Wet Rooms vs Traditional Bathrooms: Technical Comparison
Traditional bathroom (bath, separate shower tray with enclosure, basin, WC): The standard bathroom configuration in London homes. A shower tray (acrylic, stone resin, or tiled) contains the water within the shower enclosure. The shower tray must be properly sealed at its junction with the tiles and wall (silicone sealant, regularly maintained). The main waterproofing challenge is the tray surround and the wall tiles behind the basin.
Advantages of a traditional bathroom: lower construction cost (a shower tray is more straightforward to waterproof than a level-access wet room floor); lower risk of water escaping if construction is not perfect; easier to clean (the shower enclosure contains splashes).
Wet room (level-access shower, tanked floor, linear drain): A wet room has no shower tray โ the entire shower area (or the whole bathroom floor) is waterproofed by a tanking membrane applied to the structural floor and walls, then finished with tiles sloped to drain. A linear drain (a long, narrow drainage channel flush with the floor) or a point drain (a square or circular drain in the centre of the shower area) collects the water.
Advantages of a wet room: accessible design (no step over a shower tray โ ideal for elderly or mobility-impaired users); easier to clean (no shower tray surround with grout joints to maintain); more flexible layout (no fixed tray position); contemporary, high-specification appearance.
Technical requirements for a wet room: Floor construction: the existing floor must be assessed for structural suitability. In many London Victorian terrace first floors (timber joist construction), a wet room requires additional structural support or a waterproof screed substrate (e.g. Wedi or Jackoboard โ rigid foam board with a surface ready to receive tiles, which is lightweight and waterproof). A timber joist floor requires the joists to be checked for deflection (excessive movement in the floor allows the tanking membrane to crack and leak). Floor fall: the finished floor must slope uniformly to the drain at a minimum fall of 1:80 (12.5mm per metre). Achieving a consistent fall with a level base, a screed, and consistent tile bed depth requires accurate setting out. Tanking: the entire shower area must be waterproofed with a continuous, flexible membrane that is fully bonded to the substrate, with all joints, corners, and pipe penetrations sealed with specialist tape or fillet seals. Drain: the drain must be set at the correct level before tiling begins, as the finished floor tiles must meet the drain flange at exactly the right height.
Wet room vs shower tray cost: A shower tray (stone resin, 900mm ร 900mm) and glass screen: ยฃ600โยฃ1,500 supply. A wet room floor construction (Wedi board, tanking membrane, linear drain): ยฃ1,200โยฃ2,500 supply and installation, plus additional tiling cost over a larger area.
Part P Electrical Requirements in London Bathrooms
A bathroom is a "special location" under Part P of the Building Regulations (Electrical safety in dwellings). Special location rules apply because water and electricity are especially dangerous in combination.
IP (Ingress Protection) zones in bathrooms: The bathroom is divided into three zones based on proximity to water: Zone 0 โ inside the bath or shower tray (e.g. shower head, bath body jet). Only SELV (Safety Extra-Low Voltage โ 12V DC max) equipment rated to at least IP67 (fully waterproof) is permitted. Zone 1 โ directly above the bath or shower tray, to a height of 2.25m above the floor. Equipment must be rated at least IP45 (splash-proof). Shower units and certain dedicated bathroom light fittings are designed for Zone 1 use. Zone 2 โ the area within 600mm horizontally from the boundary of Zone 1, to a height of 2.25m above the floor. Equipment must be rated at least IP44. Most bathroom ceiling light fittings are specified for Zone 2.
Outside the zones โ bathroom areas more than 600mm from the bath or shower edge at heights above 2.25m: standard domestic light fittings (IP20) are acceptable, but the general room is still within the "special location" for the purposes of Part P.
Permitted and prohibited electrical items in bathrooms: Permitted: light fittings rated to the appropriate zone IP rating; SELV electrical supply (12V transformer outside the zone, light fitting inside); electric shower unit (designed for bathroom use, IP65+); shaver socket (BS EN 60742 Class II transformer, permitted outside Zone 0 and Zone 1); heated towel rail (either plumbed onto the central heating circuit โ no Part P issue โ or electric, with a fused connection unit outside the bathroom or a pull-cord switch inside); underfloor heating mat (wiring must be carried out by a Part P registered electrician).
Not permitted: standard 13-amp sockets in a bathroom. Switches and controls must be pull-cord operated (rated for bathroom use) or must be mounted outside the bathroom.
Part P compliance: All electrical work in a bathroom (new circuits, new light fittings in the zones, new electric shower connections) must be carried out by a Part P registered electrician (who self-certifies and issues a Minor Electrical Installation Works Certificate) or notified to Building Control. This applies even to replacing a like-for-like light fitting if it is within Zone 1 or Zone 2.
Bathroom Ventilation: Part F Standards and Fan Specifications
Bathrooms must be ventilated to Part F of the Building Regulations. The minimum ventilation requirements for a bathroom are:
Intermittent extract ventilation (an extract fan that runs when the bathroom is in use and for a period after): Minimum extract rate: 15 litres/second for a room with a bath or shower. Control: the fan must be activated by the bathroom light switch (switched fan), by a humidistat (activating automatically when humidity rises), or by motion detection. A timer override (run-on of at least 15 minutes after the light is switched off) must be provided.
Continuous running ventilation (a fan that runs continuously at a low rate with a boost to a higher rate during use): Minimum continuous rate: 8 litres/second for a bathroom. Boost rate during use: at least 15 litres/second.
Discharge to outside: The extract fan must discharge directly to outside โ through an external wall, through a duct that terminates at an external grille. Fans discharging into a ceiling void, a roof space, or another enclosed space are not compliant and create serious damp problems.
Fan selection for London bathrooms: A modern centrifugal bathroom fan (suitable for duct runs of 3โ5m) should be selected with an adequate extract rate for the room size. Popular brands for London residential work include Vent-Axia, Airflow, Manrose, and Domus. For a new renovation, a fan with a humidistat, time delay, and a backdraught shutter (preventing cold air and smells entering when the fan is off) is the recommended specification.
IPX rating of the fan: the fan body (the motor housing) is typically mounted in the ceiling space above the bathroom, with only the grille visible in the bathroom. The part of the fan visible in the bathroom must be rated to at least IP44 (Zone 2). Most bathroom ceiling fans are rated IP44 or IP54.
In a new bathroom renovation, the opportunity to run a new duct from the fan directly to outside through the shortest possible route should always be taken. Long, tortuous duct runs with multiple bends significantly reduce airflow below the rated capacity.
Waterproofing, Tanking, and Tile Specification
Waterproofing systems:
Tanking slurry (cementitious): A cement-based flexible waterproofing compound applied by brush or roller to block, brick, or concrete substrates. Used primarily for below-ground applications (basement bathrooms, wet rooms with concrete floors). Applied in two coats, with reinforcing tape at joints and corners. Brands: Sika Tanking Slurry, Aquapruf, Thistle Watertight.
Flexible waterproofing membranes (brush-applied): A two-component or single-component polymer-modified waterproofing membrane applied by brush or roller to any substrate โ plasterboard, cement board, existing tiles, screeds. Used for shower enclosures and wet rooms in above-ground bathrooms. Applied in two coats, with reinforcing tape at corners and joints and around pipe penetrations. Brands: Schluter Kerdi-DS, Mapei Mapegum WPS, Wedi Subliner Dry, BAL Tanking Kit.
Rigid board systems (Wedi, Jackoboard, Schluter Kerdi-Board): Extruded polystyrene foam boards with fibreglass-reinforced surface, supplied in standard sheet sizes, cut to fit the substrate. The boards are waterproof and provide a tile-ready surface without requiring a separate tanking coat. Used for wet room floor construction over timber joists (lightweight, no deflection risk), for shower wall linings (no drying time required โ tiles can be applied immediately), and for creating custom bath panels and niches.
The tile choice significantly affects the waterproofing performance and long-term maintenance: Large format tiles (600mm ร 600mm and above): fewer grout joints, less risk of grout cracking over time, easier to clean. Require a very flat, even substrate. Small format tiles (mosaics, subway tiles): more grout joints โ more joints to maintain, more risk of water ingress if grout is not adequately sealed. Small format tiles can accommodate a curved or uneven substrate more easily. Porcelain (fully vitrified): the preferred material for bathroom floors and walls โ low water absorption (less than 0.5%), extremely durable, does not need sealing, suitable for underfloor heating. Natural stone (marble, limestone, slate): attractive but requires regular sealing (annually in a bathroom); some natural stones (particularly sandstone and limestone) are prone to staining from limescale and cleaning products.
Grout selection: Standard cement-based grouts absorb water and can harbour mould if not sealed. Epoxy grout (two-part system) is harder wearing, stain-resistant, and requires no sealing โ recommended for shower floors and wet areas. Brands: Mapei Kerapoxy, Lithofin Epoxy Grout.
Bathroom Renovation Costs in London
Bathroom renovation costs in London (2024):
Like-for-like renovation (same layout, new suite, new tiles, new electrical and plumbing): Remove existing bathroom suite; retain existing floor, wall, and ceiling structure. Supply and fit new bath, WC, basin, and shower enclosure (mid-range suite). Tile floor and walls (mid-range porcelain tiles). New electrical work (new lighting, new fan, connection for new shower). Total typical cost: ยฃ5,000โยฃ9,000 including materials and labour.
Full renovation (same layout, full strip-out to structure, new everything): Strip out to structural walls and floor. New plasterboard or cement board to all walls. New screed or board floor substrate. New suite, fully integrated shower. Tiling to ceiling height on all wet walls, floor tiling. New extractor fan with outside duct. New electrical work. Total typical cost: ยฃ8,000โยฃ14,000.
Wet room conversion (creating a level-access wet room from a traditional bathroom): Full strip-out; wet room floor construction (Wedi or timber joist upgrade); tanking; linear drain installation; large format floor tiles with fall; wall tiling to full height; suite with wall-hung WC (concealed cistern) and wall-mounted basin. Total typical cost: ยฃ12,000โยฃ22,000 depending on size and specification.
New en-suite in a loft conversion or extension: Creating a new bathroom from scratch โ new partitioning, new plumbing from the existing waste stack, new electrical circuit, new ventilation duct, full suite and tiling. Total typical cost: ยฃ8,000โยฃ16,000 depending on size, access, and specification.
High-specification bathroom: Premium materials (natural stone tiles, freestanding bath, wall-mounted taps, LED mirror cabinet, heated towel rail, underfloor heating), bespoke joinery, full wet room. Total typical cost: ยฃ18,000โยฃ35,000+.
Project sequencing: The correct sequence for a bathroom renovation is: Strip out โ structural/plasterboard โ first fix plumbing and electrical โ tanking and waterproofing โ floor substrate and screed (allow 28 days drying for a 50mm sand-cement screed; 24โ48 hours for self-levelling compounds) โ tiling (floor and walls) โ grout and silicone โ suite installation โ second fix electrical (lights, fan, heated towel rail) โ mirrors and accessories โ final clean.
Frequently Asked Questions
My grout keeps going mouldy in the shower. What is the solution?โผ
Can I tile over existing tiles in my bathroom?โผ
How long does a bathroom renovation take?โผ
Do I need planning permission to add a new bathroom?โผ
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. rcbGroup offers free initial consultations โ book your free survey.
Was this guide helpful? Share it:
Have a question about your project?
Chat with us on WhatsApp โ Faith usually replies within the hour.