Floor screeds are the levelled cementitious or calcium sulphate layer poured over the structural floor to provide a smooth, accurate surface for the finished floor covering. In London Victorian terraces, screeds are used in ground floor renovation (over new insulation and damp-proof membrane), in rear extensions, and increasingly as the encapsulation layer for underfloor heating systems. The choice of screed type affects workability, drying time, suitability for underfloor heating, and the finished floor level. This guide covers the main screed types and their applications.

Key Takeaways

  • Sand-cement screed (semi-dry mix) is the most widely used screed in London Victorian terrace renovations — placed between rails, compacted, and trowelled flat
  • Anhydrite (calcium sulphate) flowing screed is preferred for underfloor heating — self-levels, flows around pipes without voids, thinner cover needed above pipes
  • Anhydrite screed must not be used in wet areas and must have the laitance ground off before tiling
  • Sand-cement screed drying: 1mm/day (first 40mm); 1mm/2 days above 40mm — a 75mm screed takes approximately 85 days to dry to <75% RH
  • Use a calibrated hygrometer probe to confirm screed moisture — never guess; tiling onto wet screed causes debonding and tile failure
  • Screed costs: sand-cement 50mm £15-30/m²; anhydrite 60mm over UFH £25-45/m²

Sand-Cement Screed vs Flowing Screed

THERE ARE TWO MAIN SCREED TYPES USED IN LONDON VICTORIAN TERRACE RENOVATIONS:

SAND-CEMENT SCREED (TRADITIONAL — THE MOST WIDELY USED): A MIX OF CEMENT (OPC — ORDINARY PORTLAND CEMENT) AND SHARP SAND, MIXED ON SITE OR SUPPLIED AS A SEMI-DRY PREMIX BAG PRODUCT: - MIX RATIO: TYPICALLY 1:3 TO 1:4.5 (CEMENT:SAND BY VOLUME) FOR A STANDARD BONDED OR UNBONDED SCREED. WATER:CEMENT RATIO (W/C): 0.4-0.55 (THE LOWER THE WATER CONTENT, THE STRONGER THE SCREED — BUT TOO DRY AND THE MIX IS UNWORKABLE). - CONSISTENCE: SEMI-DRY (DAMP BUT NOT SLUSHY — WHEN SQUEEZED INTO A BALL IN THE HAND, IT HOLDS ITS SHAPE AND DOES NOT WEEP WATER). THIS SEMI-DRY CONSISTENCY IS WHAT MAKES SAND-CEMENT SCREED SUITABLE FOR TROWELLING TO A FLAT SURFACE. - PLACEMENT: PLACED BETWEEN SCREED RAILS (TIMBER BATTENS OR STEEL SCREED PINS SET TO FINISHED LEVEL); COMPACTED WITH A TAMPING BEAM; FLOATED SMOOTH WITH A BULL FLOAT AND TROWELLED FLAT WITH A FINISHING TROWEL. A MEDIUM MACHINE FLOAT (DINGO OR SIMILAR) IS USED ON LARGE AREAS. - THICKNESS: UNBONDED SCREED (ON A POLYTHENE SEPARATOR MEMBRANE): MINIMUM 50MM. BONDED SCREED (BONDED DIRECTLY TO THE CONCRETE SLAB WITH PVA ADHESIVE OR CEMENT SLURRY): MINIMUM 25MM (BUT PRONE TO CURLING IF TOO THIN). FLOATING SCREED (OVER INSULATION OR UNDERFLOOR HEATING PIPES): MINIMUM 75MM (50MM ABOVE THE HEATING PIPES — THICKER FOR LOWER SCREED THERMAL RESISTANCE). - DRYING TIME: SAND-CEMENT SCREED DRIES SLOWLY — THE RULE OF THUMB IS 1MM PER DAY FOR THE FIRST 40MM AND 1MM PER 2 DAYS ABOVE 40MM. A 75MM SCREED TAKES APPROXIMATELY 85 DAYS TO DRY TO A RELATIVE HUMIDITY ≤ 75% (THE MOISTURE LEVEL REQUIRED BEFORE LAYING MOST FLOOR COVERINGS — WOOD, LVT, CARPET). IN LONDON IN WINTER, DRYING CAN BE EXTENDED FURTHER. - ADDITIVES: POLYPROPYLENE FIBRES (FIBROCRETE PP FIBRES — ADD AT 1KG PER M³): REDUCE PLASTIC SHRINKAGE CRACKING IN THE EARLY CURING PERIOD. NOT A SUBSTITUTE FOR STEEL REINFORCEMENT IN STRUCTURAL SCREEDS.

FLOWING (PUMPABLE) ANHYDRITE OR CALCIUM SULPHATE SCREED: FLOWING SCREEDS ARE LIQUID-APPLIED SCREED MIXES THAT ARE PUMPED ONTO THE FLOOR AND SELF-LEVEL — THEY DO NOT REQUIRE TROWELLING: - ANHYDRITE SCREED: CALCIUM SULPHATE-BASED (ANHYDRITE BINDER — CaSO4 — NOT PORTLAND CEMENT). BRANDS: HANSON CEMFLOOR ULTRA, LAFARGE GYVLON, KNAUF FLOOR. AVAILABLE AS LIQUID READYMIX (DELIVERED BY PUMP TRUCK) OR SITE-MIXED POWDER. - ADVANTAGES: VERY FLAT SURFACE (SELF-LEVELLING); FASTER PLACEMENT (A PUMP TRUCK CAN PLACE 200-300M² PER DAY — VERSUS 30-50M² FOR HAND-PLACED SAND-CEMENT); BETTER FOR UNDERFLOOR HEATING ENCAPSULATION (FLOWS AROUND PIPES; PROVIDES EXCELLENT CONTACT FOR HEAT TRANSFER); THINNER POSSIBLE OVER UFH PIPES (50MM MINIMUM ABOVE PIPES, NOT 75MM) - DISADVANTAGES: MORE EXPENSIVE THAN SAND-CEMENT PER M³; MUST BE COVERED UNTIL SET (DRAUGHT-FREE — ANHYDRITE SCREED IS SENSITIVE TO RAPID SURFACE DRYING IN THE FIRST 24-48 HOURS); ANHYDRITE SCREED MUST NOT BE USED IN WET AREAS (IT REVERTS TO GYPSUM IF PERMANENTLY WET — NOT SUITABLE FOR SHOWER FLOORS OR PERMANENTLY WET ENVIRONMENTS); MUST BE LAITANCE-REMOVED BEFORE TILING (GRIND OR SAND THE SURFACE TO REMOVE THE THIN WEAK LAITANCE LAYER BEFORE TILING — TILING DIRECTLY ON LAITANCE LEADS TO TILE DEBONDING) - POLYMER-MODIFIED CEMENT SCREED (MAPEI ULTRATOP, ARDEX K15 SLC): A HYBRID OPTION — CEMENT-BASED BUT WITH POLYMER ADDITIVES FOR SELF-LEVELLING PROPERTIES. FASTER DRYING THAN TRADITIONAL SAND-CEMENT; MORE COMPATIBLE WITH WET AREAS THAN ANHYDRITE; MORE EXPENSIVE THAN STANDARD SAND-CEMENT.

UNDERFLOOR HEATING SCREED: WHERE WATER UNDERFLOOR HEATING (HYDRONIC UFH) PIPES ARE EMBEDDED IN THE SCREED: - ANHYDRITE SCREED IS PREFERRED: IT FLOWS AROUND THE PIPES (ELIMINATES AIR VOIDS); PROVIDES BETTER THERMAL CONDUCTIVITY CONTACT THAN SAND-CEMENT (WHICH MAY LEAVE VOIDS UNDER THE PIPES) - HEATING PROTOCOL: THE UFH SYSTEM MUST NOT BE HEATED FOR AT LEAST 28 DAYS AFTER SCREED PLACEMENT (ALLOW SCREED TO CURE). THEN GRADUALLY RAISE TEMPERATURE (25°C FOR 3 DAYS; +5°C PER DAY UP TO MAX OPERATING TEMPERATURE — APPROX 45°C FLOW TEMPERATURE) BEFORE NORMAL OPERATION - FLOOR COVERING: CHECK THE FLOOR COVERING MANUFACTURER\'S REQUIREMENTS FOR SCREED MOISTURE CONTENT (MOST TIMBER FLOOR PRODUCTS REQUIRE ≤ 65% RH IN THE SCREED — MAY REQUIRE DEHUMIDIFICATION TO ACHIEVE)

Thickness, Drying, and Costs

SCREED THICKNESS GUIDE: - BONDED SCREED (ON CONCRETE): 25-40MM (MINIMUM) - UNBONDED SCREED (ON POLYTHENE OVER CONCRETE): 50MM MINIMUM - FLOATING SCREED (OVER INSULATION OR UFH — NO UFH PIPES): 50-65MM - FLOATING SCREED OVER UFH PIPES (SAND-CEMENT): 65-75MM TOTAL (50MM ABOVE PIPES) - FLOATING SCREED OVER UFH PIPES (ANHYDRITE): 60-70MM TOTAL (45-50MM ABOVE PIPES)

DRYING TIMES AND MOISTURE TESTING: - SAND-CEMENT SCREED: 1MM/DAY (FIRST 40MM) + 1MM/2 DAYS (ABOVE 40MM). ACCELERATED DRYING WITH DEHUMIDIFIERS AND UNDERFLOOR HEATING (RAISE GRADUALLY — SEE ABOVE): CAN HALVE DRYING TIMES. - ANHYDRITE SCREED: GENERALLY DRIES FASTER THAN SAND-CEMENT OF THE SAME THICKNESS — TYPICALLY 50MM ANHYDRITE SCREED IS READY FOR FLOOR COVERINGS IN 28-42 DAYS IN NORMAL CONDITIONS. - MOISTURE TESTING: USE A CALIBRATED HYGROMETER PROBE (TRAMEX MOIST MASTER, RS 220G RELATIVE HUMIDITY PROBE — INSERT 40% DEPTH OF SCREED) — TARGET < 75% RH FOR MOST FLOOR COVERINGS; < 65% RH FOR MOST TIMBER FLOORS.

COSTS (SUPPLY AND FIT, LONDON 2025-2026): SAND-CEMENT SCREED (50MM UNBONDED — PER M² SUPPLY AND LAY): £15-30 SAND-CEMENT SCREED (75MM FLOATING OVER UFH — PER M² SUPPLY AND LAY): £20-35 ANHYDRITE FLOWING SCREED (CEMFLOOR ULTRA — 60MM OVER UFH, PER M²): £25-45 POLYMER-MODIFIED LEVELLING COMPOUND (ARDEX K15 — 10-25MM CORRECTION LAYER, PER M²): £15-30 SCREED MOISTURE TEST (HYGROMETER PROBE — PER READING): £30-80 (PROFESSIONAL TESTING COMPANY)

Frequently Asked Questions

What type of screed is best for underfloor heating in a London Victorian terrace?
ANHYDRITE (CALCIUM SULPHATE) FLOWING SCREED (HANSON CEMFLOOR ULTRA, LAFARGE GYVLON) IS GENERALLY PREFERRED FOR UNDERFLOOR HEATING — IT FLOWS AROUND THE PIPES WITHOUT AIR VOIDS, PROVIDES BETTER THERMAL CONTACT, AND IS SELF-LEVELLING (NO TROWELLING). MINIMUM COVER ABOVE PIPES: 45-50MM (LESS THAN SAND-CEMENT\'S 50MM MINIMUM). NOTE: ANHYDRITE SCREED MUST NOT BE USED IN WET AREAS AND MUST HAVE THE LAITANCE REMOVED (GROUND OR SANDED) BEFORE TILING.
How long does floor screed take to dry in a London Victorian terrace?
SAND-CEMENT SCREED: 1MM PER DAY FOR THE FIRST 40MM, THEN 1MM PER 2 DAYS ABOVE 40MM. A 75MM SCREED TAKES APPROXIMATELY 85 DAYS TO REACH < 75% RELATIVE HUMIDITY IN NORMAL CONDITIONS (LONGER IN WINTER). ANHYDRITE SCREED: 50-60MM TYPICALLY READY IN 28-42 DAYS. DEHUMIDIFIERS AND UNDERFLOOR HEATING (RAISED TEMPERATURE AFTER 28 DAYS CURE) ACCELERATE DRYING. USE A CALIBRATED HYGROMETER PROBE TO CONFIRM DRYNESS — DO NOT GUESS.
What is the minimum screed thickness over insulation in a Victorian terrace?
FOR A TRADITIONAL SAND-CEMENT FLOATING SCREED OVER INSULATION (WITHOUT UNDERFLOOR HEATING): 50MM MINIMUM. OVER UNDERFLOOR HEATING PIPES (SAND-CEMENT): 65-75MM TOTAL (MINIMUM 50MM ABOVE THE CROWN OF THE PIPES). OVER UNDERFLOOR HEATING PIPES (ANHYDRITE): 60-70MM TOTAL (45-50MM ABOVE PIPES). THESE MINIMUMS ARE REQUIRED FOR STRUCTURAL INTEGRITY — THIN SCREEDS CRACK AND HOLLOW UNDER FOOT TRAFFIC.
Can I tile directly onto anhydrite screed?
NOT WITHOUT REMOVING THE SURFACE LAITANCE FIRST. ANHYDRITE SCREED FORMS A THIN WEAK CALCIUM SULPHATE LAITANCE LAYER ON THE SURFACE DURING CURING — TILING DIRECTLY ONTO THIS LAITANCE WILL RESULT IN TILE DEBONDING. GRIND THE SURFACE WITH A DISC GRINDER (OR SAND WITH A BELT SANDER) TO REMOVE THE LAITANCE AND EXPOSE THE FIRM SUBSTRATE. PRIME WITH AN APPROPRIATE SBR PRIMER (MAPEI PRIMER G, ARDEX P51) BEFORE TILING.
How much does floor screed cost in London?
SAND-CEMENT SCREED (50MM UNBONDED, PER M²): £15-30. SAND-CEMENT OVER UFH (75MM, PER M²): £20-35. ANHYDRITE FLOWING SCREED (60MM OVER UFH, PER M²): £25-45. POLYMER-MODIFIED LEVELLING COMPOUND (10-25MM CORRECTION, PER M²): £15-30. ALL COSTS LONDON 2025-2026.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.

Ready to Discuss Your Project?

Free site survey. No obligation. Covering all Greater London & M25.

📞 Call now💬 WhatsAppFree Quote