Contents
- 1. What Is Passive House (Passivhaus)?
- 2. The Core Passive House Principles
- 3. Passive House Certification Levels
- 4. Is Passive House Worth It for London Projects?
- 5. Passive House and London Planning
- 6. The Passive House Design Process
- 7. Choosing a Passive House Contractor in London
- 8. rcbGroup and Energy-Efficient Construction
What Is Passive House (Passivhaus)?
Passive House, known in its German origin as Passivhaus, is the world's most rigorous voluntary energy performance standard for buildings. Developed in Germany in the early 1990s, the standard has been adapted for UK climate conditions and is now applied to homes, extensions, retrofits, and commercial buildings across London.
The term "passive" refers to the building's ability to maintain comfortable indoor temperatures passively — through insulation, airtightness, solar gain, and mechanical ventilation with heat recovery — rather than relying primarily on active heating and cooling systems.
A certified Passive House building typically uses 75–90% less space heating energy than a conventional UK home. For London homeowners, this translates to dramatically lower energy bills, superior indoor air quality, and a building that remains comfortable through both cold winters and increasingly hot London summers.
The Core Passive House Principles
Passive House design is built around five interconnected principles that work together as a system:
1. Superior Thermal Insulation
Passive House requires much higher insulation levels than standard UK building regulations. Walls, roofs, and floors must achieve very low U-values, meaning very low heat loss per square metre. Typical Passive House wall U-values are around 0.10–0.15 W/m²K, compared to a standard UK building regulation requirement of around 0.18–0.30 W/m²K depending on element type.
In a London context, this usually means external wall insulation thicknesses of 200–300mm or more, triple-glazed windows, and insulated foundations, all designed to create a continuous thermal envelope with no weak points.
2. High-Performance Windows and Doors
Passive House requires triple-glazed windows with thermally broken frames and low-emissivity coatings. In London's temperate climate, south-facing glazing is carefully designed to admit winter solar gain while limiting summer overheating. Windows typically achieve U-values of 0.80 W/m²K or below for the overall window unit, compared to the 1.6 W/m²K minimum currently required by UK building regulations.
The glazing strategy must balance solar gain (useful in winter, problematic in summer) with daylighting and views. Passive House modelling software calculates optimal glazing areas and orientations for the specific site and climate.
3. Thermal Bridge-Free Construction
Thermal bridges are weak points in a building's thermal envelope where heat flows more easily than through the surrounding construction. Passive House requires the elimination or minimisation of thermal bridges at junctions between elements — for example, where walls meet floors, where windows are installed into walls, or where balconies project through the building envelope.
In London's Georgian, Victorian, and Edwardian terraced housing stock, thermal bridge-free detailing is particularly challenging because of the constraints imposed by party walls, existing structures, and planning conservation requirements. Specialist detailing is essential.
4. Airtight Construction
The Passive House standard requires a building air leakage rate of no more than 0.6 air changes per hour at 50 pascals pressure difference (n50 ≤ 0.6/h). This is approximately 10 times more airtight than a typical newly built UK home and 20–30 times more airtight than a typical pre-1980s UK house.
Achieving this level of airtightness requires a continuous airtight layer (often a membrane or a combination of membranes and wet plasters) with every penetration for pipes, cables, and ducts carefully sealed. It requires contractor training, quality management, and air pressure testing at key stages during construction.
5. Mechanical Ventilation with Heat Recovery (MVHR)
Because Passive House buildings are so airtight, natural infiltration cannot provide adequate fresh air for occupants. MVHR supplies fresh filtered air to living spaces and bedrooms while simultaneously extracting stale air from kitchens and bathrooms, recovering 75–95% of the heat from the outgoing air before exhausting it.
The result is continuous fresh air throughout the home, excellent indoor air quality, the removal of excess moisture (reducing condensation and mould risk), and a comfortable, draught-free environment. London's variable air quality makes the filtration aspect particularly valuable.
Passive House Certification Levels
There are currently three certification levels for Passive House:
Classic Passive House — the original standard, requiring space heating demand below 15 kWh/m²/year, a space heating load below 10 W/m², total primary energy demand below 120 kWh/m²/year, and airtightness of n50 ≤ 0.6/h.
EnerPHit — the Passive House retrofit standard, recognising that upgrading existing buildings to full Passive House is often not technically feasible. EnerPHit allows either a component-based or energy-based path, with a slightly relaxed space heating demand of 25 kWh/m²/year. For London's large stock of pre-war terraced housing, EnerPHit is the most relevant certification route.
Passive House Plus and Premium — these newer tiers add requirements for on-site renewable energy generation (photovoltaics) to achieve net zero or net positive energy status.
Certification is through the Passivhaus Institut in Germany or an accredited UK certifier, typically involving design phase review, documentation, and post-construction air pressure testing.
Is Passive House Worth It for London Projects?
This depends heavily on project type, budget, and priorities:
New builds — Passive House is most achievable and cost-effective on new builds where the entire envelope can be designed from scratch. In London, new builds account for relatively few residential projects, but where they occur, Passive House achieves exceptional performance.
Extensions — A Passive House-standard extension is absolutely achievable but must be designed as a self-contained unit or the entire extended building treated as a whole. A warm flat roof, triple glazing, thick external insulation, and an MVHR serving the new and existing spaces are all feasible for London extensions.
Whole-house retrofits — Full Passive House retrofit of a Victorian terrace in London is technically achievable but expensive and complex, requiring external insulation of potentially 200–300mm thickness, a new roof or insulated sarking, triple glazing throughout, and complete MVHR installation. In conservation areas or where external appearance matters, EnerPHit may be a more practical target.
Loft conversions — Passive House-standard loft conversions are achievable and beneficial because the roof is the element with the most heat loss potential in a typical London home.
The cost premium for Passive House is typically 10–20% above standard construction for new builds and somewhat higher for retrofits in existing buildings. However, the ongoing energy savings, superior comfort, and improved health outcomes from better air quality make it attractive over longer time horizons.
Passive House and London Planning
Passive House is not a planning requirement in London, but several London boroughs encourage or mandate high energy performance standards through their local plans. The Greater London Authority's London Plan requires major developments to meet net zero carbon standards, and Passive House is one of the most credible routes to demonstrate compliance.
In conservation areas, listed buildings, and Article 4 direction areas common across inner London, external insulation to achieve Passive House may require planning permission and must respect character, appearance, and heritage significance. Slim internal insulation systems and high-performance secondary glazing (for listed buildings) may be the only acceptable routes.
The Passive House Design Process
Achieving Passive House requires using specialist modelling software — primarily the Passive House Planning Package (PHPP) — to design and optimise the building's energy performance before construction. PHPP models heat loss, heat gains (solar and internal), airtightness, MVHR efficiency, and annual energy demand.
The PHPP model is typically developed by a Passive House designer or Certified Passive House Consultant (CPHC), often working alongside the architect. The model informs critical decisions including insulation thickness, glazing specification, MVHR selection, and window orientation.
Construction requires contractors trained and experienced in Passive House detailing. Errors during construction — particularly in airtightness and thermal bridge details — can significantly compromise performance.
Choosing a Passive House Contractor in London
Ask any contractor or design team claiming Passive House experience to demonstrate:
- Completed Passive House certified projects with documentation
- Certified Passive House Consultant (CPHC) credentials for the designer
- Experience with air pressure testing at intermediate stages, not just at completion
- Familiarity with London planning constraints relevant to energy retrofit
The Passivhaus Trust maintains a list of certified designers and consultants in the UK and is the primary professional body for Passive House in Britain.
rcbGroup and Energy-Efficient Construction
rcbGroup supports clients considering energy performance improvements from standard building regulations compliance through to EnerPHit and Passive House-influenced design. Our pre-construction process includes scope definition, design coordination, and specification development to ensure that energy performance targets are understood commercially before work begins.
Whether you are pursuing full certification or applying Passive House principles selectively to a loft conversion or extension, early design coordination between your architect, energy consultant, and contractor produces better outcomes than attempting to retrofit energy performance targets into a design developed without them.
Speak to our team to discuss how energy performance goals can be integrated into your London project from the earliest design stages.
Want advice on your own project?
Pick whatever suits you. We'll look at what you have (drawings, photos or quotes) and tell you honestly what the next step should be.
Prefer to phone? Call +44 7359 872594.
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. To talk through your own project, book a project review.
Was this guide helpful? Share it:
Have a question about your project?
Message us on WhatsApp or call — we reply during working hours (Mon–Fri 8am–6pm, Sat 9am–2pm).