Part M of the Building Regulations — What It Requires
Part M of the Building Regulations (Access to and Use of Buildings) applies to new dwellings in England and sets out three categories of accessibility. Category 1 (M4(1)) is the basic visitable standard that applies by default to all new homes — it requires a step-free entrance, 775mm minimum clear door widths on the entrance level, and a WC on the entrance level. Category 2 (M4(2)) — accessible and adaptable dwellings — goes further and is increasingly required by London Plan policy for a proportion of new homes. It requires wider doorways (775mm minimum clear width throughout), a step-free shower or level-access bathroom on the entrance level, circulation space to allow easy turning, and features that allow future adaptation. Category 3 (M4(3)) — wheelchair user dwellings — is the full wheelchair standard, requiring 900mm clear door widths, turning circles of 1500mm diameter in key spaces, a level-access shower or wet room designed for a wheelchair user, a through-floor lift or single-storey layout, kitchen and bathroom layouts designed around wheelchair use, and controls and switches at heights reachable from a wheelchair. For existing homes being adapted rather than new-build, the same principles apply but via the Approved Documents rather than as a planning requirement. Any structural alteration — widening a doorway, installing a platform lift shaft — requires a Building Regulations application.
The Disabled Facilities Grant (DFG)
The Disabled Facilities Grant is a means-tested grant provided by local authorities in England to fund adaptations that help a disabled person live independently in their home. The maximum grant is £30,000 in England (as of 2024-25; this figure is periodically uprated). The grant can fund: ramps and level access at the entrance; widening of doorways; installation of a stairlift or through-floor lift; adaptation of a bathroom to a level-access shower or wet room; installation of specialist kitchen equipment; heating adaptations; and other works recommended by an occupational therapist. To access the DFG, you apply through your local authority (London borough council). An occupational therapist will assess the person's needs and recommend the appropriate adaptations. The grant is means-tested based on the household's financial resources — many applicants qualify for the full grant, particularly where the disabled person has limited savings and income. The grant covers the person's primary or only residence. Works must be completed by a contractor approved by the local authority, or the grant may be contingent on getting multiple quotes. Processing times vary considerably by borough — some process applications in 3–6 months, others have waiting lists of 12 months or more. If urgency is high, some boroughs have a fast-track route for urgent cases, and there are also charitable grants available through organisations such as Turn2us and local disability charities.
Door Width Requirements
Door width is one of the most fundamental aspects of wheelchair accessibility. The key measure is the clear opening width — the distance between the face of the door stop on the lock side and the face of the open door — not the nominal door size. For a manual wheelchair, a minimum clear opening of 775mm is generally workable but tight. For a powered wheelchair, which is wider and less manoeuvrable, 850mm clear opening is a practical minimum and 900mm is recommended for comfortable independent use. In an existing terraced or Victorian property in London, many internal doors are 762mm (2'6") nominal width, which gives a clear opening of around 700–720mm — insufficient for wheelchair use. Widening these doorways requires removal of the existing door lining and frame, cutting back the masonry or timber stud on one or both sides, installing a new wider frame, and making good the surrounding plasterwork and decorations. Where the wall is load-bearing, a structural engineer must design an appropriate lintel or beam to carry the load over the wider opening before the door can be widened.
Level Thresholds and Ramp Gradients
A level threshold means no step at all at the entrance — the internal floor and external surface are at the same height, with a drainage channel or slight slope immediately outside to prevent water ingress. For existing London homes with a front or rear step, creating a level threshold typically involves either raising the external ground level with a platform, or in some cases lowering the internal floor level (which is complex in older properties). Where a ramp is required, the gradient is critical. Part M and BS 8300 specify: 1:20 (5%) for a ramp up to 10 metres long; 1:15 (6.7%) for a ramp up to 5 metres long; anything steeper than 1:12 (8.3%) is not considered suitable for independent wheelchair use. Ramp width should be a minimum 1.5m to allow a wheelchair user to pass. Handrails are required on both sides for ramps over 300mm rise. In a London terraced house with a raised ground floor (common in Victorian stock), a ramp from pavement to front door may require a significant run — a 300mm rise at 1:15 requires a 4.5m ramp. This may not be possible within the front garden, making a rear entry or a small platform lift a more practical solution.
Through-Floor Platform Lifts
For a wheelchair user who cannot use a stairlift (which requires the person to transfer out of the wheelchair), a through-floor platform lift is the primary solution for multi-storey access. A platform lift is a small lift — typically a 900mm x 1400mm platform — that travels through an opening cut in the floor between storeys. It does not require a lift shaft or pit in the way a conventional passenger lift does, making it suitable for domestic retrofitting. Key considerations include: structural implications of cutting the floor opening (a structural engineer must design the trimming beams around the opening); ceiling height between floors (a minimum of around 2.4m finished floor to finished ceiling is needed in most residential lifts); whether the lift requires a pit (some through-floor lifts require a shallow pit of 150-250mm; others are pit-free). Installation typically takes 1–3 days. Building Regulations approval is required under Part K (Protection from Falling, Collision and Impact) and Part M. The DFG can fund platform lift installation where recommended by an occupational therapist. Cost for a domestic through-floor platform lift is typically £8,000–£18,000 supply and install depending on model and specification.
Wet Rooms and Accessible Bathrooms
A wet room — a fully waterproofed, level-access shower room — is the gold standard for wheelchair-accessible bathing. Key design requirements are: a fully tanked floor and walls (typically using a liquid waterproofing membrane applied to the substrate before tiling); a linear drain along one wall or a central drain, with the floor sloped at 1:60 to 1:40 to direct water to the drain without creating a trip hazard or gradient that is uncomfortable for wheelchair use; a clear access area of at least 1500mm x 1500mm for wheelchair manoeuvring; a fold-down shower seat at the correct height (typically 480mm); grab rails positioned appropriately for the user's specific needs (an occupational therapist should specify rail positions); a thermostatic shower valve with lever controls; and a low or flush threshold between the wet room and the adjacent circulation area. Structural implications in an older London property include: the floor may need to be lowered slightly (typically 50-100mm) to accommodate the fall to the drain within the existing floor depth — this requires cutting into joists and is a structural consideration; the walls will need to be fully removed back to the structure for retiling. The DFG can fund wet room adaptation. A fully fitted accessible wet room in a London property typically costs £8,000–£18,000 depending on specification and whether structural work is required.
Lifetime Homes and Forward Planning
The Lifetime Homes Standard is a voluntary design standard developed to ensure homes can accommodate the changing needs of occupants over their lifetime — including adaptation for wheelchair use as needs change. It covers 16 design criteria including: step-free approach and entrance; wider doorways throughout; a WC on the entrance level; provision for future installation of a through-floor lift (a 900mm x 1400mm zone identified in the design); a bedroom on the ground floor or provision for one; and accessible kitchen and bathroom layouts. Many London developments built under post-2010 planning consents incorporated Lifetime Homes as a planning requirement. For homeowners carrying out extensions or major refurbishments, designing to Lifetime Homes principles even when not legally required is increasingly seen as adding long-term value — future-proofing the property for ageing-in-place and broadening its appeal to a wider range of buyers.
Frequently Asked Questions
How much can I get from the Disabled Facilities Grant?▼
Does widening a doorway need Building Regulations approval?▼
What is the difference between a stairlift and a through-floor platform lift?▼
What is the minimum door width for a wheelchair?▼
Can I get planning permission for a ramp at the front of a London terraced house?▼
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. rcbGroup offers free initial consultations — book your free survey.
Was this guide helpful? Share it:
Have a question about your project?
Chat with us on WhatsApp — Faith usually replies within the hour.