How to Write a Specification for a London Home Extension

A clear, comprehensive specification is one of the most underused tools available to London homeowners commissioning an extension or renovation. Most homeowners commission projects from drawings and a verbal discussion with the contractor — without a written specification. The result is almost invariably scope disputes during construction: the homeowner expects a quality of finish, a material, or an inclusion that the contractor did not price. A clear written specification prevents these disputes before they arise, enables accurate like-for-like price comparison between contractors, and creates a contractual basis for quality standards throughout the project.

Key Takeaways

  • A written specification prevents the most common cause of London extension disputes — scope assumptions that differ between what the homeowner expected and what the contractor priced.
  • Structure the specification in construction sequence order: demolition, groundworks, structure, external envelope, first-fix services, insulation, plastering, second-fix, finishes, exclusions and assumptions.
  • The exclusions and assumptions section is the most important part — make explicit what is NOT included (client-supply items, external works, provisional sums, professional fees, Building Control fees).
  • Issue the same specification and drawings to all contractors simultaneously — this enables genuine like-for-like price comparison and removes the 30-50% price variance that arises from specification-free quoting.
  • RCB standard: all second-fix materials (tiles, sanitary ware, kitchen units, doors, flooring, light fittings) are client-supplied unless explicitly specified otherwise. Always clarify this before pricing.

What a specification is and why London homeowners need one

A specification is a written document that describes the standard and quality of work to be carried out on the project. It supplements the drawings (which show what to build and where) by describing how to build it and to what quality standard. The specification answers questions the drawings cannot: What type of brickwork? English bond or stretcher bond? What mortar colour and joint profile? What insulation type and thickness? What plasterboard board thickness? What paint system — how many coats? What is the standard of finish in the bathroom? Are the kitchen units included or client-supplied? What specification of windows — double or triple glazed? What type of flooring, and who supplies it? Without a written specification, all these questions are decided during construction — and the answers are decided by the contractor on the basis of what they priced (which may be the cheapest option), not what the homeowner expected. Common specification disputes on London extensions: Client expected: porcelain tiles to the full bathroom wall height. Contractor quoted: tiling to 1.8m splashback height. Value difference: £1,500. Client expected: oak internal doors throughout. Contractor quoted: standard hollow-core doors. Value difference: £2,000. Client expected: underfloor heating to the kitchen extension. Contractor quoted: radiators (UFH not explicitly specified). Value difference: £3,500. A specification eliminates these disputes because the standard and inclusion are defined before the contract price is agreed. The contractor prices what is specified — and if they propose a substitution or value engineer a specification item, they must do so explicitly and the homeowner can accept or reject the substitution with knowledge of what they are agreeing to.

What a specification for a London home extension should include

A practical specification for a London home extension or renovation is structured to mirror the construction sequence — from groundworks and structure through to finishes and completion. Key sections: Demolition and enabling works: what is to be demolished and removed; whether asbestos surveys are required (required before demolition of any pre-2000 structure in London); specification for structural propping and temporary support during demolitions. Groundworks and foundations: type of foundation (strip, pad, raft, mini piles) as specified by the structural engineer; concrete specification (strength class, mix, minimum cover); drainage: type of drainage (clay, plastic, or concrete), gradient, and connection points. Structural works: structural steel specification (grade, surface treatment, fire protection); structural masonry (block type, mortar designation, tie specification); structural frame (if timber frame — engineered timber specification, preservative treatment, structural connections). External envelope: external walls — brick type, mortar colour, joint profile (bucket handle, flush, recessed); internal face of external wall — block type, cavity width, insulation specification and thickness, cavity closers and ties; flat roof build-up — structural deck specification, VCL, insulation type and thickness, waterproofing system (EPDM, GRP, or other) and manufacturer; pitched roof — rafter and purlin sizes, breathable membrane, counter batten and tile batten, tile or slate specification and colour, ridge and hip details; windows and external doors — frame material (PVCU, aluminium, timber), glass specification (double or triple, low-E coating, argon fill), hardware specification, colour/finish. First-fix services: plumbing — pipework type (copper, plastic, push-fit), hot water system (combi boiler extension, unvented cylinder, or other), radiator type and finish, underfloor heating (if specified); electrics — wiring and cable specification, consumer unit type, socket and switch type and finish (standard white or designer). Insulation and airtightness: roof insulation to achieve target U-value; wall insulation type and target U-value; floor insulation (over ground floor slab) type and target U-value; airtightness specification (target air permeability in m³/h/m²) if applicable. Plastering and internal walls: plaster type (bonding + finish, multifinish, board finish), number of coats, tolerance (in mm at 2m straight edge); plasterboard type and thickness (12.5mm standard, 15mm acoustic or fire, 19mm on metal studwork); partition walls — timber stud or metal stud, specification of noggins, acoustic insulation in partitions between rooms. Second fix and finishes: internal doors — door type (solid oak, hollow core, fire door), door furniture (hardware specification — material, finish, lever or knob); flooring — type, manufacturer/range if specified, underlay, whether supply is by client or contractor; skirting and architrave — profile and material; decoration — paint system and number of coats, paint type (emulsion, eggshell, gloss), colour specification if agreed; bathroom — wall tile specification (size, manufacturer, grout colour), sanitary ware specification (manufacturer and model), heated towel rail specification; kitchen — kitchen supply and install by client or contractor, worktop specification, upstand, splashback.

Writing an exclusions and assumptions section: the most important part of a London extension specification

The exclusions and assumptions section of the specification is the most commercially important part. It makes explicit what is NOT included in the contract scope — and what the contractor has ASSUMED in pricing the work. This section protects both parties: it protects the contractor from claims that they should have included items that were not specified; and it protects the homeowner by making the contractor's assumptions explicit and challengeable before the contract is signed (not during construction when the leverage is gone). Typical exclusions and assumptions for a London extension specification: Supply items: are the kitchen units, bathroom sanitary ware, floor tiles, and internal doors supplied by the homeowner or by the contractor? (Make explicit.) Second-fix materials: RCB Design & Build standard contract terms specify that all second-fix materials (floor tiles, wall tiles, sanitary ware, kitchen units, internal doors, ironmongery, light fittings) are client-supplied unless explicitly stated otherwise in the specification. Make good to existing: does the scope include making good to existing internal finishes (redecoration of adjacent rooms affected by the works, making good to plastering and flooring that is disturbed by first-fix services routing)? Or is the scope limited to the new extension and the immediate opening through the existing house wall? External works: is external landscaping included (levelling and replanting the garden disturbed by the groundworks, resurfacing of paths and patio areas affected by the extension)? Or are external works excluded? Architect and structural engineer fees: are professional fees (architect, structural engineer, party wall surveyor) included in the contractor's quotation, or are they separate client-side costs? Building Control application fee: is the Building Control application fee (typically £500-£1,500) included in the contractor's quotation, or is it a client-side cost? Provisional sums: items whose cost cannot be determined until further information is available (for example, the cost of party wall works, or the cost of connecting to the main drain if the drain depth is not yet confirmed) should be identified as provisional sums with an estimate — not included in the fixed price. Party wall works: are party wall surveyor fees, the Schedule of Condition, and any remedial works to the Adjoining Owner's property included in the contract scope?

How to use the specification to get accurate like-for-like quotes from London contractors

The specification is most valuable as the basis for competitive tendering — the process of obtaining quotes from two or three contractors for the same scope of work. Without a specification, contractors produce quotes based on their own assumptions about the specification. The result is quotes that are not comparable — one contractor has priced high-quality brickwork, the other has priced the cheapest available; one has included UFH, the other has not. Comparing these quotes and choosing the cheapest is likely to result in either a poor quality outcome or a significant variation claim during construction. With a specification, all contractors price the same scope and the same standards — the quotes are genuinely comparable. Process for specification-based tendering in London: Prepare drawings (plan, elevation, section at minimum) and the specification document (using the structure above). Issue both to all contractors simultaneously. Ask each contractor to price the specification and to identify any items they wish to price as an alternative or deviation from the specification. At tender return, compare the quotes line-by-line (not just the total) — identify where deviations or omissions explain price differences. Select the contractor on the basis of the full picture: price, programme, qualifications, references, contract basis, and your confidence in their ability to deliver. A clear specification with an exclusions and assumptions section should produce quotes that are accurate to within 10-15% of the final contract value — significantly better than the 30-50% range of inaccuracy that is common with specification-free quote processes in London.

Frequently Asked Questions

Does a London extension contractor write the specification?
Usually the contractor does not produce the specification — they produce a quote based on the drawings and their assumptions. An architect or cost consultant (QS) produces the specification as part of the pre-construction documentation. If no architect is appointed, the homeowner or main contractor must agree the specification together before pricing. Without a written specification, the contractor prices what they assume — and assumptions are disputed during construction.
What materials should I specify for a London rear extension?
Key specification items: external brickwork matching the existing house (request a specific London stock brick to match — many London Victorian houses use London Stock Yellow or Fletton Red bricks); flat roof system (EPDM warm roof with minimum 100mm PIR insulation to achieve 0.15 W/m²K); windows (aluminium frames, thermally broken, double or triple glazed); internal plasterboard (12.5mm throughout); plaster finish tolerance (3mm in 2m); flooring (specify supplier or type — porcelain, engineered oak, etc.).
Should I specify the kitchen as part of a London extension?
Specify clearly whether the kitchen is client-supplied or contractor-supplied. Most London homeowners source and supply the kitchen directly from a kitchen designer or retailer — the contractor installs only. If the contractor is to supply and install, the kitchen range, manufacturer, and specification must be named in the specification, along with the worktop material. Never leave kitchen specification as a provisional sum if a specific kitchen is intended — the gap between a basic kitchen and a design kitchen is £5,000-£30,000+ for a London extension.
How detailed does a specification need to be for a London extension?
Detailed enough to prevent disputes about what is included and to what quality standard. At minimum, the specification should define: structural material specifications; external envelope (roof, walls, windows); insulation U-values; first-fix services (boiler, pipework, wiring type); finishes (plaster tolerance, number of paint coats); and all major items where client-supply vs contractor-supply is ambiguous. A 4-8 page specification document is appropriate for a typical London rear extension or loft conversion.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.

Ready to Discuss Your Project?

Free site survey. No obligation. Covering all Greater London & M25.

📞 Call now💬 WhatsAppFree Quote