Contents
The reference list the contractor supplies
Every contractor seeking work will provide a list of references — previous clients who are willing to speak in their favour. This is the starting point, not the endpoint, of reference checking.
- **How to use a supplied reference**:
- •Phone rather than email: a phone call allows you to ask follow-up questions and to judge the nature of the response (hesitation, qualification, genuine enthusiasm)
- •Prepare your questions in advance:
- 1. What was the project (type, size, scope)?
- 2. Was the project completed on time? If not, why not and by how much?
- 3. Was the project completed within budget? If there were variations, were they fair and well-communicated?
- 4. How was the site kept during the works?
- 5. How well did the contractor communicate — regular updates, prompt responses to queries?
- 6. Were there snagging issues after completion? How were they handled?
- 7. Would you use this contractor again?
- 8. Is there anything you wish you had known before appointing them?
**The limitation of supplied references**: A contractor will only supply the references of clients who were happy. Unhappy clients are not on the list. Supplied references tell you that the contractor is capable of doing a good job — not that they consistently do. The independent checks below provide the balance.
- **Site visits to completed work**:
- The most valuable check is a visit to a completed project — a physical inspection of work the contractor has done. Ask to visit a completed project of similar type and scale to yours. Check:
- •Quality of finish (plastering, joinery, tiling, pointing)
- •Accuracy of geometry (are walls plumb, tiles square, doors hanging correctly)
- •Evidence of quality materials
- •Whether the client seems genuinely satisfied or is presenting the project charitably
A contractor who will not allow site visits to completed work is not a contractor you should appoint.
Independent checks: Companies House, reviews, and professional registers
**Companies House check**: Every limited company registered in the UK is required to file accounts and confirmation statements with Companies House. Checking a contractor's Companies House record is free and takes 5 minutes: search at beta.companieshouse.gov.uk.
- What to check:
- •Registration status: is the company still active? A company dissolved (Companies House status 'Dissolved') means the company has been wound up — it cannot legally trade
- •Date of incorporation: a company incorporated 3 months ago with no accounts filed is a new entity. The principal may be an experienced contractor trading under a new name — or may not be. Ask why the company is new if the principal claims 20 years' experience
- •Filed accounts: the most recent micro-entity accounts or full accounts show the financial health of the business. Key indicators: Are retained earnings positive? Is the equity positive? Has the company had a large loss in recent years? A company with net liabilities (liabilities exceeding assets) is potentially insolvent — which is a significant risk to your deposit and to the project
- •Directors and their history: click on each director's name to see other companies they are (or were) directors of. If a director has been involved in multiple previous dissolved or struck-off companies, this is a red flag — it may indicate a history of trading under a company, accumulating debts, and dissolving before paying them
- **Review platforms**:
- •Checkatrade: ratings from verified customers — a Checkatrade score below 9.0/10 on more than 20 reviews is below the platform average and worth noting. Read the 1–3 star reviews specifically — they reveal how the contractor handles disputes, snagging, and communication failures, not just their best work
- •Google Reviews: unverified but harder to game than platform-specific reviews; negative reviews often contain more detail about specific issues
- •Trustpilot, Bark, Houzz: useful secondary sources
- •Read negative reviews carefully: a single negative review in 50 may simply be an outlier; multiple negative reviews citing the same issue (poor communication, uncompleted snagging, overcharging for variations) are a pattern
- **FMB and trade body membership**:
- •Federation of Master Builders (FMB): members must pass a vetting assessment, adhere to a code of conduct, and carry adequate insurance. FMB membership is not a guarantee of quality but it does indicate a minimum standard of professionalism
- •TrustMark: government-endorsed quality scheme; similar vetting process
- •Checkatrade approved contractor status: requires background checks and insurance verification — but does not assess workmanship quality directly
- •NICEIC (electricians) and Gas Safe (gas engineers): these are mandatory safety certifications, not quality endorsements. Verify that the contractor's electricians and gas engineers hold the appropriate certifications for the work they will be doing
- **Verify at source**:
- A critical and often skipped step: the contractor may show you a Checkatrade badge, an FMB logo, or a Gas Safe card — but verify the actual registration directly on the relevant body's website:
- •NICEIC: electrician check at niceic.com/find-a-contractor
- •Gas Safe Register: gassaferegister.co.uk/check-a-register
- •FMB: findamember.fmb.org.uk
- •TrustMark: tmregister.trustmark.org.uk
Do not rely on the contractor's own marketing materials — logos can be copied. The official register is the authoritative source.
Red flags in the quotation and pre-appointment stages
Beyond the reference and credential checks, certain behaviours during the quotation and pre-appointment stage should raise concern:
**1. No written quotation**: Any contractor who will not provide a written quotation (even a brief scope and price breakdown) and insists on a verbal agreement only is not a contractor you should appoint. A written quotation protects both parties. Its absence creates the conditions for scope disputes and overcharging.
**2. Requires a very large upfront deposit**: A request for more than 20–25% of the contract value as an upfront deposit is a red flag. The industry standard is: a small mobilisation deposit (5–15%) with progress payments tied to completion milestones. A contractor who needs a large deposit before starting work may be using your deposit to fund another project — or worse, to repay debts. If a deposit is required, pay by credit card (which provides Section 75 consumer credit protection for amounts over £100 up to £30,000) or by bank transfer only to the company account listed on Companies House, not to a personal account.
**3. Extreme underpricing**: A quotation that is 40–60% below the others you have received for the same scope is a signal that: the contractor has not understood or priced the scope correctly; they will recover the margin through variations during the works; or they plan to use substandard materials or undertake the work at a pace and quality below what you expect. A very low price is not a bargain — it is almost always a problem in a different form.
**4. Pressure to start immediately**: A reputable contractor with a full orderbook does not need to pressure a client to sign immediately. Pressure to commit 'today' or risk losing the price or the slot is a sales tactic that is inconsistent with the operating style of a well-run business.
**5. No contract**: All residential construction work should be done under a written contract. For works over approximately £5,000, a formal contract (JCT Minor Works, RIBA domestic contract, or equivalent) is appropriate. A contractor who refuses to sign a contract or who dismisses your request as unnecessary formality is not operating to a professional standard.
**6. Cannot provide insurance certificates**: Public liability insurance (minimum £2m, preferably £5m) is the minimum. Employers' liability insurance (£5m minimum) is legally required if the contractor has employees. Request the actual insurance certificate (not just a claim that insurance is held) and check the expiry date and the scope of cover.
Frequently Asked Questions
How many references should I check before appointing a contractor?▼
What is a Section 75 protection and how does it help with contractors?▼
What if the contractor is a sole trader rather than a limited company?▼
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.