREATES SERIOUS STRUCTURAL RISK AND LEAVES YOUR HOME UNCERTIFIED, WHICH WILL CAUSE MAJOR PROBLEMS WHEN SELLING OR REMORTGAGING.
How long does a structural knockthrough take?
PLANNING, STRUCTURAL ENGINEERING, AND BUILDING CONTROL TYPICALLY TAKE 4-8 WEEKS. THE ACTUAL STRUCTURAL WORK (TEMPORARY SUPPORT, WALL REMOVAL, BEAM INSTALLATION) TAKES 3-5 DAYS FOR A STANDARD OPENING. FINISHING (PLASTERING, CEILING REPAIR, DECORATION) ADDS 2-4 WEEKS DEPENDING ON SCOPE.
Do I need planning permission to knock through a wall?
INTERNAL STRUCTURAL WORKS GENERALLY DO NOT REQUIRE PLANNING PERMISSION — ONLY BUILDING REGULATIONS APPROVAL. HOWEVER, IF THE WORKS AFFECT AN EXTERNAL WALL, A LISTED BUILDING (LISTED BUILDING CONSENT REQUIRED), OR A CHIMNEY STACK VISIBLE FROM THE STREET IN A CONSERVATION AREA (PLANNING PERMISSION MAY BE REQUIRED FOR EXTERNAL ALTERATIONS), PLANNING INVOLVEMENT IS NEEDED.
How much does it cost to knock through two rooms in a London terrace?
FOR A STANDARD SINGLE LOAD-BEARING WALL REMOVAL WITH STEEL BEAM INSTALLATION IN A LONDON VICTORIAN TERRACE, EXPECT A TOTAL COST OF £5,000-£12,000. THIS INCLUDES STRUCTURAL ENGINEER, BUILDING CONTROL, TEMPORARY WORKS, STEEL SUPPLY AND INSTALLATION, MAKING GOOD, AND PLASTERING. CHIMNEY BREAST REMOVAL ADDS £2,000-£5,000 IF DONE SIMULTANEOUSLY.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.