Introduction
Choosing a contractor for a home extension is one of the most significant decisions you'll make during the project. Get it right and the build runs smoothly, comes in on time, and meets your expectations. Get it wrong and you're dealing with disputes, poor workmanship, programme delays, and in the worst cases, projects that are never completed.
In London's residential construction market, homeowners are often presented with a wide range of options — from small local builders to larger design-and-build firms. Comparing them meaningfully isn't always easy, especially when the information being offered varies significantly between quotes.
This guide sets out eight things to check before you appoint a contractor for your extension.
1. Are They Registered with a Trade Body?
The most credible trade registrations in UK residential construction include the Federation of Master Builders (FMB), whose members must pass an independent assessment and carry appropriate insurance; TrustMark, the government-endorsed quality scheme for home improvement work; Checkatrade, with verified reviews and background checks; and TrustATrader, with independently reviewed tradespeople. None of these guarantees perfect work, but they provide a baseline of accountability that an unregistered contractor cannot.
2. Can They Provide Evidence of Recent Similar Work?
Ask specifically for examples of extensions similar to yours — similar size, similar project type, similar property. Better still, ask whether you can speak to a previous client or, where appropriate, visit a recent project. Any contractor confident in their work will welcome this request. Reluctance to provide references is a red flag.
3. Do They Carry the Right Insurance?
A contractor working on your home should carry public liability insurance (protection if property or people are damaged during the build), employers' liability insurance (required if they employ staff), and contractors' all-risk insurance (covering the works while under construction). Ask to see the certificates before appointing and verify that the policy is in date and covers the type of work being carried out.
4. Do They Provide a Proper Written Contract?
A verbal agreement or an invoice-and-quote chain is not adequate protection for a significant building project. You should expect a written contract that clearly sets out the scope of works, the programme and key milestones, the payment schedule linked to milestones, how variations will be handled, and what happens if there are delays or disputes. If a contractor is uncomfortable providing a proper written contract, do not proceed.
5. Is Their Quote Detailed Enough to Be Meaningful?
A quote that breaks down demolition, foundations, structural work, first-fix, second-fix, glazing, roofing, and finishing separately — with inclusions, exclusions, and assumptions clearly stated — tells you far more than a single-line figure. Be very cautious about the cheapest quote if it is also the least detailed. A low price based on assumptions that don't hold will become an expensive price by the time the project is finished.
6. Who Is the Principal Contractor?
Under CDM 2015, any project involving more than one contractor must have a principal contractor appointed in writing. Ask who will fill this role, what it means on their projects, and how they manage coordination between trades. A contractor who doesn't know what CDM 2015 is, or who dismisses it as irrelevant to your project, is not operating with the level of professional awareness you should expect.
7. How Do They Communicate During the Build?
Ask how updates will be communicated during the project, how often you'll hear from them, and what happens when an issue arises on site. A professional contractor will have a process for this — a named contact, an agreed update schedule, and a clear approach to raising variations or problems. Contractors who communicate well before you've appointed them tend to communicate well during the build.
8. Is the Programme Realistic?
Ask for a written programme with milestones. An experienced contractor will give you realistic timescales, flag likely pinch points, and explain what the build sequence involves. An optimistic programme that doesn't account for material lead times, Building Control inspections, or coordination between trades will almost certainly overrun.
How RCB Approaches Contractor Selection
At RCB Design & Build, we operate as a full principal contractor and are transparent about our process, our accreditations, our contract terms, and our project communication standards from the first conversation. We believe the right contractor should make the selection process easy — by providing the information you need to make a confident decision. Contact us to discuss your extension project.