Contents
What to Look For When Viewing a Property to Renovate
The key difference between viewing a property to buy to live in and viewing a property to renovate is that the renovator must look through the current condition to assess the potential — while simultaneously understanding what the renovation will cost.
- **External structure:**
- •**Roof condition:** Is the roof original (Victorian slate, concrete tiles, flat-roof extensions)? What is its condition? A full re-roof in London costs £6,000–£20,000+ — a significant variable in the renovation budget. Look for missing or slipped tiles, sagging valleys, blocked gutters.
- •**External walls:** Look for cracks (particularly diagonal cracks from window/door corners — potential indication of settlement, subsidence, or movement). Check the pointing — is the mortar in good condition or extensively eroded?
- •**Chimney stacks:** Cracked, leaning, or overbuilt chimney stacks are a significant repair item. Look for re-bonding with cement mortar (incorrect — traps moisture in the stack) versus lime pointing.
- •**Gutters and drainage:** Blocked or cracked guttering causes water to run down walls — look for staining on external masonry, moss on walls below gutter level.
- **Internal structure:**
- •**Ceilings:** Check for cracks, staining (water ingress from above), and the condition of the lath-and-plaster ceilings (in a Victorian terrace, these are often 130 years old and may be failing).
- •**Floors:** In the front and rear reception rooms, check for bounce or flex in the timber floor (a sign of joist deterioration). Look for signs of rising damp through the skirting boards and lower sections of walls.
- •**Staircase:** Is the staircase original and in good condition? A Victorian staircase replacement costs £4,000–£15,000.
- •**Fireplaces and chimney breasts:** Have chimney breasts been removed? Has the structure above been properly supported? (A very common hidden defect.)
- **Services:**
- •**Boiler:** What is the boiler type and age? A like-for-like boiler replacement in London costs £2,500–£5,000; a full heating system upgrade £5,000–£12,000+.
- •**Electrical:** Is the consumer unit modern (RCD-protected) or an older fuseboard? Has the wiring been updated recently (visible in the loft or under floorboards)? A full rewire costs £5,000–£16,000.
- •**Plumbing:** Lead pipes are common in pre-1970 London properties (though most have been replaced). Cold water tanks in the loft (older system) vs. mains-fed combi boiler. Are there signs of past leaks or water damage?
- **Development potential:**
- •Does the property have a side return that can be filled?
- •Is there a loft that can be converted (head height above 2.2m, accessible from the first floor)?
- •Is the rear garden deep enough for a rear extension?
- •Are there any planning history notes (past refusals, neighbour disputes)?)
Estimating Renovation Costs Before Making an Offer
Having a realistic renovation cost estimate before making an offer is essential — it determines how much you can pay for the property while achieving your target end value or within your budget.
**Approach to pre-offer cost estimation:** Without drawings or a survey, renovation costs must be estimated by experienced people who know what to look for. The best approach is:
1. **Categorise the work into elements:** Structural (load-bearing walls, loft, extension), M&E (rewire, new boiler, heating), fabric (roof, damp, drainage), internal finishes (kitchen, bathroom, plastering, flooring, decoration) 2. **Make conservative assumptions:** Assume the worst on condition items you cannot verify (e.g., assume the electrics need a full rewire rather than partial, assume the roof needs work rather than assuming it is fine) 3. **Allow a contingency:** A renovation contingency of 10–20% on top of the identified scope is standard — renovation projects almost always uncover additional work once the property is stripped.
- **Quick order-of-magnitude estimates for London renovations:**
- •Full rewire (3-bed Victorian terrace): £6,000–£12,000
- •Boiler replacement (gas combi): £2,500–£4,500
- •Loft conversion (standard rear dormer): £40,000–£65,000
- •Rear extension (single-storey, 25–35m²): £60,000–£100,000
- •Side return extension (with kitchen): £65,000–£110,000
- •Ground floor full refurbishment (kitchen, structural opening, flooring, decoration): £25,000–£50,000
- •Roof replacement (Victorian slate): £10,000–£18,000
- •Full bathroom renovation: £7,000–£16,000
**The purchase price math:** End value − total renovation cost − 10–20% contingency − purchase costs (SDLT, legal, survey) − finance costs = maximum purchase price. Working backwards from the end value keeps the numbers honest.
**Professional survey before exchange:** Before exchanging contracts, commission a RICS Level 3 Building Survey on the property. The cost (£500–£1,200 depending on property value and surveyor) is small relative to the renovation budget and provides professional assessment of the main defects. The survey report should be reviewed with your contractor — defects flagged by the surveyor become cost items in the renovation budget.
Renovation Finance and Project Management
**Renovation finance:** Standard residential mortgages are not designed for properties that require significant renovation — many lenders will not lend on properties that are uninhabitable (no functional kitchen or bathroom) or that have structural defects. Options include:
- •**Bridging loan:** A short-term loan (typically 6–24 months) at higher interest rates, used to purchase and renovate the property. On completion of renovation, the bridging loan is repaid with a standard mortgage (remortgage at the new higher value). Bridging rates: typically 0.75–1.5% per month (9–18% per annum).
- •**Renovation mortgage:** Some lenders offer mortgages for renovation properties where funds are released in stages as the renovation progresses (subject to valuation at each stage). Requirements vary by lender.
- •**Cash purchase + renovation finance:** The most flexible approach — buy with cash (which also gives a competitive advantage in a competitive market) and finance the renovation with a bridging loan or personal finance.
- •**Developer/investor finance:** For those renovating as a business, specialist developer finance at commercial rates is available.
- **Project management approach:**
- For a first-time renovator in London, the most common mistakes are:
- •Starting without a detailed scope of works and budget
- •Not appointing a building contractor until after purchase (when the negotiating position is weaker)
- •Attempting to act as their own project manager without the experience to manage the trade sequence and quality
- •Making significant scope changes mid-project without understanding the cost and programme impact
For a substantial renovation (loft conversion, extension, or full refurbishment), appointing rcbGroup or a similarly structured principal contractor before you start provides a single point of accountability and professional management of the whole process.
Frequently Asked Questions
What survey should I commission before buying a property to renovate in London?▼
How much should I budget for a full renovation of a London Victorian terrace?▼
Can I get a mortgage on a property that needs renovation?▼
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. To talk through your own project, book a project review.
Was this guide helpful? Share it:
Have a question about your project?
Message us on WhatsApp or call — we reply during working hours (Mon–Fri 8am–6pm, Sat 9am–2pm).