How to Get the Best From Your Building Contractor
The quality of the relationship between client and contractor is one of the strongest predictors of how well a building project goes. Not the contract terms. Not the specification. The relationship. Here's what clients who get good outcomes tend to do — and what clients who don't tend to get wrong.
Be Clear About What You Want
Vague briefs produce vague outcomes. Before you engage a contractor, spend time getting clear about what you actually want — not just "a new kitchen" or "more space downstairs" but the specific outcomes: how do you want the space to feel? How do you cook? What finishes matter to you? What don't you care about? The more precisely you can describe your requirements, the more precisely a contractor can respond to them.
This clarity also protects you from scope disagreements later. If the brief was clear and the contractor's response addresses it, there's a shared reference point for judging whether the project is on track.
Make Decisions on Time
One of the most consistent causes of delay in building projects is client decision-making. Tile selection, kitchen units, bathroom fittings, paint colours — these choices are all required at specific points in the programme. When they're not confirmed in time, the works go on hold, other trades fill the gap, and the original programme sequence is broken.
Your contractor should give you a decision schedule — a list of what decisions are needed and by when. Treat it seriously. A week's delay on a tile selection can result in two weeks' delay on the overall programme if it knocks out a tiling slot that can't be rebooked immediately.
Pay on Time
Construction companies are cash-flow businesses. Delayed payments cause real problems — for sub-contractors, materials suppliers, and the overall flow of the project. Paying on time, in accordance with the agreed terms, is one of the most effective things a client can do to keep their project running well. It's also a legal obligation under the construction payment legislation.
Raise Concerns Through the Right Channel
If you have a concern about quality, programme, or scope, raise it with the project manager or site manager — not with individual tradespeople. Going directly to a trades operative with a concern or instruction bypasses the management structure, creates confusion about who is responsible, and can inadvertently invalidate contract terms. Your point of contact is the contractor's representative; use that channel.
Don't Change Your Mind Repeatedly on Key Decisions
Variations are a normal part of building projects — circumstances change, preferences evolve, and unforeseen conditions require adjustment. But repeatedly changing decisions that have already been implemented is expensive and demoralising for the team. Once a decision has been confirmed and work completed to it, changing it is a variation with real cost consequences. Make sure you're confident before confirming decisions on irreversible items.
Trust the Process
Building projects have a programme and a process for good reasons. The sequence of trades, the drying times, the inspection stages — these exist because they produce better results. Pushing to accelerate past a drying time or skip a stage inspection to save time typically creates problems that are expensive to put right. Trust your contractor's process; if you don't understand it, ask for an explanation before overriding it.
At RCB, we brief clients at the start of every project on how we work, what we need from them, and how to get the most from the relationship. A good project is a collaborative one.