Building Regulations Drawings vs Planning Drawings: What Is the Difference?

One of the most common sources of confusion for homeowners embarking on a construction project is the difference between planning drawings and building regulations drawings. Both are required for most significant works, but they serve entirely different purposes and contain different information.…

Key Takeaways

  • ✓Planning drawings show what the building will look like and are used for the planning permission decision — they do not contain construction specification
  • ✓Building regulations drawings contain full technical detail (structure, insulation, drainage, ventilation, fire) and are what the builder works from on site
  • ✓You cannot build from planning drawings alone — a separate set of building regulations drawings is always required
  • ✓On Permitted Development projects, planning drawings are not required — but building regulations drawings are always required for structural work
  • ✓Both sets are produced by an architect, with structural input from an engineer — they are submitted to different authorities for different approvals
Architectural drawings with drafting pencils and a rulerIllustrative image

Building Regulations Drawings vs Planning Drawings: What Is the Difference?

One of the most common sources of confusion for homeowners embarking on a construction project is the difference between planning drawings and building regulations drawings. Both are required for most significant works, but they serve entirely different purposes and contain different information.

Planning drawings are used to obtain planning permission from the local planning authority. They show the proposed design of the building from the outside — elevations, floor plans showing layout, a site plan showing the building in context, and often existing and proposed drawings in parallel. The purpose of planning drawings is to allow the local authority to assess whether the proposed development is acceptable in planning terms: whether it is the right size, in the right position, has an acceptable impact on neighbours and the streetscene, and complies with planning policies.

Planning drawings are typically produced by an architect or designer and do not need to show construction details, material specifications, structural design, drainage routes, insulation specifications, or fire separation. They need to show what the building will look like, where it sits on the plot, and how it relates to neighbouring buildings and the street.

Building regulations drawings (also called technical drawings, construction drawings, or working drawings) serve a completely different purpose. They are used to demonstrate to Building Control that the proposed works will comply with the Building Regulations — the technical standards for structural safety, fire resistance, energy efficiency, ventilation, drainage, and accessibility that apply to construction in England.

Building regulations drawings contain far more technical detail than planning drawings. They typically include: structural details (beam sizes, foundation depths, connection details), insulation specifications and U-value calculations, ventilation and MVHR layouts, drainage and rainwater disposal details, fire separation and intumescent products, staircase and balustrade dimensions, means of escape in case of fire, and often details of materials and products to be used.

A key practical point is that planning drawings, even if approved, cannot be used to build from. They lack the technical specification a builder needs to construct to the correct standard. Building regulations drawings are what the contractor uses on site, and they are what Building Control inspects against.

For most projects, you will need both: planning drawings first (to get planning permission), then building regulations drawings (to get Building Regulations approval and provide the construction specification). On simpler projects within Permitted Development, planning drawings may not be needed at all — only building regulations drawings.

RCB works with architects and structural engineers to coordinate both sets of drawings as part of the pre-construction process, ensuring that what is designed and approved can actually be built. +44 7359 872594 | connect@rcbGroup.co.uk | www.rcbGroup.co.uk

Frequently Asked Questions

Can I use planning drawings to build from?▼
No. Planning drawings show what the building will look like and where it sits — they are used for the local authority planning decision. They do not contain the technical information needed to build: structural details, insulation specifications, drainage, ventilation, fire protection, or material specifications. You need separate building regulations drawings, which are produced after planning approval and provide the construction specification.
Do I always need planning drawings for a London home extension?▼
Not always. If the extension falls within Permitted Development limits and does not require a planning application, planning drawings are not needed. However, building regulations drawings are always required for new extensions, loft conversions, and structural alterations — regardless of whether planning permission was needed.
Who produces building regulations drawings?▼
Building regulations drawings are typically produced by an architect or architectural technician, working alongside a structural engineer who provides the structural calculation and details. The package is submitted to Building Control (either the local authority or an approved private inspector) for approval. On complex projects, other specialists (drainage engineer, MVHR designer, fire engineer) may also contribute.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. To talk through your own project, book a project review.

Was this guide helpful? Share it:

Have a question about your project?

Message us on WhatsApp or call — we reply during working hours (Mon–Fri 8am–6pm, Sat 9am–2pm).

Ready to Discuss Your Project?

Project review, scope clarity and a clear next step. Greater London and the M25.

Call nowWhatsAppProject Review