Contents
The main drawing types and what they show
A professional architectural drawing package for a home extension or renovation typically includes several types of drawings, each showing a different view of the project:
**Location Plan**: A map-scale plan (typically 1:1250 or 1:2500) showing the property in its wider context — the surrounding streets, neighbouring buildings, and the site boundary. This drawing is required for planning applications. It does not show the building in detail — it shows *where* it is.
**Site Plan / Block Plan**: A larger-scale plan (typically 1:500 or 1:200) showing the entire site (house + garden) with the position of the proposed extension marked. Used in planning applications to show the relationship of the extension to the site boundaries and neighbouring structures.
**Floor Plans**: The most important drawing type for understanding a project. A floor plan shows a horizontal cut through the building at approximately window height (approximately 1.0–1.2m above floor level) and looks *down* from that level. Everything you see on a floor plan is what you would see if you sliced through the building horizontally and removed everything above the cut line.
- What to look for:
- •Walls (shown as thick hatched or solid lines) — check wall thicknesses match the specification
- •Room dimensions (usually annotated in millimetres on UK drawings)
- •Door positions and swing direction (shown as an arc)
- •Window positions (shown as a break in the wall with three parallel lines representing the glass unit)
- •Stair positions (shown as lines across the stair plan, with an arrow indicating up)
- •Room labels and areas (m²)
- •North point — orientation of the plan relative to north
- **Elevations**:
- Elevation drawings show the *vertical* faces of the building — typically one drawing per external face (front elevation, rear elevation, side elevations). Elevations show:
- •The external appearance of the building — materials, windows, doors, roof form, heights
- •Ridge height and eaves height (usually annotated with a datum level in metres above a benchmark)
- •How the extension relates to the existing building visually
Elevations do not show what is inside the building — they show only the external face.
- **Sections**:
- A section drawing shows a vertical cut through the building (like a floor plan is a horizontal cut). The section line is shown on the floor plan as a heavy line with arrows at each end indicating the direction of view. Sections show:
- •The internal heights of rooms at various points
- •The floor, wall, and roof construction at a cut through the building
- •How the new extension connects to the existing structure
- •Staircase proportions (if the section cuts through the stair)
- •The relationship between floor levels — particularly important where the extension floor level differs from the existing house
Scales, dimensions, and reading annotations
- **Drawing scales**:
- All architectural drawings are drawn to scale — a relationship between the drawing size and the actual size of the building. Common scales used on UK construction drawings:
- •1:200 — site plans and block plans (1mm on paper = 200mm in reality)
- •1:100 — general arrangement drawings (floor plans, elevations for planning)
- •1:50 — construction detail drawings (wall sections, foundation details, stair details)
- •1:20 or 1:10 — close-up details (window jamb sections, kitchen elevations, connection details)
- •1:5 or 1:2 — very fine details (junction details, waterproofing specification)
**How to verify the scale**: Always check the scale bar on the drawing before measuring. Do not measure directly from a printed drawing without checking the scale bar — drawing prints at non-standard paper sizes (e.g., A3 when the drawing is designed for A1) throw out all measurements. Use the annotated dimensions on the drawing rather than scaling from the paper.
**Dimensions**: On UK construction drawings, dimensions are in millimetres (mm) unless specifically stated otherwise. A room labelled 3600 × 4200 is 3.6m × 4.2m. Heights are sometimes given in metres on elevation drawings (e.g., +3.500 FFL means 3.5 metres above finished floor level).
- **Existing vs proposed**:
- Drawings for extensions typically show both the existing building and the proposed new work. The convention is:
- •Existing fabric: shown in light lines, sometimes dashed or grey
- •Proposed new work: shown in heavy solid lines, often with a dark hatch pattern on new walls
- •To be demolished: shown with a hatched or crossed line pattern, sometimes in a different colour
Make sure you can identify which elements are existing and which are new — this distinction drives the scope and cost of the project.
**Drawing references and revisions**: Each drawing has a unique reference number (e.g., 001, 002, 100, etc.) and a revision indicator (e.g., P1 = Planning Issue 1, C1 = Construction Issue 1, Rev A, Rev B). Always confirm with your architect which revision of each drawing is current — using an outdated revision of a drawing to build from causes errors and is a common source of site disputes.
Construction drawings vs planning drawings and what contractors build from
There are typically two levels of drawing detail in a home extension project:
**Planning drawings**: Prepared to show the Local Planning Authority what is proposed — layouts, elevations, and external appearance. Planning drawings are typically at 1:100 scale. They show the *concept* of the design — what rooms go where, how the extension looks externally, and how it sits on the site. They do NOT contain enough detail to build from — they show overall form and external appearance, not construction details.
- **Construction drawings (technical drawings)**:
- Prepared for Building Regulations submission and for the contractor to build from. Construction drawings are more detailed than planning drawings:
- •Wall construction details showing insulation, cavity, blockwork, and finishes
- •Foundation details showing depth, width, and reinforcement
- •Roof construction details showing rafters, joists, insulation, and tiles
- •Window and door schedules (a table listing every window and door, their size, specification, and supplier)
- •Structural engineer's drawings showing steelwork, beam sizes, and connection details
- •Drainage scheme showing pipe routes, inspection chambers, and connection to existing drain
You should not allow a contractor to start building from planning drawings alone — construction drawings and structural drawings are essential for a contractor to build the project correctly, and for Building Control to approve the work. If your project started without full construction drawings, this is a risk.
- **What to check before the contractor starts**:
- •Do you have the most current revision of all drawings?
- •Are structural drawings issued and approved by Building Control?
- •Does the contractor's scope of works match the drawings? (Any item on the drawings should be in the scope; any item excluded from the scope should be clearly stated)
- •Are there any items on the drawings that are provisional (e.g., kitchen layout subject to client confirmation) — these must be resolved before construction reaches that element
Frequently Asked Questions
What is the difference between planning drawings and construction drawings?▼
Why do dimensions on a floor plan not match what my builder tells me the room size will be?▼
How many different drawings should a complete extension drawing package include?▼
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.