Contents
Chimney Breast Removal: Structural Requirements
REMOVING A CHIMNEY BREAST — THE PROJECTION OF THE BRICK CHIMNEY STRUCTURE INTO THE ROOM ON EACH FLOOR — IS ONE OF THE MOST COMMON STRUCTURAL ALTERATIONS IN LONDON VICTORIAN TERRACE RENOVATIONS, TYPICALLY MOTIVATED BY THE DESIRE TO GAIN FLOOR SPACE IN A SMALL VICTORIAN RECEPTION ROOM OR BEDROOM.
CHIMNEY BREAST REMOVAL — KEY STRUCTURAL PRINCIPLE: THE CHIMNEY BREAST IS A MAJOR STRUCTURAL ELEMENT OF THE VICTORIAN TERRACE — IT IS NOT SIMPLY AN INTERNAL WALL — IT BEARS THE LOAD OF THE CHIMNEY STACK ABOVE AND PROVIDES LATERAL STABILITY TO THE PARTY WALLS ON EACH SIDE. REMOVING A CHIMNEY BREAST ON ONE FLOOR WITHOUT PROPER STRUCTURAL SUPPORT FOR THE CHIMNEY BREAST ON THE FLOORS ABOVE IS THE MOST FREQUENTLY MISEXECUTED STRUCTURAL ALTERATION IN LONDON VICTORIAN TERRACES — IMPROPER REMOVAL CAN RESULT IN CRACKING AND FAILURE OF THE CHIMNEY BREAST STRUCTURE ON THE FLOORS ABOVE. STRUCTURAL ENGINEER INPUT (MANDATORY — CHIMNEY BREAST REMOVAL REQUIRES A STRUCTURAL ENGINEER TO DESIGN AND SPECIFY THE SUPPORT STRUCTURE FOR THE OVERHANGING CHIMNEY BREAST AND STACK ABOVE — THE BUILDING REGULATIONS REQUIRE STRUCTURAL CALCULATIONS FOR ANY REMOVAL OF A LOAD-BEARING ELEMENT — TYPICALLY SUBMITTED AS PART OF A FULL PLANS BUILDING REGULATIONS APPLICATION OR AS A STRUCTURAL METHOD STATEMENT WITH THE BUILDING NOTICE). RSJ OR STEEL BEAM SUPPORT (THE STANDARD SUPPORT METHOD FOR AN OVERHANGING CHIMNEY BREAST): WHERE THE CHIMNEY BREAST IS REMOVED ON THE GROUND FLOOR BUT RETAINED ON THE FIRST FLOOR AND ABOVE — THE GROUND FLOOR CHIMNEY BREAST REMOVAL REQUIRES A STEEL BEAM (TYPICALLY A UB — UNIVERSAL BEAM — UC — UNIVERSAL COLUMN — OR RSJ — ROLLED STEEL JOE — THE COLLOQUIAL UK TERM FOR A STEEL BEAM — IN STRUCTURAL ENGINEERING AN I-SECTION BEAM) TO SUPPORT THE OVERHANGING CHIMNEY BREAST ABOVE. TYPICAL BEAM SPECIFICATION: UB 152X89X16 (UB = UNIVERSAL BEAM — 152MM DEEP X 89MM WIDE X 16KG/METRE — S275 STEEL — THE SMALLEST STANDARD BEAM SUFFICIENT FOR A STANDARD VICTORIAN TERRACE GROUND-FLOOR CHIMNEY BREAST REMOVAL WHERE THE SPAN IS 1.5-2.0M AND THE LOAD IS THE FIRST-FLOOR CHIMNEY BREAST AND STACK ABOVE) TO UB 203X133X25 (HEAVIER — FOR LARGER SPAN OR STACK WEIGHT) — THE EXACT SPECIFICATION IS DETERMINED BY THE STRUCTURAL ENGINEER BASED ON SPAN, LOAD, AND BEARING CONDITIONS.
Party Wall Considerations for Chimney Breast Removal
CHIMNEY BREAST REMOVAL IN A LONDON VICTORIAN TERRACE RAISES COMPLEX PARTY WALL ACT 1996 ISSUES WHEN THE CHIMNEY BREAST CONCERNED IS ON OR ADJACENT TO A PARTY WALL — AS IS TYPICALLY THE CASE IN A TERRACE WHERE THE CHIMNEY BREAST PROJECTION ON ONE SIDE OF THE RECEPTION ROOM OR BEDROOM OCCURS ON THE PARTY WALL SIDE OF THE HOUSE.
WHEN A PARTY WALL ACT NOTICE IS REQUIRED FOR CHIMNEY BREAST REMOVAL: A CHIMNEY BREAST REMOVAL IS NOTIFIABLE UNDER THE PARTY WALL ETC ACT 1996 WHERE: (1) THE CHIMNEY BREAST BEING REMOVED IS A PARTY CHIMNEY (I.E., THE CHIMNEY STRUCTURE STRADDLES THE PARTY WALL BETWEEN YOUR PROPERTY AND THE ADJOINING PROPERTY — IN A MID-TERRACE, CHIMNEY BREASTS ARE OFTEN ATTACHED TO THE PARTY WALL OR ARE PARTY STRUCTURES SHARED BETWEEN ADJOINING PROPERTIES — THE SAME CHIMNEY BREAST MAY CONTAIN FLUES BELONGING TO BOTH PROPERTIES); (2) REMOVING THE CHIMNEY BREAST REQUIRES CUTTING INTO A PARTY WALL OR REMOVING ANY PART OF A PARTY CHIMNEY (A CHIMNEY STACK THAT STRADDLES THE PARTY WALL IS A PARTY CHIMNEY — PARTY WALL ACT 1996 SECTION 2(2)(F): A BUILDING OWNER MAY PULL DOWN AND REBUILD A PARTY CHIMNEY — BUT MUST SERVE A SECTION 2 NOTICE). WHAT TO CHECK: BEFORE REMOVING A CHIMNEY BREAST ON THE PARTY WALL SIDE OF A VICTORIAN TERRACE, CHECK: (A) WHETHER THE CHIMNEY BREAST AND STACK BELONG ENTIRELY TO YOUR PROPERTY OR ARE SHARED WITH THE ADJOINING OWNER — EXAMINE THE TITLE DEEDS AND INSPECT WHICH PROPERTY'S FLUES ARE CONTAINED WITHIN THE STRUCTURE; (B) WHETHER ANY CUTTING INTO OR REMOVAL OF PART OF THE CHIMNEY WILL AFFECT THE PARTY WALL — IF YES, SERVE A SECTION 2 PARTY WALL NOTICE MINIMUM 2 MONTHS BEFORE WORK BEGINS. SHARED CHIMNEY STACKS: IN MANY LONDON VICTORIAN TERRACES, A SINGLE CHIMNEY STACK PROJECTS ABOVE THE PARTY WALL BETWEEN TWO PROPERTIES — THE STACK CONTAINS FLUES FROM BOTH PROPERTIES — THIS MAKES THE STACK A PARTY CHIMNEY STRUCTURE — ANY WORK TO THAT STACK (REPOINTING, FLAUNCHING REPAIR, POT REPLACEMENT) REQUIRES A SECTION 2 PARTY WALL NOTICE IF THE WORK GOES BEYOND DECORATIVE REPAIR.
Chimney Stack Repair: Repointing, Flaunching, and Flashing
THE EXTERNAL CHIMNEY STACK OF A LONDON VICTORIAN TERRACE IS ONE OF THE MOST EXPOSED AND WEATHER-VULNERABLE PARTS OF THE BUILDING — PROTRUDING ABOVE THE ROOFLINE AND EXPOSED TO WIND, RAIN, AND FROST FROM ALL FOUR SIDES. COMMON CHIMNEY STACK DEFECTS AND THEIR REPAIR.
FLAUNCHING FAILURE (THE FLAUNCHING IS THE MORTAR SURROUND AT THE BASE OF EACH CHIMNEY POT ON TOP OF THE STACK — A BEVELLED OR ROUNDED MORTAR BED THAT LOCKS EACH CHIMNEY POT IN POSITION AND SHEDS RAINWATER AWAY FROM THE TOP SURFACE OF THE STACK): MOST ORIGINAL VICTORIAN CHIMNEY FLAUNCHING WAS SAND-CEMENT OPC MORTAR — AFTER 100+ YEARS OF FREEZE-THAW CYCLING, THE FLAUNCHING CRACKS AND SPALLS — ALLOWING WATER INGRESS BEHIND THE POTS, INTO THE MORTAR, AND DOWN THE FLUE — CAUSING INTERNAL STAINING AND DAMP. REPAIR: RAKE OUT AND REMOVE FAILED FLAUNCHING — CLEAN STACK TOP SURFACE — RE-FLAUNCHING IN ST ASTIER NHL 3.5 1:2.5 SHARP SAND MORTAR (LIME FLAUNCHING — PREFERRED FOR A LIME-BUILT STACK — SLIGHTLY LESS BRITTLE THAN OPC FLAUNCHING AND MORE DURABLE IN FREEZE-THAW CONDITIONS — ALTERNATIVE: HIGH-IMPACT RENDER SYSTEM OR BRUSHED ONTO THE SURFACE CHIMNEY FLAUNCHING SEALANT); REPOINTING (THE MORTAR JOINTS OF THE EXPOSED BRICK CHIMNEY STACK REQUIRE REPOINTING WHERE THE ORIGINAL MORTAR HAS ERODED OR CRACKED — SEE HERITAGE POINTING GUIDE — ST ASTIER NHL 3.5 1:2.5 SHARP SAND MORTAR IS THE CORRECT SPECIFICATION FOR LONDON STOCK BRICK CHIMNEY STACKS — NOT OPC MORTAR WHICH TRAPS MOISTURE AND CAN CAUSE BRICK SPALLING); LEAD FLASHING REPAIR (THE LEAD FLASHING AT THE JUNCTION BETWEEN THE CHIMNEY STACK AND THE ROOF SLOPE — THE LEAD FLASHING PREVENTS RAINWATER FROM PENETRATING THE ROOF/STACK JUNCTION): ORIGINAL VICTORIAN LEAD FLASHING WAS STEP FLASHING (A SERIES OF LEAD SOAKERS TUCKED INTO THE MORTAR JOINTS OF THE CHIMNEY BRICK COURSES AT THE SAME ANGLE AS THE RAFTER PITCH — WITH A CONTINUOUS LEAD COVER FLASHING OVER THE TOP). LEAD FLASHING FAILURE (CRACKED, LIFTED, OR MISSING LEAD FLASHING): REPAIR USING LEAD CODE 4 (LEAD SHEET BS EN 12588:2006 — CODE 4 = 1.80MM THICK — STANDARD FOR ROOF FLASHING) — RE-STEP FLASHING INTO RAKED-OUT MORTAR JOINTS OF THE STACK COURSE BY COURSE — SEAL JOINTS WITH LEAD LOCK SEALANT OR LEAD WEDGES AND REPOINT WITH NHL MORTAR.
Chimney Closure and Ventilation
MOST CHIMNEY FLUES IN LONDON VICTORIAN TERRACES ARE NO LONGER IN ACTIVE USE — COAL FIRES WERE THE PRIMARY HEATING SOURCE UNTIL THE 1960S (WHEN CENTRAL HEATING BECAME WIDESPREAD) AND THE CLEAN AIR ACT 1956 BEGAN TO REDUCE OPEN-FIRE COAL BURNING IN LONDON. AN UNUSED BUT OPEN CHIMNEY FLUE CREATES CONTINUOUS HEAT LOSS AND COLD DRAUGHTS FROM THE OPEN FLUE TOP.
CHIMNEY CLOSURE OPTIONS: (1) POT CLOSURE — CAPPING OR COVERING THE CHIMNEY POTS AT THE STACK TOP WITH APPROVED POT COVERS (CHIMNEY POT COVERS — AVAILABLE FROM TERMINAL PRODUCTS — ALLOW VENTILATION WHILE PREVENTING RAIN AND BIRD ENTRY — THE VENT IS IMPORTANT BECAUSE SEALING A FLUE COMPLETELY WITHOUT VENTILATION CAN CAUSE CONDENSATION WITHIN THE FLUE AND DAMP PENETRATION THROUGH THE CHIMNEY BREAST); (2) INTERNAL BALLOON (CHIMNEY DRAUGHT EXCLUDER — A BALLOON OF POLYETHYLENE OR SILICONE — INFLATED INSIDE THE FLUE NEAR THE FIREPLACE OPENING — SEALS THE FLUE INTERNALLY — PREVENTS COLD AIR DOWNDRAUGHT — DOES NOT PREVENT HEAT LOSS ABOVE THE BALLOON FROM THE EXPOSED FLUE — THE BALLOON MUST BE DEFLATED BEFORE LIGHTING ANY FIRE); (3) VENTILATED REGISTER PLATE (A THIN STEEL PLATE FITTED ACROSS THE FIREPLACE OPENING AT THE THROAT OF THE CHIMNEY — WITH A VENTILATION GRILLE TO COMPLY WITH PART F REQUIREMENTS — A VENTILATED REGISTER PLATE IS THE BUILDING REGULATIONS-COMPLIANT METHOD FOR CLOSING OFF AN UNUSED FIREPLACE OPENING IN A HABITABLE ROOM — BUILDING REGULATIONS APPROVED DOCUMENT F 2021 REQUIRES THAT PERMANENTLY CLOSED FLUES IN HABITABLE ROOMS HAVE A VENTILATION AREA OF AT LEAST 500MM² EA — THE MINIMUM VENTILATED REGISTER PLATE PROVIDES THIS). PARGE COAT FAILURE (THE PARGE COAT IS THE LIME RENDER APPLIED TO THE INSIDE OF THE CHIMNEY FLUE TO SEAL THE JOINTS AND PROVIDE A SMOOTH INTERNAL SURFACE FOR DRAUGHT): FAILED PARGE COAT (FALLEN, CRACKED, OR MISSING LIME RENDER ON THE FLUE INTERNAL WALLS) IS A VERY COMMON DEFECT — ALLOWING SMOKE AND COMBUSTION GAS TO PENETRATE THE ADJACENT WALL STRUCTURE — AND CAUSING STAINING THROUGH THE PARTY WALL INTO THE NEIGHBOUR'S PROPERTY. GAS FLUE LINER: WHERE THE FLUE IS TO BE USED FOR A GAS FIRE OR GAS APPLIANCE, A RIGID OR FLEXIBLE GAS-RATED STAINLESS STEEL LINER (TYPICALLY 125MM OR 150MM DIAMETER — GAS SAFE REGISTERED INSTALLER REQUIRED FOR GAS FLUE INSTALLATIONS) MUST BE INSTALLED.
Chimney Costs in London
CHIMNEY REPAIR AND REMOVAL COSTS (LONDON 2025 — BUILDER/MASON — SCAFFOLD REQUIRED FOR CHIMNEY STACK WORK — APPROXIMATE RANGE).
CHIMNEY BREAST REMOVAL (ONE FLOOR — GROUND FLOOR CHIMNEY BREAST REMOVAL — INCLUDING STEEL BEAM SUPPLY AND FIT, NEEDLE AND PROP TEMPORARY SUPPORT, STRUCTURAL ENGINEER DRAWINGS, BUILDING REGULATIONS NOTICE, DEBRIS REMOVAL — LONDON 2025): APPROXIMATELY £2,500-5,000 PER FLOOR (TYPICAL RANGE FOR A STANDARD VICTORIAN TERRACE GROUND-FLOOR CHIMNEY BREAST REMOVAL USING A UB 152X89X16 OR UB 203X133X25 STEEL BEAM — DOES NOT INCLUDE PARTY WALL SURVEYOR COSTS). CHIMNEY BREAST REMOVAL (TWO FLOORS — GROUND AND FIRST — MORE COMPLEX — REQUIRES PHASED STRUCTURAL REMOVAL AND TWO STEEL BEAMS): APPROXIMATELY £5,500-10,000 (TWO-FLOOR REMOVAL — BOTH FLOORS TOGETHER IN A SINGLE CONTRACT — MORE EFFICIENT THAN DOING EACH FLOOR SEPARATELY). CHIMNEY STACK REPOINTING (LIME MORTAR — ALL FOUR SIDES — ACCESS VIA SCAFFOLD): APPROXIMATELY £600-1,500 (DEPENDING ON STACK SIZE AND DEGREE OF MORTAR DETERIORATION). FLAUNCHING REPAIR (REMOVE OLD FLAUNCHING + RE-FLAUNCHING IN NHL 3.5 1:2.5 SHARP SAND — PER STACK): APPROXIMATELY £400-800 (TYPICALLY COMBINED WITH REPOINTING — COMBINED REPOINT + REFLAUNCHING: £800-2,000). LEAD FLASHING REPAIR (STEP FLASHING — CODE 4 LEAD — REAR SLOPE — PER STACK): APPROXIMATELY £500-1,200. SCAFFOLD (4-WEEK HIRE — CHIMNEY STACK ONLY — TYPICAL LONDON 3-STOREY TERRACE): APPROXIMATELY £800-1,500. FULL CHIMNEY REPAIR PACKAGE (REPOINTING + FLAUNCHING + LEAD FLASHING REPAIR — ONE STACK — INCLUDING SCAFFOLD): APPROXIMATELY £2,000-4,500 ALL-IN. PARTY WALL SURVEYOR (SECTION 2 NOTICE — CHIMNEY BREAST REMOVAL AFFECTING PARTY CHIMNEY — BOTH SIDES): APPROXIMATELY £1,200-3,000. BUILDING REGULATIONS (CHIMNEY BREAST REMOVAL — FULL PLANS APPLICATION): APPROXIMATELY £200-300 LOCAL AUTHORITY FEE.
Frequently Asked Questions
Do I need a structural engineer to remove a chimney breast?▼
Does removing a chimney breast need a Party Wall Notice?▼
Why is my chimney breast damp and what causes chimney damp?▼
How do I repair chimney flashing?▼
How much does chimney breast removal cost in London?▼
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.