⭐ 9.96/10 Checkatrade · 114+ Reviews
📞 07359 872594
Extensions2 min read

Home Extension Costs in London in 2025: Single Storey, Double Storey, Side Return, and Wrap-Around

HOME EXTENSION COSTS in London in 2025 are among the most searched questions on any renovation topic — and among the most inaccurately answered, because the headline figures quoted on most websites and comparison tools are based on national averages from 2018-2021 surveys that do not reflect LONDON LABOUR RATES, CURRENT MATERIALS COSTS, LONDON-SPECIFIC COMPLIANCE COSTS (party wall surveyor fees, Thames Water build-over applications, conservation area planning costs), or the REAL COST OF DOING THE FULL JOB PROPERLY. This guide provides REALISTIC LONDON HOME EXTENSION COSTS FOR 2025 — based on market conditions in Greater London, with FULL BREAKDOWNS of what each cost band includes, COST PER M² OF EXTENSION FLOOR AREA, KEY COST DRIVERS, and WHAT IS AND IS NOT INCLUDED in the typical contract price. The guide covers: SINGLE-STOREY REAR EXTENSION, DOUBLE-STOREY EXTENSION, SIDE RETURN EXTENSION, WRAP-AROUND EXTENSION, WHAT IS NOT INCLUDED IN QUOTED PRICES, and HOW TO READ AND COMPARE EXTENSION QUOTATIONS.

Key Takeaways

  • Single-storey rear extension and side return costs in London 2025: SINGLE-STOREY REAR EXTENSION TOTAL PROJECT COST (INCLUDING ALL FEES): small (9-12m²): £50,000-£75,000; medium (16-20m²): £70,000-£110,000; large (25-36m²): £100,000-£160,000; BUILD COST PER M² (EXCLUDING FEES, KITCHEN, FLOORS): budget: £2,500-£3,500/m²; mid-range: £3,500-£5,000/m²; high-spec: £5,000-£7,500/m²; FULL TRADE BREAKDOWN (4M×4M=16M² MID-RANGE): professional fees £6,000-£13,000; enabling/demolition £2,000-£6,000; foundations £5,000-£15,000; drainage £2,000-£6,000; structural steel (RSJ + padstones) £2,500-£6,000; external walls (brick/block cavity) £6,000-£15,000; flat roof (structure + GRP/EPDM waterproofing + lantern/rooflights) £8,000-£18,000; external doors/windows (bifold/aluminium) £5,000-£15,000; insulation £2,000-£5,000; floor slab + DPM £2,000-£5,000; first fix M&E £3,000-£7,500; plastering + decoration £4,000-£9,000; second fix M&E £1,000-£2,500; contingency 10%: £5,000-£10,000; SIDE RETURN (INFILL ONLY): £25,000-£50,000; COMBINED REAR + SIDE RETURN: £70,000-£130,000; side return rooflight (full-length): £3,000-£8,000.
  • Double-storey and wrap-around extension costs, professional fees, and what is excluded in London 2025: DOUBLE-STOREY REAR EXTENSION (TOTAL PROJECT COST): standard spec: £80,000-£130,000; high spec: £120,000-£200,000+; cost per m² (total new floor area): £3,000-£5,000 standard; £5,000-£8,000 high spec; typically requires full planning permission; additional costs vs single-storey: first floor structure; first floor windows; more complex party wall process (Sections 2 and 6); WRAP-AROUND EXTENSION (COMBINED REAR + FULL SIDE RETURN): build cost: £90,000-£170,000; total with fees and kitchen: £120,000-£220,000+; PROFESSIONAL FEES (WRAP-AROUND): architect £4,000-£8,000; SE £1,200-£3,500; party wall (multiple notices) £2,000-£6,000; BC £600-£1,500; planning £258 + DAS; TOTAL PROFESSIONAL FEES: £8,000-£20,000; WHAT IS NOT INCLUDED IN BUILD CONTRACT: professional fees; kitchen fit-out; floor finishes (add £40-£120/m²); decoration (check scope); garden reinstatement (add £2,000-£10,000+); extra skips (London: £200-£350/8-yard skip + excavated clay disposal costs); contingency (10-15% of build cost).
  • How to read extension quotations and control extension costs in London 2025: STANDARDISE SCOPE BEFORE COMPARING QUOTATIONS: ask all contractors to price from identical architect's schedule of works; a quote without a schedule is meaningless; CONFIRM WHAT IS INCLUDED: professional fees; kitchen; floor coverings; decoration; garden reinstatement; number of skips; ELEMENTAL BREAKDOWN: ask for trade-by-trade breakdown (foundations, roof, doors/windows, M&E, plastering) to identify genuine differences in specification; RED FLAGS ON LOW TENDER: 30-40% cheaper than competitors usually means: lower specification assumed; items excluded; buying the work intending to increase via variations; VARIATION CONTROL: specify everything before signing contract; sign a JCT Minor Works or equivalent fixed-price contract with clear variation procedure; every post-contract change costs premium; RETENTION: 2.5-5% holdback for 6 months after practical completion (covers defects rectification); ASSOCIATED WORKS BUDGET: consumer unit upgrade + existing electrical inspection: £1,500-£5,000; internal refurbishment of adjoining rooms (plastering, skirting, doors, decoration): £5,000-£15,000; CONTINGENCY: 10-15% of build cost strongly recommended for Victorian terrace foundation surprises (made-up ground, buried services, soft spots in London Clay); COST PER M² ACCURACY: most reliable for 15-25m² extensions; small extensions (<12m²) will have higher cost/m² due to fixed cost proportion; large extensions (>30m²) will have lower cost/m².

Single-storey rear extension costs, double-storey extension costs, and side return costs in London 2025

Realistic costs for single-storey rear extensions, double-storey extensions, and side return extensions in London in 2025 — full breakdowns by trade and element, cost per m², and what is included: IMPORTANT PREFATORY NOTE ON EXTENSION COST ACCURACY: the figures in this guide are stated in Q3 2025 LONDON MARKET PRICES; they reflect: current material prices (steel, timber, concrete, brickwork, render, roofing, glazing — all significantly higher in London 2025 than 2021 national averages); LONDON LABOUR RATES (Inner London: Islington, Hackney, Camden, Lambeth, Southwark — labour approximately 25-40% above national average; Inner-Outer London: Ealing, Wandsworth, Lewisham — approximately 15-25% above; Outer London: Bromley, Sutton, Havering, Enfield — approximately 5-15% above); TYPICAL PROJECT SCOPE includes: all structural works (foundations, structural steel, walls, roof); external envelope complete (external doors and windows); internal first fix (plumbing, electrics, insulation, screeding); internal second fix (boarding, plastering, decoration); excludes: KITCHEN FIT-OUT (separate allowance), FLOOR FINISHES (separate allowance), FURNITURE AND SOFT FURNISHINGS; ALL PROFESSIONAL AND DESIGN FEES (architect, structural engineer, party wall surveyor, Building Control) are QUOTED SEPARATELY; SINGLE-STOREY REAR EXTENSION — LONDON 2025 COSTS: WHAT IS A SINGLE-STOREY REAR EXTENSION: a ground floor extension to the rear of the property, extending the footprint of the house into the garden; typical dimensions: 3.0m-6.0m depth × 3.5m-6.0m width; most commonly extending the kitchen or creating a new open-plan kitchen-dining-living space; INTERNAL FLOOR AREA RANGE: typically 10m²-36m² (3×3 = 9m²; 6×6 = 36m²); COST RANGE FOR A TYPICAL LONDON SINGLE-STOREY REAR EXTENSION (4M DEEP × 4M WIDE = 16M² EXTENSION): BUDGET TO MID-RANGE (STANDARD MATERIAL SPECIFICATION — CAVITY BRICK/BLOCK WALLS, FLAT WARM ROOF WITH SOLID POLYCARBONATE ROOFLIGHT OR SINGLE VELUX, BIFOLD OR SLIDING ALUMINIUM DOORS, STANDARD SCREED FLOOR): approximately £55,000-£80,000 for the extension structure (excluding professional fees, kitchen, and floor finishes); MID-RANGE TO HIGH SPECIFICATION (BRICK-CLAD CAVITY WALLS, STANDING SEAM ZINC OR POWDER-COATED ALUMINIUM ROOF CLADDING, LARGE ROOF LANTERN OR MULTI-PANE FLAT ROOF GLAZING, HIGH-END BIFOLD OR SLIDE-AND-FOLD DOOR SYSTEM): approximately £75,000-£120,000 for the extension structure; COST PER M² OF EXTENSION FLOOR AREA (LONDON 2025 — SINGLE-STOREY): budget: approximately £2,500-£3,500/m²; mid-range: approximately £3,500-£5,000/m²; high specification: approximately £5,000-£7,500/m²; WHY COST PER M² IS AN IMPRECISE GUIDE: the FIXED COSTS of a small extension (mobilisation, scaffold, foundations, drainage connections, structural opening and steel beam, Planning fees) are approximately the same whether the extension is 12m² or 24m² — so the COST PER M² OF A SMALL EXTENSION IS MUCH HIGHER than a larger one (the fixed costs are spread over fewer m²); conversely, a 36m² extension has much lower cost per m² because the fixed costs are spread over a larger floor area; the quoted cost per m² is most reliable as a benchmark for extensions of approximately 15-25m²; FULL COST BREAKDOWN (SINGLE-STOREY REAR EXTENSION — TYPICAL 4M×4M = 16M² — LONDON 2025): PROFESSIONAL FEES (DESIGN + PLANNING + PARTY WALL + BC — SEPARATE FROM BUILD CONTRACT): architect drawings (planning and BC): £3,000-£6,000; structural engineer: £800-£2,500; party wall surveyor (2 neighbours — both sides typical Victorian terrace): £1,500-£4,000 if dispute; Building Control full plans application: £400-£1,000; TOTAL PROFESSIONAL FEES: approximately £6,000-£13,000; BUILD CONTRACT (CONTRACTOR COSTS — INCLUDED IN MAIN CONTRACT PRICE): ENABLING AND DEMOLITION (DEMOLISHING EXISTING REAR WALL, EXISTING REAR DRAIN RELOCATION, CUTTING OUT OPENINGS): £2,000-£6,000; EXCAVATION AND FOUNDATIONS (STRIP OR PAD FOUNDATIONS — TYPICALLY 1.2-1.5M DEEP IN LONDON CLAY — WITH BORED PILING IF NEAR TREES): £5,000-£15,000; DRAINAGE (NEW GROUND FLOOR DRAINAGE RUNS TO EXISTING STACK OR NEW GULLY; SURFACE WATER DRAINAGE — SOAKAWAY OR CONNECTION TO DRAIN): £2,000-£6,000; STRUCTURAL STEEL (RSJ BEAM FOR REAR WALL OPENING — TYPICALLY 152-305MM UB; PADSTONES; PROPPING DURING INSTALLATION): £2,500-£6,000; EXTERNAL WALLS (CAVITY BRICK/BLOCK CONSTRUCTION TO WALL PLATE HEIGHT — LABOUR AND MATERIALS): £6,000-£15,000 (depends on wall height and wall length); FLAT ROOF STRUCTURE AND WATERPROOFING (INSULATED FLAT ROOF ON TIMBER JOISTS — GRP FIBREGLASS OR EPDM WATERPROOFING — ROOF LANTERN OR VELUX ROOFLIGHT INCLUDED): £8,000-£18,000; EXTERNAL DOORS AND WINDOWS (BIFOLD OR ALUMINIUM SLIDING DOORS TO REAR — 3-5 PANELS; GLAZED SECTION IN SIDE WALL OR FIXED WINDOW): £5,000-£15,000 (aluminium mid-range specification); INTERNAL INSULATION (WALL INSULATION TO CURRENT PART L STANDARDS; FLOOR INSULATION UNDER SCREED): £2,000-£5,000; CONCRETE FLOOR SLAB WITH DPM (GROUND-BEARING SLAB ON HARDCORE WITH DPM AND POWER-FLOAT FINISH): £2,000-£5,000; FIRST FIX PLUMBING (DRAINAGE AND WATER SUPPLY TO NEW UTILITY OR KITCHEN): £1,500-£4,000; FIRST FIX ELECTRICS (PART P CABLES, CONSUMER UNIT UPGRADE WHERE REQUIRED, DISTRIBUTION TO NEW ZONE): £1,500-£3,500; INTERNAL PLASTERBOARDING, SKIMMING, AND DECORATION: £4,000-£9,000; SECOND FIX ELECTRICS + PLUMBING: £1,000-£2,500; CONTINGENCY (10% — STRONGLY RECOMMENDED FOR LONDON VICTORIAN TERRACE EXTENSIONS): £5,000-£10,000; TOTAL BUILD CONTRACT (INCLUDING 10% CONTINGENCY — SINGLE-STOREY REAR EXTENSION 4M×4M — STANDARD-TO-MID SPECIFICATION): approximately £55,000-£90,000; DOUBLE-STOREY EXTENSION — LONDON 2025 COSTS: WHAT IS A DOUBLE-STOREY EXTENSION: an extension that adds two floors of new space (ground floor and first floor) to the rear or side of the property; almost always requires FULL PLANNING PERMISSION (PD rights for a two-storey rear extension are very limited — the extension must be within 3m of the rear wall and at least 7m from the rear boundary, which most London Victorian terraces cannot meet); DOUBLE-STOREY REAR EXTENSION COST RANGE (LONDON 2025 — TYPICAL 3M DEEP × 4M WIDE = 12M² PER FLOOR = 24M² TOTAL NEW FLOOR AREA): approximately £80,000-£130,000 (standard specification); approximately £120,000-£200,000+ (high specification — render cladding, high-end windows, roof terrace to first floor extension); COST PER M² (TOTAL NEW FLOOR AREA — LONDON 2025): approximately £3,000-£5,000/m² (standard); approximately £5,000-£8,000/m² (high specification); WHAT INCREASES THE COST OF A DOUBLE-STOREY EXTENSION: STRUCTURAL FRAME: the first floor of the extension must be structurally supported — typically by: CONCRETE BLOCK WALLS (standard residential) or STEEL FRAME (if large open spans or heavy loads are involved); the first floor structure adds cost versus a single-storey extension; FLOOR STRUCTURE TO FIRST FLOOR: a structural floor (typically 200mm solid concrete slab or engineered timber joists + 22mm chipboard decking) spanning between the extension walls; FIRST FLOOR WINDOWS: the first floor external walls require windows (adding cost vs a single-storey roof without windows); PARTY WALL FEES: a double-storey extension typically triggers BOTH SECTION 2 (work to party wall) AND SECTION 6 (excavation within 3m of neighbour's structure) Party Wall Act notices — increasing the cost and complexity of the party wall process; SIDE RETURN EXTENSION — LONDON 2025 COSTS: WHAT IS A SIDE RETURN EXTENSION: a SIDE RETURN is the NARROW PASSAGE that runs alongside the main body of the Victorian terrace (typically 0.8m-1.5m wide, between the side of the house and the boundary wall); it connects the rear garden to the front of the property; infilling this side return with a new extension adds approximately 5-12m² of floor area to the ground floor, typically widening the kitchen by the width of the side return passage; SIDE RETURN EXTENSION COST RANGE (LONDON 2025 — TYPICAL 4M LONG × 1M WIDE = 4M² SIDE RETURN INFILL): approximately £25,000-£50,000 (side return only — typically combined with the rear extension as a COMBINED REAR AND SIDE RETURN project); COMBINED REAR AND SIDE RETURN (THE MOST COMMON LONDON KITCHEN EXTENSION FORMAT): approximately £70,000-£130,000 for a 5m-deep rear extension plus full side return infill (total floor area approximately 25-35m²); the side return rooflights (typically a FRAMELESS ROOFLIGHT OVER THE SIDE RETURN to bring light into the extended kitchen) are a significant cost element: approximately £3,000-£8,000 for a full-length side return rooflight (aluminium-framed walk-on glazing or pitched polycarbonate glazing).

Wrap-around extension costs, what is not included, reading quotations, and cost control in London 2025

Wrap-around extension costs, what is excluded from typical extension quotations, how to read and compare quotations, and cost control strategies for London home extensions in 2025: WRAP-AROUND EXTENSION (COMBINED REAR AND SIDE EXTENSION — FULL WRAP) — LONDON 2025 COSTS: WHAT IS A WRAP-AROUND EXTENSION: a wrap-around extension combines a FULL-WIDTH REAR EXTENSION with a FULL SIDE RETURN INFILL, creating a continuous new floor area that wraps around the rear and one side of the property; for a typical Victorian terrace: the ground floor footprint is significantly increased; the new floor area is typically 30-50m² (the largest single-storey extension possible within the property boundaries); the kitchen is typically relocated into the new full-width open-plan rear space; a LARGE ROOF LANTERN or MULTIPLE ROOFLIGHTS over the new extension bring natural light deep into the plan; FULL WRAP-AROUND EXTENSION COST RANGE (LONDON 2025): approximately £90,000-£170,000 for the build (excluding professional fees and kitchen fit-out); WHAT DRIVES THE WIDE RANGE: SIZE OF THE WRAP (depth of the rear extension × total width including side return); SPECIFICATION OF THE ROOF GLAZING (a large frameless rooflight or a complex roof lantern can cost £8,000-£30,000 for the glazing element alone); EXTERNAL CLADDING SPECIFICATION (brick-clad to match existing — standard cost; zinc or copper cladding — premium; rendered — medium cost); BIFOLD OR SLIDING DOOR SYSTEM SPECIFICATION (standard aluminium bifold — £5,000-£12,000 for a 4-panel system; premium lift-and-slide aluminium — £8,000-£20,000 for the same opening width); WHETHER THE PROJECT INCLUDES UNDERFLOOR HEATING IN SCREED (ADD £2,500-£5,000); INTERNAL SPECIFICATION (plaster direct to existing brick vs full boarding and skimming of the existing walls that are opened up); PROFESSIONAL FEES FOR A WRAP-AROUND EXTENSION (SEPARATE FROM BUILD CONTRACT): ARCHITECT (PLANNING AND BUILDING CONTROL DRAWINGS): £4,000-£8,000 (a wrap-around is typically larger and more complex than a simple single-storey rear extension — more drawing time, more coordination, often requires a design-and-build approach); STRUCTURAL ENGINEER (FOUNDATIONS, WALLS, ROOF STRUCTURE, STEEL BEAMS FOR OPENINGS): £1,200-£3,500; PARTY WALL SURVEYOR: because a wrap-around extension typically works along BOTH SIDE WALLS (one side wall is the party wall with the neighbour; the opposite side wall is at or near the garden boundary — typically a shared boundary with a rear neighbour), MULTIPLE PARTY WALL NOTICES may be required: a SECTION 2 NOTICE (for the work to the party wall side wall) to the SIDE NEIGHBOUR; a SECTION 6 NOTICE (for the foundations within 3m of the rear neighbour's property) to the REAR NEIGHBOUR; total party wall surveyor fees: £2,000-£6,000 (if both neighbours require surveyors); BUILDING CONTROL (FULL PLANS APPLICATION): £600-£1,500; PLANNING APPLICATION (FULL PLANNING PERMISSION TYPICALLY REQUIRED FOR A WRAP-AROUND — THE COMBINED SIDE AND REAR EXTENSION CHANGES THE MASSING OF THE PROPERTY): £258 (application fee) + architect's time for heritage/design statement if in a conservation area; TOTAL PROFESSIONAL FEES (WRAP-AROUND): approximately £8,000-£20,000; WHAT IS NOT INCLUDED IN A TYPICAL EXTENSION QUOTATION (AND WHAT YOU SHOULD CHECK BEFORE COMPARING): this is one of the most important sections of this guide — a QUOTATION THAT APPEARS CHEAP may simply have EXCLUDED the most expensive items; TYPICALLY EXCLUDED FROM LONDON EXTENSION BUILD CONTRACTS: PROFESSIONAL FEES: all of: architect fees, structural engineer fees, party wall surveyor fees, Building Control fees, Thames Water build-over application fees (if applicable) — typically NOT included in the build contract price; these may add £6,000-£20,000 to the total project cost; KITCHEN FIT-OUT: the kitchen units, worktop, appliances, and installation are almost always excluded from an extension build contract and are a separate specification and contract (add £5,000-£80,000+ depending on specification — see kitchen renovation guide); FLOOR FINISHES: the build contract typically ends at a SCREEDED FLOOR (or POWER-FLOATED CONCRETE SLAB) — the final floor covering (engineered wood, porcelain tiles, LVT) is a separate allowance (add £40-£120/m² for supply and install); DECORATION: internal painting and decorating may or may not be included; CHECK THE SCOPE CAREFULLY (some builders include 2-coat emulsion on walls and ceilings; others leave the room in plaster only and the client arranges their own decorator); EXTERNAL WORKS: reinstatement of the garden after construction (paving, lawn, planting) is typically not included in the build contract; in a rear extension, the construction traffic and storage will damage the garden — budget £2,000-£10,000+ for garden reinstatement depending on the size and specification; GARDEN WASTE REMOVAL BEYOND STANDARD SKIPS: large volumes of excavated material (London Clay from new foundations) generate SEVERAL SKIP LOADS of spoil; check the build contract to confirm how many skips are included and what the rate is for additional skips (London skip hire: approximately £200-£350 per 8-yard skip, plus tip charges for excavated material which is significantly more expensive to dispose of than general waste); CONTINGENCY: construction projects routinely encounter UNFORESEEN CONDITIONS — especially in Victorian terrace foundations (made-up ground, historic buried drainage, soft spots in London Clay, previous building activity); a CONTINGENCY of 10-15% of the build contract value is STRONGLY RECOMMENDED; HOW TO READ AND COMPARE EXTENSION QUOTATIONS: STANDARDISE THE SCOPE: ask all contractors to quote from the SAME SCOPE OF WORKS document (ideally prepared by the architect); a quotation without a schedule of works is almost meaningless — you cannot tell what is included or excluded; CONFIRM WHAT IS INCLUDED: specifically ask: are professional fees included?; is the kitchen included?; is the floor covering included?; is the decoration included?; is garden reinstatement included?; HOW MANY SKIPS ARE INCLUDED?; BREAKDOWN BY ELEMENT: ask for the ELEMENTAL BREAKDOWN (how much for foundations? how much for the flat roof? how much for the bifold doors?) — this allows you to compare like-for-like and identify where one quotation is cheaper (is it because the specification is lower, or because the contractor is more efficient?); LOW TENDER — RED FLAGS: a quotation that is significantly lower than the other quotations is usually lower because: the contractor has ASSUMED A SIMPLER SPECIFICATION than the others (e.g. cheaper bifold doors, thinner concrete, shallower foundations, lower-quality steel); the contractor has EXCLUDED ELEMENTS that others included; the contractor is BUYING THE WORK (pricing at below cost to secure the contract, intending to increase the cost later via VARIATIONS); a 10% difference in quotations between reputable contractors is normal; a 30-40% difference should prompt a detailed scope comparison and a very careful assessment of what the cheaper quotation has excluded or assumed; COST CONTROL FOR LONDON HOME EXTENSIONS: (1) DECIDE YOUR SPECIFICATION BEFORE INVITING QUOTATIONS: the most expensive change on a construction project is the change made AFTER THE CONTRACT IS SIGNED — a VARIATION INSTRUCTION (VI) changes the scope and is priced by the contractor at a rate that reflects their negotiating position once the project is underway; every significant specification decision (roof glazing type, external door specification, floor finish, wall materials, kitchen specification) should be made BEFORE THE BUILD CONTRACT IS SIGNED; (2) AGREE A FIXED-PRICE CONTRACT WITH A CLEAR VARIATION PROCEDURE: a JCT Minor Works Building Contract (or an equivalent simple fixed-price contract) sets out the original contract price, the process for authorising changes, and the mechanism for pricing variations; without a formal contract, cost escalation is uncontrolled; (3) RETAIN A BUILDER'S DEPOSIT HOLDBACK: a standard retention of 2.5-5% of the contract value is held back until the MAKING GOOD OF DEFECTS PERIOD has expired (typically 6 months after practical completion) and any snagging issues identified after completion have been rectified; (4) BUDGET SEPARATELY FOR ASSOCIATED WORKS: ELECTRICAL WORKS IN THE EXISTING PART OF THE HOUSE (the extension may trigger a consumer unit upgrade and an electrical inspection of the existing installation — costs: £1,500-£5,000); INTERNAL REFURBISHMENT OF THE ROOMS ADJOINING THE EXTENSION (the rooms that open onto the extension will typically need replastering, new skirting and doors, and redecoration — budget £5,000-£15,000 for the adjoining internal works).

Frequently Asked Questions

How much does a single-storey rear extension cost in London in 2025?
SINGLE-STOREY REAR EXTENSION COSTS IN LONDON IN 2025 — THE HONEST ANSWER: THE TOTAL PROJECT COST (EVERYTHING IN — DESIGN FEES, BUILD, PROFESSIONAL FEES) FOR A TYPICAL SINGLE-STOREY REAR EXTENSION ON A LONDON VICTORIAN TERRACE IN 2025: SMALL EXTENSION (3M DEEP × 3-4M WIDE — APPROXIMATELY 9-12M² NEW FLOOR AREA): total project cost approximately £50,000-£75,000; MEDIUM EXTENSION (4M DEEP × 4-5M WIDE — APPROXIMATELY 16-20M² NEW FLOOR AREA): total project cost approximately £70,000-£110,000; LARGE EXTENSION (5-6M DEEP × 5-6M WIDE — APPROXIMATELY 25-36M² NEW FLOOR AREA): total project cost approximately £100,000-£160,000; THESE FIGURES INCLUDE: professional fees (architect £3,000-£6,000; structural engineer £800-£2,500; party wall surveyor £1,500-£4,000 if dispute; Building Control £400-£1,000); full build cost (demolition, foundations, walls, roof, structural steel, drainage, first fix M&E, plastering, decoration); THE FIGURES EXCLUDE: kitchen fit-out (see kitchen renovation guide — add £5,000-£80,000+ depending on specification); floor finishes (add £40-£120/m²); furniture; garden reinstatement (add £2,000-£10,000+); contingency (10% of build cost is strongly recommended); THE MOST COMMON MISTAKES IN BUDGETING FOR A LONDON EXTENSION: (1) comparing a BUILDERS' QUOTE ONLY (which excludes professional fees) to the TOTAL BUDGET (which should include everything); (2) forgetting the contingency (unforeseen foundations, service diversions, and other surprises are VERY COMMON in Victorian terrace groundworks); (3) budgeting the kitchen out of the extension budget but then having the kitchen specification exceed the budget because it was not designed simultaneously; (4) not accounting for the INTERNAL REFURBISHMENT that the extension works will trigger in the adjoining rooms.
What is the cost per m² for a London home extension in 2025?
COST PER M² FOR A LONDON HOME EXTENSION IN 2025 — HOW TO USE AND NOT MISUSE THE FIGURE: THE LONDON EXTENSION COST PER M² (Q3 2025 — BUILD COST ONLY — EXCLUDING PROFESSIONAL FEES, KITCHEN, AND FLOOR FINISHES): SINGLE-STOREY REAR EXTENSION: budget specification: approximately £2,500-£3,500/m²; mid-range specification: approximately £3,500-£5,000/m²; high specification (premium glazing, specialist roofing, high-end external finish): approximately £5,000-£7,500/m²; DOUBLE-STOREY EXTENSION: budget to mid-range: approximately £3,000-£5,000/m² (of total new floor area); high specification: approximately £5,000-£8,000/m²; WHY COST PER M² IS AN IMPRECISE ESTIMATING TOOL: the cost per m² is most accurate for extensions of approximately 15-25m²; for SMALLER EXTENSIONS (<12m²): the fixed costs (mobilisation, scaffolding, foundations, structural steel, drainage) are a large proportion of the total — so the cost per m² is HIGHER (approximately £4,000-£7,000/m²) even for a standard specification; for LARGER EXTENSIONS (>30m²): the fixed costs are spread over more floor area — the cost per m² is LOWER (approximately £2,500-£4,000/m²) at standard specification; THE CORRECT APPROACH: use the cost per m² as a BROAD SANITY CHECK (if a quotation implies a cost per m² of £1,500 for a London extension, it has likely excluded significant items); then work with the ELEMENTAL BREAKDOWN to understand the actual scope of what is being offered; COSTS THAT ARE NOT PROPORTIONAL TO FLOOR AREA (AND THEREFORE MAKE COST PER M² MISLEADING): STRUCTURAL STEEL (a 3.5m wide opening at the rear requires approximately the same beam size whether the extension is 12m² or 36m²); BIFOLD DOORS (the door system cost depends on the opening width, not on the extension area); ROOF LANTERN (a 2m×1.2m roof lantern costs approximately the same regardless of the extension size); FOUNDATIONS (the cost per lm of foundation trench is fixed regardless of the extension area).

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.

Ready to Discuss Your Project?

Free site survey. No obligation. Covering all Greater London & M25.

📞 Call now💬 WhatsAppFree Quote