Contents
Why OPC Mortar Damages Victorian Brickwork
OPC MORTAR (ORDINARY PORTLAND CEMENT — PORTLAND CEMENT MORTAR, ALSO CALLED CEMENT MORTAR OR SAND-CEMENT MORTAR — THE MORTAR MADE BY MIXING ORDINARY PORTLAND CEMENT (OPC — BS EN 197-1) WITH WASHED SHARP SAND AND WATER — TYPICAL MIX 1:3 TO 1:6 CEMENT TO SAND) IS FUNDAMENTALLY INCOMPATIBLE WITH THE ORIGINAL YELLOW LONDON STOCK BRICK OF A VICTORIAN TERRACE — BECAUSE IT IS TOO HARD, TOO RIGID, TOO IMPERMEABLE, AND TOO SHRINKAGE-PRONE FOR USE WITH SOFT, POROUS, RELATIVELY WEAK HANDMADE VICTORIAN BRICKWORK.
THE HIERARCHY OF STRENGTH IN A HISTORIC MASONRY WALL (ALSO CALLED THE SACRIFICIAL JOINT PRINCIPLE): IN A CORRECTLY SPECIFIED AND CORRECTLY BUILT HISTORIC MASONRY WALL USING LIME MORTAR, THE MORTAR JOINT IS INTENTIONALLY WEAKER AND MORE POROUS THAN THE BRICK — THIS IS BY DESIGN — THE MORTAR JOINT IS THE SACRIFICIAL ELEMENT OF THE WALL — IT IS DESIGNED TO ABSORB AND RELEASE MOISTURE (BREATHING), ACCOMMODATE THERMAL AND MOISTURE MOVEMENT OF THE BRICK (THROUGH SLIGHT FLEXURAL DEFORMATION OF THE MORTAR), AND ERODE/CRACK BEFORE THE BRICK FACE ERODES OR CRACKS — THE DAMAGED MORTAR JOINT CAN THEN BE RAKED OUT AND REPOINTED WITHOUT DAMAGING THE BRICK — MAINTAINING THE LONG-TERM INTEGRITY OF THE ORIGINAL BRICK; YELLOW LONDON STOCK BRICK (COMPRESSIVE STRENGTH 15-30 N/MM² — ORIGINAL LIME MORTAR COMPRESSIVE STRENGTH 0.5-2.0 N/MM²): THE BRICK IS 7-60 TIMES STRONGER THAN THE ORIGINAL MORTAR — THIS ENSURES THE MORTAR ERODES FIRST; OPC SAND-CEMENT MORTAR (COMPRESSIVE STRENGTH 10-60 N/MM² — DEPENDING ON MIX — A 1:3 OPC:SAND MIX CAN EXCEED 50 N/MM²): THE SAME OR STRONGER THAN THE BRICK — THE SACRIFICIAL HIERARCHY IS INVERTED — THE BRICK ERODES AND SPALLS BEFORE THE OPC MORTAR FAILS; OPC MORTAR PROBLEMS (SPECIFIC TO VICTORIAN TERRACE BRICKWORK): (1) MOISTURE TRAPPING: OPC MORTAR IS MORE IMPERMEABLE THAN YELLOW LONDON STOCK BRICK — MOISTURE THAT PREVIOUSLY ESCAPED THROUGH THE MORE PERMEABLE LIME MORTAR JOINT CANNOT ESCAPE THROUGH OPC — THE MOISTURE MIGRATES INSTEAD THROUGH THE BRICK FACE — CAUSING FREEZE-THAW SPALLING, SULPHATE ATTACK, AND ACCELERATED BRICK FACE EROSION; (2) SHRINKAGE CRACKING: OPC MORTAR SHRINKS SLIGHTLY AS IT CURES — CREATING HAIRLINE CRACKS AT THE MORTAR/BRICK INTERFACE — WATER INFILTRATES BEHIND THE POINTING AND ACCELERATES DETERIORATION; (3) THERMAL EXPANSION MISMATCH: OPC MORTAR AND BRICK HAVE DIFFERENT COEFFICIENTS OF THERMAL EXPANSION — DIFFERENTIAL MOVEMENT STRESSES THE BRICK FACE; (4) PHYSICAL RESTRAINT: HARD OPC MORTAR PREVENTS THE NATURAL THERMAL AND MOISTURE MOVEMENT OF THE BRICK BODY — BUILDING UP STRESS IN THE BRICK FABRIC — EVENTUALLY CAUSING CRACKING OF THE BRICK BODY RATHER THAN THE MORTAR JOINT.
Natural Hydraulic Lime (NHL): Grades and Selection
NATURAL HYDRAULIC LIME (NHL — MADE FROM NATURALLY OCCURRING IMPURE LIMESTONE CONTAINING SILICATES AND ALUMINATES WHICH PROVIDE A DEGREE OF HYDRAULIC SET — AS DISTINCT FROM PURE CALCIUM CARBONATE LIMESTONE USED FOR NON-HYDRAULIC LIME PUTTY) IS THE CORRECT BINDER CATEGORY FOR REPOINTING AND MORTAR REPAIR OF LONDON VICTORIAN TERRACES — BECAUSE IT PROVIDES A CONTROLLED DEGREE OF HYDRAULIC SET (GAINING STRENGTH IN THE PRESENCE OF MOISTURE — UNLIKE NON-HYDRAULIC LIME PUTTY WHICH SETS ONLY BY CARBONATION WITH AIR CO2 AND IS TOO SLOW-SETTING AND SOFT FOR EXTERNAL USE ON AN EXPOSED LONDON TERRACE ELEVATION) WHILE REMAINING FAR SOFTER, MORE PERMEABLE, AND MORE FLEXIBLE THAN OPC MORTAR.
NHL GRADES (CLASSIFIED BY HYDRAULICITY — THE DEGREE OF HYDRAULIC SET — UNDER BS EN 459-1:2015 — BUILDING LIMES — DEFINITIONS, SPECIFICATIONS, AND CONFORMITY CRITERIA): NHL 2 (FEEBLY HYDRAULIC LIME): MINIMUM COMPRESSIVE STRENGTH 2.0 N/MM² AT 28 DAYS — THE SOFTEST NHL — APPROPRIATE FOR USE IN EXTREMELY DELICATE HISTORIC FABRIC, VERY SOFT BRICK OR STONE, SHELTERED APPLICATIONS, OR AS THE FINAL COAT OF A THREE-COAT LIME RENDER OR POINTING WHERE MAXIMUM SOFTNESS IS REQUIRED; NHL 3.5 (MODERATELY HYDRAULIC LIME): MINIMUM COMPRESSIVE STRENGTH 3.5 N/MM² AT 28 DAYS — THE STANDARD SPECIFICATION FOR REPOINTING AND MORTAR REPAIR OF LONDON VICTORIAN TERRACE BRICKWORK IN EXPOSED UK WEATHER CONDITIONS — THE RECOMMENDED SPECIFICATION FOR MOST VICTORIAN TERRACE REPOINTING IN LONDON (MODERATELY EXPOSED ELEVATION — NOT EXCESSIVELY SHELTERED OR EXCESSIVELY EXPOSED) — SETS RELIABLY IN THE WET AND CHANGEABLE LONDON CLIMATE WITHOUT BEING TOO HARD FOR THE YELLOW LONDON STOCK BRICK; NHL 5 (EMINENTLY HYDRAULIC LIME): MINIMUM COMPRESSIVE STRENGTH 5.0 N/MM² AT 28 DAYS — THE HARDEST NHL — ONLY APPROPRIATE FOR VERY HARD BRICKS OR DENSE STONE (GRANITE, HARD SANDSTONE) — NOT APPROPRIATE FOR YELLOW LONDON STOCK BRICK AS IT IS TOO HARD AND INFLEXIBLE FOR SOFT VICTORIAN BRICKWORK — AVOID FOR VICTORIAN TERRACE REPOINTING. LEADING UK NHL SUPPLIER — ST ASTIER (CHAUX DE ST ASTIER — NATURALLY OCCURRING NHL FROM THE DORDOGNE AREA OF FRANCE — PREMIER UK MARKET STANDARD FOR LIME MORTAR SPECIFICATION IN HERITAGE AND CONSERVATION APPLICATIONS): ST ASTIER NHL 3.5 (50KG BAGS — THE STANDARD SPECIFICATION — WIDELY STOCKED BY UK BUILDERS MERCHANTS AND SPECIALIST LIME SUPPLIERS — TRAVERTINE TILES, LONDONLIME SUPPLIES, MATERIALS MARKET LTD — ALSO AVAILABLE FROM SPECIALIST SUPPLIERS LIMEWORKS.CO.UK, CORNISH LIME, LIMEBASE PRODUCTS); PROMPT (CALCIUM SULFOALUMINATE — ALUMINOUS NATURAL CEMENT — FROM VICAT GROUP FRANCE — SOMETIMES ADDED TO NHL MORTARS TO ACCELERATE SET WHERE FASTER EARLY STRENGTH IS REQUIRED — BUT SHOULD ONLY BE USED BY EXPERIENCED LIME MASONS AS OVER-USE CAN MAKE THE MORTAR TOO HARD).
Lime Mortar Mix Design for Victorian Terrace Repointing
THE CORRECT LIME MORTAR MIX FOR REPOINTING A LONDON VICTORIAN TERRACE DEPENDS ON THE NHL GRADE, THE AGGREGATE (SAND) TYPE, AND THE LOCATION OF THE WORK (EXPOSED VS SHELTERED — ABOVE OR BELOW DPC LEVEL — HORIZONTAL OR VERTICAL JOINT).
STANDARD SPECIFICATION FOR LONDON VICTORIAN TERRACE EXTERNAL BRICKWORK REPOINTING: NHL 3.5 : WASHED SHARP SAND — MIX RATIO 1:2.5 (ONE PART NHL 3.5 BY VOLUME : 2.5 PARTS WASHED SHARP SAND BY VOLUME) — THIS IS THE MOST WIDELY RECOMMENDED MIX FOR MODERATELY EXPOSED EXTERNAL BRICKWORK REPOINTING IN THE UK (RECOMMENDED BY SPAB — THE SOCIETY FOR THE PROTECTION OF ANCIENT BUILDINGS — AND HISTORICALLY ENGLAND TECHNICAL DOCUMENTS); NOTE ON AGGREGATE: THE AGGREGATE (SAND) USED IN A LIME MORTAR IS AS IMPORTANT AS THE LIME BINDER — THE AGGREGATE DETERMINES THE COLOUR, TEXTURE, AND SHRINKAGE OF THE MORTAR — FOR AUTHENTIC PERIOD REPOINTING ON A LONDON VICTORIAN TERRACE: USE A WASHED SHARP SAND (NOT SOFT BUILDING SAND — SOFT SAND PRODUCES A WEAKER AND LESS PERMEABLE MORTAR) — IDEALLY COLOUR-MATCHED TO THE AGGREGATE IN THE ORIGINAL HISTORIC MORTAR; COLOUR MATCHING: TO CLOSELY MATCH THE ORIGINAL MORTAR COLOUR, TAKE A SAMPLE OF THE ORIGINAL UNDAMAGED HISTORIC MORTAR (FROM AN AREA PROTECTED FROM WEATHERING — UNDER A WINDOW CILL, IN A SHELTERED CHIMNEY JOINT, BEHIND A DOWNPIPE) AND HAVE IT COLOUR-MATCHED BY A SPECIALIST LIME MORTAR SUPPLIER (LIMEWORKS.CO.UK, CORNISH LIME, LIMEBASE PRODUCTS) — THEY CAN PROVIDE A CUSTOM-MIXED LIME PUTTY OR NHL MORTAR TINTED WITH MINERAL PIGMENTS TO MATCH; BELOW DPC LEVEL (BELOW THE DAMP-PROOF COURSE WHERE THE MORTAR IS IN CONTACT WITH SULPHATE-BEARING LONDON CLAY GROUNDWATER): NHL 3.5 IS THE PREFERRED BINDER (NOT NHL 5 — TOO HARD — NOT OPC — SULPHATE ATTACK RISK; NHL 3.5 HAS LOWER C3A CONTENT THAN OPC AND IS SIGNIFICANTLY MORE SULPHATE-RESISTANT); LIME PUTTY MORTAR (NON-HYDRAULIC — FOR INTERIOR APPLICATIONS AND VERY SHELTERED EXTERNAL LOCATIONS ONLY): LIME PUTTY 1:2.5 TO 1:3 WASHED SHARP SAND — SETS VERY SLOWLY BY CARBONATION — NOT APPROPRIATE FOR EXPOSED EXTERNAL REPOINTING IN THE LONDON CLIMATE — USE NHL 3.5 FOR EXTERNAL WORK.
Removing OPC Mortar: Tools and Method
REMOVING EXISTING OPC REPOINTING FROM LONDON VICTORIAN TERRACE BRICKWORK IS ONE OF THE MOST DELICATE AND DEMANDING TASKS IN HISTORIC BUILDING REPAIR — BECAUSE THE OPC MORTAR IS TYPICALLY AS HARD OR HARDER THAN THE SOFT YELLOW STOCK BRICK, THE RISK OF DAMAGING THE BRICK ARRIS (EDGE) DURING REMOVAL IS HIGH — AND ONCE THE ARRIS IS DAMAGED, THE CHARACTER OF THE JOINT PROFILE IS PERMANENTLY ALTERED.
REMOVAL METHOD — COLD CHISEL AND CLUB HAMMER (THE TRADITIONAL AND SAFEST METHOD FOR SMALL AREAS): A NARROW COLD CHISEL (12-14MM WIDTH) IS USED TO CAREFULLY DRIVE THE MORTAR OUT FROM THE JOINT — WORKING ALONG THE JOINT CENTRE — MINIMUM RAKE-OUT DEPTH 15-20MM — TAKE EXTREME CARE NOT TO LEVER THE CHISEL AGAINST THE BRICK ARRIS; RECOMMENDED FOR SMALL AREAS, DELICATE BRICKWORK, OR WHERE THE EXISTING OPC IS ALREADY CRACKED AND PARTLY LOOSE. ANGLE GRINDER WITH MORTAR RAKING DISC (THE FASTER BUT MORE RISK-PRONE METHOD — FOR LARGER AREAS WHERE TIME IS A FACTOR): A 4.5-INCH (115MM) ANGLE GRINDER WITH A MORTAR RAKING DISC (ALSO CALLED A POINTING DISC OR JOINT RAKING DISC — A SEGMENTED DIAMOND DISC — E.G. RUBI DRBD MORTAR REMOVAL DISC OR STIHL MORTAR RAKING DISC) CUTS ALONG THE BED AND PERPEND JOINTS AT A CONTROLLED DEPTH; CRITICAL RULE: THE GRINDER MUST ONLY CUT INTO THE MORTAR JOINT — NOT INTO THE BRICK FACE — THE MAXIMUM CUT DEPTH SHOULD BE SET TO 15-20MM ONLY — NEVER GRIND ALONG THE BRICK/MORTAR INTERFACE AS THIS DESTROYS THE BRICK ARRIS; RECOMMENDED TECHNIQUE: CUT ONLY THE BED JOINTS (HORIZONTAL) WITH THE GRINDER — USE COLD CHISEL AND HAMMER FOR THE PERPEND (VERTICAL) JOINTS — THE GRINDER IS DIFFICULT TO CONTROL PRECISELY IN VERTICAL JOINTS; DUST CONTROL: REPOINTING GENERATES SIGNIFICANT SILICA DUST (RESPIRABLE CRYSTALLINE SILICA — RCS — EXPOSURE MUST BE CONTROLLED UNDER COSHH REGULATIONS AND CONTROL OF DUST AT WORK REGULATIONS — USE P3 DUST MASK (FFP3 RATED) AND WET-CUTTING ATTACHMENT WHERE POSSIBLE — SCAFFOLD-MOUNTED VACUUM EXTRACTION ON ANGLE GRINDER IS THE PREFERRED METHOD FOR HEALTH AND SAFETY COMPLIANCE. AFTER RAKE-OUT: BRUSH OUT ALL DUST AND DEBRIS — LIGHTLY DAMPEN THE JOINT AND ADJACENT BRICK FACES (DO NOT SATURATE — LIME MORTAR MUST NOT BE APPLIED TO AN EXCESSIVELY WET SURFACE) — APPLY LIME MORTAR IN LAYERS NOT EXCEEDING 10-12MM DEPTH — ALLOW EACH LAYER TO FIRM BEFORE NEXT — DO NOT ALLOW TO DRY OUT TOO QUICKLY IN HOT/WINDY WEATHER (PROTECT WITH HESSIAN AND MISTING FOR MINIMUM 3 DAYS AFTER APPLICATION — THE LONGER THE BETTER FOR LIME CARBONATION).
Lime Mortar Repointing Costs in London
LIME MORTAR REPOINTING COSTS (LONDON 2025 — SPECIALIST LIME MASON / HERITAGE BRICKWORK CONTRACTOR — SUPPLY AND FIT — LABOUR AND MATERIALS — APPROXIMATE RANGE PER M² OF BRICKWORK FACE).
OPC RAKING OUT ONLY (RAKE OUT EXISTING OPC MORTAR FROM JOINTS — MINIMUM 15-20MM DEPTH — COLD CHISEL + ANGLE GRINDER — PER M² OF BRICKWORK FACE — NOT INCLUDING RELIMING): APPROXIMATELY £8-18/M² (LABOUR — RATE VARIES SIGNIFICANTLY WITH THE HARDNESS OF THE OPC MORTAR — VERY HARD OPC IS SLOW AND EXPENSIVE TO REMOVE WITHOUT ARRIS DAMAGE). RAKING OUT + RELIMING (NHL 3.5 1:2.5 WASHED SHARP SAND — INCLUDING POINTING UP IN 1-2 LAYERS — PER M² OF BRICKWORK FACE): APPROXIMATELY £25-50/M² (STANDARD REPOINTING — FLAT OR FLUSH JOINT PROFILE — NO BRICK REPLACEMENT — MID-SPECIFICATION). HERITAGE REPOINTING (NHL 3.5 1:2.5 WASHED SHARP SAND — COLOUR MATCHED TO HISTORIC MORTAR USING MINERAL PIGMENTS — STRUCK JOINT PROFILE TO MATCH ORIGINAL PATTERN — SPECIALIST LIME MASON): APPROXIMATELY £40-75/M² (CONSERVATION-GRADE REPOINTING — SLOW AND SKILLED WORK — FOR FRONT ELEVATIONS VISIBLE IN THE STREET SCENE OR CONSERVATION AREA PROPERTIES). SCAFFOLD (4-WEEK HIRE — 3-STOREY FRONT ELEVATION — LONDON VICTORIAN TERRACE): APPROXIMATELY £1,200-2,500. TYPICAL FULL FRONT ELEVATION REPOINTING (APPROXIMATELY 35-50M² OF BRICKWORK FACE — INCLUDES SCAFFOLD — RAKING OUT OPC AND RELIMING WITH NHL 3.5 1:2.5 WASHED SHARP SAND): APPROXIMATELY: 40M² X £35/M² = £1,400 + SCAFFOLD £1,500 = APPROXIMATELY £2,900-5,500 TOTAL (STANDARD REPOINTING); APPROXIMATELY: 40M² X £55/M² = £2,200 + SCAFFOLD £1,500 = APPROXIMATELY £3,700-7,000 TOTAL (HERITAGE COLOUR-MATCHED REPOINTING).
Frequently Asked Questions
Why should I not use OPC mortar on a Victorian terrace?▼
What is the correct lime mortar specification for repointing a Victorian terrace?▼
What is the difference between NHL 2, NHL 3.5, and NHL 5?▼
How do I remove OPC mortar from Victorian brickwork without damaging the bricks?▼
How much does lime mortar repointing cost in London?▼
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.