Design & Planning10 min read

Types of Architectural and Construction Drawings — What Each One Is and When You Need It

Most homeowners receive a confusing mix of documents from architects, structural engineers, and councils without a clear explanation of what each one is, when it is needed, or what it costs to produce. This guide explains every type of drawing you are likely to encounter from the start of a project to handover.

Key Takeaways

  • Concept drawings explore options; planning drawings are for the planning authority; Building Regs drawings are for Building Control; construction drawings are for the contractor
  • The title 'architect' is legally protected — only ARB-registered individuals can use it
  • Building Regulations drawings are more detailed than planning drawings and show how the building is actually constructed
  • Structural engineer drawings are required for all loft conversions, extensions, and structural alterations
  • The quality of your drawings directly determines the accuracy of your price and the smoothness of your build

Why Drawings Matter for Your Project

The quality and completeness of your drawings directly affects the quality of the price you receive. A contractor pricing from an incomplete set of drawings will make assumptions — and those assumptions will either inflate the price (to allow for unknowns) or underestimate it (with variations claimed during the build). Complete, well-coordinated drawings are the foundation of a fixed price and a smooth build.

Concept / Feasibility Drawings

The first drawings produced are usually concept or feasibility drawings. These are sketch-level plans that explore options and test what is possible on the site or within the existing building. They are used to:

  • Test whether an idea is structurally and spatially feasible
  • Compare layout options before committing to a design
  • Get an initial reaction from a contractor or planning consultant
  • Provide a basis for early cost advice

Concept drawings are not submitted to planning or Building Control. They are a working tool in the early design stage.

Planning Drawings

Planning drawings are submitted to the Local Planning Authority as part of a planning application. They typically include:

  • Location plan (1:1250 scale) showing the property in its context
  • Site plan (1:500 scale) showing the existing and proposed footprint
  • Existing floor plans (showing the property as it currently is)
  • Proposed floor plans (showing the proposed changes)
  • Elevations (front, rear, side) showing what the property will look like from the outside
  • Sections where required (cuts through the building showing floor levels, height)

Planning drawings show shape, massing, fenestration (window positions), and materials. They show what the building will look like and where it sits on the plot. They do not show construction details, structural elements, or M&E routes.

Planning drawings are also used to assess Permitted Development compliance (even though no application is required) and to prepare Lawful Development Certificate applications.

Building Regulations Drawings

Building Regulations drawings are submitted to Building Control — either the local council's Building Control department or an Approved Inspector — to demonstrate compliance with the Building Regulations. These are more detailed than planning drawings and include:

  • Floor plans at 1:50 or 1:100 showing room layouts and dimensions
  • Sections showing floor-to-ceiling heights, insulation, and structural elements
  • Elevations
  • Construction details at 1:5 or 1:10 showing how walls, floors and roofs are constructed
  • Fire strategy (required for larger or more complex projects)
  • Ventilation and drainage layout

Building Regs drawings show how the building will be built — not just what it will look like. A contractor can price from Building Regs drawings much more accurately than from planning drawings alone. Building Control inspects the work against these drawings during and after construction.

Structural Engineer Drawings

Structural engineer (SE) drawings are produced by a qualified structural engineer (Chartered Civil or Structural Engineer — CEng MICE or CEng MIStructE) and show the structural design of the building. They are separate from the architect's drawings and typically include:

  • Foundation layout and specification
  • Floor structure (joists, beams, spans, bearing)
  • Steel beam schedule (RSJ sizes, padstone specifications)
  • Loft conversion floor structure
  • Load paths and support calculations

SE drawings are needed for all structural work: loft conversions (new floor structure, any party wall beams), extensions (new foundations, new roof structure), and structural alterations (wall removals, new openings). Building Control requires structural calculations and drawings as part of the Building Regs submission.

Construction Drawings / Working Drawings

Construction drawings (also called working drawings) are the most detailed drawings produced. They are used by the contractor and tradespeople on site. They typically include:

  • Coordinated architectural and structural drawings at 1:50 or 1:100
  • Construction details at 1:5, 1:10, 1:20 for specific junctions (wall-to-roof, window reveals, step details)
  • Door and window schedules
  • Kitchen and bathroom layout drawings
  • M&E (mechanical and electrical) layout showing drainage, heating, ventilation, electrical distribution
  • Finishes schedule

Not all projects require full construction drawings — for a standard loft conversion or rear extension, Building Regs drawings plus the structural drawings are usually sufficient for pricing and build. Large or complex projects benefit from a full construction drawing package.

M&E Drawings (Mechanical and Electrical)

Mechanical and Electrical (M&E) drawings show drainage, heating, ventilation, and electrical routes. They are produced by an M&E engineer or a specialist sub-contractor (for example, a heating engineer for an underfloor heating layout, or a ventilation contractor for MVHR). M&E drawings are typically required for:

  • New build or whole-house refurbishments
  • HMO conversions (where fire alarm, emergency lighting and ventilation systems must be designed to satisfy Building Control)
  • Extensions with underfloor heating
  • Projects involving air source heat pumps
  • Major M&E upgrades

Who Should Produce Your Drawings?

The title 'architect' is legally protected in the UK. Only individuals registered with the Architects Registration Board (ARB) can use the title 'architect'. It is illegal to call yourself an architect in the UK without ARB registration. ARB registration requires a recognised architecture qualification (typically a five or seven-year programme including professional experience). Many architects are also members of RIBA (Royal Institute of British Architects), though RIBA membership is not legally required to practise.

In practice, planning drawings for residential extensions and loft conversions are often produced by architectural technicians or architectural technologists (registered with CIAT — the Chartered Institute of Architectural Technologists). These professionals are competent to produce planning and Building Regs drawings for standard residential work and typically charge less than a full RIBA-registered architect.

RCB works with a network of architects, architectural technicians, and structural engineers across London. We can recommend specialists appropriate to your project.

Frequently Asked Questions

What drawings do I need for a loft conversion?
For a loft conversion you typically need: (1) Planning drawings if full planning permission is required, or a Lawful Development Certificate application if within Permitted Development; (2) Building Regulations drawings showing floor construction, insulation, staircase, fire strategy and ventilation; (3) Structural engineer drawings showing the new floor structure, any padstones in the party wall, and the dormer or hip-to-gable structure. RCB coordinates all three as part of the pre-construction stage.
What is the difference between planning drawings and building reg drawings?
Planning drawings show what the building will look like from the outside — massing, window positions, materials. They are submitted to the planning authority. Building Regulations drawings show how the building will be constructed — structural elements, insulation specifications, floor-to-ceiling heights, fire compartmentation. They are submitted to Building Control. Both are needed for most loft conversions and extensions.
Can a contractor produce my drawings?
Some contractors include architectural and structural drawings in their package — this is common in design-and-build procurement. RCB can manage the full pre-construction package including drawings. However, the drawings must be produced by qualified and registered professionals (ARB/RIBA architects or Chartered Structural Engineers) — a contractor producing drawings without qualified individuals doing the technical work would not be compliant.
Is it illegal to call yourself an architect without being registered?
Yes. In the UK, using the title 'architect' without being registered with the Architects Registration Board (ARB) is illegal under the Architects Act 1997 and can result in criminal prosecution. Always check that anyone you employ as an architect is on the ARB register at arb.org.uk.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.