Contents
What design and build means — and how it differs from traditional procurement
**Traditional procurement (architect-led)**:
In the traditional procurement route: 1. The client appoints an architect independently 2. The architect designs the project to the client's brief 3. The architect produces drawings and a specification 4. The client (with the architect's help) goes out to tender — getting prices from several contractors 5. The client appoints a contractor to build the design 6. The architect administers the contract during construction — certifying payments, issuing variations, and approving the finished work
*The key feature*: The architect's design obligation is to the client and is separate from the contractor's build obligation. If the design causes problems on site (an error in the drawings, an impractical detail, or a specification that conflicts with what is actually available), the contractor flags the issue, the architect resolves it (usually at no additional cost to the client), and work continues.
*The liability split*: The architect carries design liability; the contractor carries construction liability. If a structural failure occurs because the design was inadequate, the claim is against the architect (via their professional indemnity insurance). If the failure occurred because the contractor did not build in accordance with the design, the claim is against the contractor.
**Design and build procurement**:
In design and build: 1. The client prepares an 'employer's requirements' document — a brief describing what they want the project to achieve, the performance standards they require, and the constraints they are working within 2. A single design-and-build contractor (such as RCB Design & Build) is appointed to both design and construct the project 3. The contractor prepares 'contractor's proposals' — their design response to the employer's requirements 4. The contract is based on the contractor's proposals and the employer's requirements 5. The contractor delivers the designed and built project for an agreed sum
*The key feature*: There is a single point of accountability — the contractor is responsible for ensuring that both the design and the construction achieve the employer's requirements. If the design has a problem, it is the contractor's problem to resolve, not the client's.
*The liability split*: The design-and-build contractor carries both design liability and construction liability — they are responsible for the finished building being fit for the purposes described in the employer's requirements.
**The JCT Design and Build Contract**:
- The standard contract form for design-and-build projects in the UK is the JCT Design and Build Contract (JCT DB 2016). The key documents are:
- •*Employer's Requirements*: The client's brief — what the building must do, what standard it must meet, what planning context applies, any design elements the client wishes to specify themselves
- •*Contractor's Proposals*: The contractor's design response — floor plans, elevations, specification schedule, method statement
- •*Contract Sum Analysis*: A breakdown of the contract sum by element (structure, external envelope, internal finishes, services, external works)
For domestic residential projects, a simpler form of design-and-build agreement (the scope-and-specification document plus a payment schedule, as described in RCB's standard approach) achieves the same commercial outcome without the complexity of the full JCT DB form.
The advantages and risks of design and build — and how to manage them
**The advantages of design and build**:
**1. Single point of accountability**:
In a traditional project, if something goes wrong, the client may find themselves caught between the architect (who says the design was correct) and the contractor (who says the problem arose from the site conditions, which the design didn't address). In design and build, there is no such gap — the contractor is responsible for the complete outcome.
**2. Price certainty before design is complete**:
In a traditional project, the contractor is appointed after the design is finished — the client does not know the final build cost until tender. In design and build, the contractor is appointed earlier in the process based on the employer's requirements, which means the cost is agreed before the detailed design is finished. Any design decisions that would increase cost beyond the contract sum must be agreed as a client-instructed variation.
**3. Buildability**:
Design-and-build contractors design with construction in mind — they know what is achievable with their subcontractors and supply chain, what materials are available within the programme, and what details will be practical on site. Traditional architects sometimes specify details that are elegant on paper but impractical to build, causing site problems and variations.
**4. Speed**:
Design and construction can be overlapped in a design-and-build project — foundation design and specification can be finalised while roof design is still being completed. This is not possible in the traditional route, where the full design must be complete before any build work begins.
**The risks of design and build — and how to manage them**:
**Risk 1 — Design quality**:
The contractor's primary obligation in a design-and-build contract is to meet the employer's requirements — not to produce the best possible design. If the employer's requirements are vague or incomplete, the contractor may make design decisions that meet the technical requirements but are not what the client expected aesthetically or functionally.
- *How to manage*: Prepare detailed employer's requirements. For any project where design quality matters (which is most residential projects), specify:
- •Spatial requirements (minimum room sizes, ceiling heights, relationship between rooms)
- •Design intent (examples of the aesthetic you want — precedent images, material preferences, glazing ratio)
- •Performance requirements (U-values, acoustic separation, ventilation standards)
- •Material specifications (brick type, window material and colour, roof covering type)
- •Any specific products or finishes you want to reserve the right to approve
**Risk 2 — Value engineering against the client's interests**:
In a design-and-build contract, the contractor has an incentive to reduce costs in the design to increase their margin. This is 'value engineering' — but it can result in specification downgrade rather than genuine efficiency.
*How to manage*: Agree a detailed specification schedule at contract stage. Any departure from the agreed specification is a variation — the client has the right to reject a substitution or require compliance with the original specification. The more precisely the employer's requirements define the specification, the less room there is for value engineering against the client's interests.
**Risk 3 — No independent design oversight**:
In the traditional route, the architect acts as the client's agent during construction — certifying payments, checking quality, and approving the work. In a pure design-and-build contract, there is no independent professional checking the contractor's work on the client's behalf.
*How to manage*: For significant projects, appoint an independent project manager, employer's agent, or building surveyor to act on your behalf during the construction stage — reviewing the contractor's design, checking quality at key inspection stages, and certifying that the work meets the specification before releasing payments. The cost (typically £500–£1,500 for a domestic project) is well worth the protection it provides.
**RCB Design & Build's approach**:
RCB Design & Build operates as a design-and-build principal contractor — taking responsibility for design coordination (working with architects, structural engineers, and specialist designers), and for the construction delivery. Our process:
1. *Initial brief and consultation*: We understand the client's goals, the site constraints, and the compliance requirements 2. *Design development*: We coordinate with our architects and engineers to develop a design that achieves the brief within the client's budget 3. *Scope and cost sign-off*: A detailed scope of works and a fixed price are agreed before any construction work begins 4. *Pre-construction information*: We coordinate all the technical information — structural design, party wall compliance, Building Regulations — before mobilisation 5. *Delivery*: We manage all trades and coordinate delivery to the agreed programme and specification 6. *Post-completion*: A full defects liability period and a structured handover process
When design and build is the right choice and when it isn't
**Design and build works best when**:
- •*The client has a clear functional brief but is not focused on a particular architectural design outcome*: 'I need a 30m² kitchen extension, open plan, with bifold doors, and a utility room' is a well-defined employer's requirement. 'Create a spatially transformative experience that references the industrial heritage of the area' is not suitable for design and build without a very strong architect involved in the employer's requirements.
- •*Speed and cost certainty are the primary priorities*: Design and build delivers cost certainty before the detailed design is complete; traditional procurement requires the full design before pricing.
- •*The project is repeat or standard in nature*: A contractor who has done 50 similar loft conversions or rear extensions can design and build the 51st with high confidence in the programme and cost. A contractor designing a one-off complex project for the first time carries more risk.
- •*The contractor has in-house or trusted design resource*: Design and build requires the contractor to coordinate the design — if they are outsourcing this to a low-cost unfamiliar architect, the risk of design failure is higher.
**Traditional procurement works better when**:
- •*Architectural design quality is the primary goal*: If the client wants an exceptional, award-quality spatial design — a complex geometry, a specific material palette, a building that responds to its context in a sophisticated way — an independent architect has the creative freedom and professional obligation to advocate for the design intent throughout the project. A design-and-build contractor's design obligation is to meet the employer's requirements, not to produce great architecture.
- •*The project involves significant heritage, conservation, or listed building complexity*: An experienced heritage architect working independently for the client is better placed to navigate the requirements of a listed building or Conservation Area than a design-and-build contractor.
- •*The client is procurement-sophisticated and wants competitive tendering*: If the client wants to drive competitive pricing by tendering the project to multiple contractors, they need a fixed design to tender against — which requires an independent architect's complete design first.
- •*The client wants independent quality oversight during construction*: The architect in a traditional project is the client's watchdog on site — a design-and-build contractor has no incentive to be their own watchdog.
Frequently Asked Questions
Is design and build more expensive than traditional procurement?▼
Who owns the design in a design-and-build contract?▼
What is an 'employer's requirements' document and do I need a professional to write it?▼
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.