What Is a Method Statement in Construction?

Landing with rooflight and oak-topped balustrade — rcbGroup projectrcbGroup project

What Is a Method Statement in Construction?

A method statement is a document that describes, step by step, how a specific construction task will be carried out — particularly when that task involves significant health and safety risks. Method statements are a routine part of professional construction management and are required on the majority of commercial and many larger residential projects. They sit alongside risk assessments and form part of the site safety documentation that a Principal Contractor is responsible for maintaining.

What Does a Method Statement Contain?

A typical construction method statement contains: a description of the task to be carried out; the sequence of operations (the order in which the work will be done); the plant, equipment, and materials to be used; the number and competency of workers involved; the precautions to be taken to manage identified risks; emergency and first aid arrangements; and any permits or approvals required before the work can start.

On complex or high-risk tasks — working at height, demolition, deep excavation, working with hazardous materials — the method statement may be detailed and several pages long. For routine operations with lower risk, it may be briefer.

When Is a Method Statement Required?

Under CDM 2015, the Principal Contractor is responsible for planning, managing, monitoring, and coordinating health and safety throughout the construction phase. The Construction Phase Plan — which the Principal Contractor must prepare before works start — will identify specific high-risk tasks for which method statements and risk assessments are required. High-risk tasks that typically require method statements on residential projects include: structural demolition; working at height on scaffolding; installation of structural steel; deep excavations; and any work involving asbestos (which must be handled only by a licensed contractor with its own detailed method statement).

Some clients and principal designers also request method statements for tasks that aren't strictly required by regulation — for example, complex propping and temporary support arrangements before an opening is formed in a structural wall. This is good practice.

Why Method Statements Matter

Method statements matter because they force the contractor to think through a task carefully before starting — identifying risks, sequencing the work correctly, and ensuring the right equipment and people are in place. A contractor who produces a method statement is a contractor who has planned the work. A contractor who dismisses method statements as unnecessary bureaucracy is a contractor who is relying on improvisation in high-risk situations. For a homeowner, asking whether method statements are prepared for key tasks is a useful indicator of how seriously a contractor takes their professional responsibilities.