Planning & Regulations3 min read

Building Control in London: Full Plans vs Building Notice, Inspections, and Completion

Building Control is the statutory process that ensures construction works comply with the Building Regulations in England. For the vast majority of home extension, loft conversion, and structural alteration projects in London, Building Control approval is not optional — it is a legal requirement. The Building Control process has changed significantly since 2022 (Building Safety Act 2022) and the changes affect how homeowners and contractors access Building Control services, how inspections are organised, and what documentation is issued at the end of the project. Understanding the Building Control process allows London homeowners to plan the compliance pathway correctly from the start.

Key Takeaways

  • Building Control approval is a legal requirement for virtually all London home extensions, loft conversions, structural alterations, basement conversions, and garage conversions. It is separate from planning permission — having planning permission does not mean you have Building Control approval. Submit a Full Plans application or Building Notice before works start.
  • Full Plans vs Building Notice: use Full Plans for any extension, loft conversion, or structural alteration over £30,000. Full Plans submits drawings for pre-approval, provides plan check certainty, and protects the homeowner from mid-build non-compliance discoveries. Building Notice (no drawings pre-approved) carries higher risk and is only appropriate for simple, like-for-like works.
  • Under the Building Safety Act 2022, Building Control is provided by Local Authority Building Control (LABC — the borough council) or Registered Building Control Approvers (RBCAs — private sector). Both issue valid Completion Certificates. The choice is made at the start of the project and cannot be changed. LABC is cheaper; RBCAs are typically faster.
  • The Building Control Completion Certificate is the document required by solicitors on a property sale. Without it, the buyer's solicitor requires indemnity insurance. Obtain the Completion Certificate promptly after the final inspection and retain it with the property's title documents. For works carried out without Building Control, a regularisation inspection (retrospective application) can be requested from the LABC.

What works require Building Control in London?

Building Regulations apply to most building work in England. The types of work most commonly carried out by London homeowners that require Building Regulations approval include: Extensions (rear, side, loft): any new extension to a dwelling-house requires Building Regulations approval under the structural, thermal, fire, and drainage provisions (Parts A, B, C, F, H, L, and P). Permitted development or planning permission does not replace Building Regulations approval — they are separate processes. Structural alterations (load-bearing wall removal, new openings, beam installation): all structural works require approval under Part A. Loft conversions: require approval under Parts A (structural floor and roof), B (fire escape), F (ventilation), L (insulation), and typically Part P (electrical). Garage conversion to habitable space: requires approval under Parts A, B, C, F, L, and potentially Part H (drainage if new WC is added). Basement conversion: requires approval under Parts A, B (fire escape), C (damp/waterproofing), F, L, and typically Part P. Electrical works in new or extended rooms: require approval under Part P. New boiler installation or central heating replacement: requires approval under Part L and Part J (combustion appliances) — typically self-certified by a Gas Safe registered installer. New shower or bathroom with drainage: requires approval under Part H. Replacement windows and glazed doors: require approval under Part L (U-value compliance) and Part B (fire escape from bedrooms) — typically self-certified by a FENSA or CERTASS registered window installer. Works that do NOT typically require Building Regulations: like-for-like internal repairs (replacing plaster, flooring, decorating); non-structural internal works (installing fitted furniture, replacing a door within an existing opening); garden walls, fences, and gates (unless within 2 metres of a highway). When in doubt, ask the Building Control body before starting the works — they will confirm whether the proposed works are notifiable without charge.

Full Plans application vs Building Notice: which to use in London?

There are two main routes for Building Regulations compliance for domestic extensions and alterations in England: Full Plans application: a Full Plans application submits detailed architectural and structural drawings, specifications, and calculations to the Building Control body before works start. The Building Control body reviews the plans and, if they comply, issues a plan check approval (a notice stating that the plans are compliant, subject to inspection during construction). The benefit of Full Plans: the contractor knows exactly what is required before they start, the plan check approval provides evidence that the design is compliant for the purpose of the sale of the property, and the homeowner has written confirmation that the design as approved will comply. The cost is slightly higher (plan check fee + inspection fees) but the certainty it provides is well worth it for any project of significant value. Full Plans is strongly recommended for: extensions (particularly structural extensions with beams); loft conversions; basement conversions; any project over £50,000. Building Notice: a Building Notice does not submit detailed drawings for pre-approval — it simply notifies the Building Control body that work is about to start, and the Building Control inspector visits during construction to check compliance. The Building Notice route is faster to initiate (no waiting for plan approval) but carries higher risk: if the inspector identifies non-compliance during the works, the contractor must stop and remediate. For a structural alteration already under construction, remediation can be very expensive. A Building Notice cannot be converted to a Full Plans application once work has started. Building Notice is appropriate for: like-for-like replacements (new boiler, new windows via competent person scheme); small domestic alterations with no structural works; works where the contractor has extensive experience and confidence in compliance. Who decides which route to use: the choice is the homeowner's (subject to any requirement in a planning condition or party wall award). In practice, for a London home extension, most experienced architects and contractors recommend the Full Plans route for the certainty it provides.

LABC vs approved inspector (now registered building control approvers): who to use?

Under the Building Safety Act 2022, the Building Control market has been restructured. The two types of Building Control body that can approve domestic building work in England are: Local Authority Building Control (LABC): the Building Control department of the London Borough Council for the area where the works are taking place. LABC covers all works in the borough. LABC Building Control inspectors are council employees and are not commercially incentivised to approve works — their duty is to the public interest. Registered Building Control Approvers (formerly Approved Inspectors): private-sector Building Control companies that are registered with and regulated by the Building Safety Regulator. Examples include NHBC Building Control, Quadrant, Bureau Veritas, and many smaller firms. Under the Building Safety Act 2022, approved inspectors were required to re-register as Registered Building Control Approvers (RBCAs) by a transition deadline. RBCAs can now handle domestic building work. Key differences for a London homeowner: LABC: typically cheaper for plan check fees; slower response times (typically 5-10 working days for routine checks, longer for complex projects); the permanent official record of the works is held by the council; the Completion Certificate issued by the LABC is the standard document required by solicitors on a property sale. RBCAs: typically faster response times; may have more specialist experience in complex project types (large extensions, basements, heritage buildings); slightly higher fees; the Completion Certificate is issued by the RBCA and is equally valid for property sale purposes. Under the Building Safety Act 2022, clients are no longer able to switch between LABC and RBCA once a Full Plans application has been submitted — the choice of Building Control body must be made at the start of the project and is binding for the life of the project.

Building Control inspection stages and Completion Certificate

The Building Control inspection process for a London home extension typically involves the following site visit stages: Commencement notification: the contractor must notify the Building Control body that work has started (within 2 days of commencement). Foundation inspection: the inspector visits to check the foundation excavation depth and width before concrete is poured. For a London Clay foundation, this is the critical inspection — the inspector confirms that the foundation is at the correct depth and on competent bearing material. Oversite preparation inspection: the inspector checks the damp-proof membrane, insulation, and oversite preparation before the ground floor slab is poured. Damp-proof course inspection: the inspector checks the damp-proof course level and the wall cavity tie positions at first-floor level. Drainage inspection: if new drainage connections have been made (both foul and surface water), the inspector inspects and may pressure-test the drainage before backfilling. Roof structure inspection: for pitched roofs, the inspector checks the roof structure before the covering is applied; for flat roofs, the inspector checks the insulation board and the waterproofing system before the final finish is applied. Insulation and airtightness inspection: the inspector checks the insulation build-up (wall, roof, and floor) before it is concealed. Electrical and M&E inspection: where Part P electrical works have not been self-certified by a competent person, the inspector carries out an electrical inspection. Final inspection / Completion Certificate: the final Building Control inspection checks the completed works against the approved drawings and the Building Regulations. If everything is compliant, the Building Control body issues a Completion Certificate. The Completion Certificate is the document that proves the works were inspected and comply with the Building Regulations. It is required by a solicitor when the property is sold — without a Completion Certificate, the buyer's solicitor will require an indemnity insurance policy (typically £200-£500) to cover the risk of enforcement action. Obtain the Completion Certificate from the Building Control body promptly after the final inspection — it should be retained with the property's title documents.

Frequently Asked Questions

Do I need Building Control approval for a London home extension?
Yes — virtually all home extensions, loft conversions, structural alterations (load-bearing wall removal, beam installation), basement conversions, and garage conversions in London require Building Regulations approval. Planning permission and Building Control approval are separate processes — having planning permission does not mean you have Building Control approval. Submit a Full Plans application or Building Notice to the relevant Building Control body before works start.
What is the difference between a Full Plans application and a Building Notice in London?
Full Plans: submit detailed drawings for pre-approval before works start; Building Control body reviews and issues plan check approval; inspector visits at key stages; Completion Certificate issued on satisfactory final inspection. Recommended for all extensions, loft conversions, and structural alterations. Building Notice: notifies Building Control that work is starting without submitting drawings; inspector visits during construction; higher risk if non-compliance is found mid-build. Only appropriate for simple works. For a London extension, use Full Plans.
What is a Building Control Completion Certificate and do I need one?
The Building Control Completion Certificate is issued after the final inspection confirms that the completed works comply with the Building Regulations. It is required by solicitors when the property is sold — without it, buyers' solicitors require indemnity insurance. Retain the Completion Certificate with the property's title documents. If a Completion Certificate was not obtained for works carried out in the past, contact the Building Control body to request a regularisation inspection.
Should I use Local Authority Building Control (LABC) or a Registered Building Control Approver (RBCA) for my London extension?
Both are valid. LABC: typically cheaper, slower response, council-held record. RBCA: typically faster, specialist experience, slightly higher fees. For a standard London home extension (rear extension, loft conversion, structural alteration), LABC is perfectly adequate. For complex projects (basement, heritage building, large commercial-adjacent scheme) an RBCA with specialist experience may be preferable. Under the Building Safety Act 2022, the choice of Building Control body is made at the start of the project and cannot be changed.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.