Introduction
The period immediately before a building project starts — from contract signing to the first day on site — is one of the most important and least discussed phases of any build. What you do (or don't do) in the weeks before work begins has a real impact on how smoothly the project runs, how your household functions during the build, and how much stress you experience along the way.
Clear the Work Zones
Before any contractor arrives, clear the rooms and areas that will be affected by the build. This means moving all furniture, fixtures, and personal items out of rooms being stripped or demolished; protecting items in adjacent rooms from dust (construction dust travels further than most homeowners expect); removing carpets and soft furnishings from affected areas; and taking down curtains and blinds from affected windows. Your contractor cannot be responsible for items left in work areas during the build — clear the space properly before work starts.
Make Loft and Roof Spaces Accessible
If you're having a loft conversion or loft works, clear the loft space in advance. Anything stored in the loft — boxes, suitcases, seasonal items — needs to come down before structural work begins. A loft full of stored items on day one is a problem that falls on the homeowner, not the contractor.
Organise Parking for the Build Team
Check your road for parking restrictions that affect large vans or may require contractor permits. Many London boroughs offer temporary contractor parking permits — check your council's website or ask your contractor whether they usually need permits in your area. Where a skip is being used, a skip permit from the council is usually required if the skip is placed on a public road. Your contractor should organise this, but confirm it is in hand before skip delivery.
Sort Your Second-Fix Material Selections Early
If you're supplying your own second-fix materials — tiles, flooring, sanitary ware, light fittings, door furniture — decisions need to be made and items ordered well before they're needed on site. Delayed tile decisions lead to delayed tiling. Delayed flooring orders lead to programme extensions. Make all your material selections in the first weeks of the project, not the last. Ask your contractor for the specific dates by which each material category needs to be on site, and work back from those dates to order lead times.
Arrange Your Living Situation During the Build
For significant projects, particularly those involving the kitchen or bathrooms, plan your living arrangements in advance. If you're staying in the property, set up a temporary kitchen area before your kitchen is disconnected. If you're moving out during the works, confirm where you're going and for how long — and agree with your contractor what they need to do before you can return. Notify neighbours in advance with a brief courtesy note explaining what work is happening and roughly when.
Confirm Utility Disconnections and Reconnections
For projects involving demolition or structural works near utilities, confirm in advance which services need to be isolated and when, plan for any period without heating if works will affect the boiler, and check whether any external services such as internet or phone lines need to be temporarily relocated.
Keep a Project Folder
Start a physical or digital folder for your project before work begins. Include the signed contract, the agreed scope of works, the programme, all written variation approvals, payment receipts, Building Regulations documentation, structural engineer's drawings, and any warranties or product certificates as they arrive. You'll need this folder at completion and potentially years later when you sell the property. RCB Design & Build runs a structured pre-start process to make sure clients and site are ready before work begins. Contact us to discuss your project.