You've got planning permission (or confirmed PD rights), you've signed the contract, and your loft conversion is booked. Now what? The weeks before work starts are an important preparation window — and being well-prepared can help the project run more smoothly from day one.

Here's what to do before your loft conversion team arrives on site.

1. Clear the Loft Completely

This sounds obvious, but it catches people out. Everything in the loft needs to come out before structural work begins — and that includes:

  • Stored boxes, suitcases, and furniture
  • Water tanks and their supports (your plumber will need to relocate or remove the cold water tank as part of the conversion)
  • Old insulation, which will likely be replaced
  • Any historic electrical wiring running through the roof void

Your builder will need unobstructed access to every corner of the loft from day one. Arrange storage elsewhere — a hired storage unit is a popular choice for a project lasting 8–14 weeks.

2. Know Where Your Water Tanks Are

Most London houses built before the 1990s have a cold water header tank in the loft. This needs to be removed as part of the conversion, and your water supply needs to be replumbed — either to a pressurised mains-fed system, or with the tank relocated if there's another suitable void space.

Tell your contractor early whether you have a tank, whether you know the water system (tank-fed vs mains-fed throughout), and whether the boiler is a conventional system or a combi. This affects the M&E specification for the project.

3. Check the Party Wall Position

If your property is terraced or semi-detached, the loft conversion will likely trigger the Party Wall etc. Act 1996. Specifically, any work on or near the shared wall at roof level — including new beams bearing on party walls — requires notice to be served on your neighbours.

You need to serve party wall notice before work starts — not after. Your contractor or a party wall surveyor can help you serve notice correctly. Standard notice period is one month for a party wall notice under Section 2 of the Act.

If your neighbours consent in writing, you can proceed. If they dissent — or don't respond within 14 days — the Act's dispute resolution procedure kicks in and a surveyor (or surveyors) is appointed.

Start this process as early as possible, as delays here can push your start date back.

4. Sort Out Access

Loft conversion work requires scaffold — usually a tower scaffold at the rear and/or side of the property, and often a hoist or materials route through the house itself.

Before work starts, discuss with your contractor:

  • Where scaffold will be erected, and whether any neighbour permissions are needed (for scaffold on or over a shared boundary)
  • How materials will be lifted — through the property or externally
  • Whether neighbours' driveways or gardens will be temporarily affected
  • Parking arrangements for the site team

If you live in a controlled parking zone, contractors may need permits or designated loading bays. Sort this out early.

5. Protect the Floors and Staircase

Structural work in the roof often means materials coming through the house — timber, steel beams, plasterboard. Even with dust sheets, this creates mess and potential damage risk.

Consider:

  • Laying temporary hardboard over finished floors on the route from the front door to the loft hatch
  • Protecting carpets with self-adhesive film (your contractor may do this as standard — check)
  • Agreeing a clear "traffic route" through the house for materials and where tools will be stored overnight

6. Communicate with the Neighbours

A brief, friendly note to your immediate neighbours before work starts goes a long way. Let them know:

  • What you're building and roughly how long it will take
  • What hours the team will be working (typically 7:30am–5pm Monday to Friday in most London boroughs)
  • Who to contact if they have concerns (your contractor's number)

Good neighbourly relations make the project easier for everyone. And if there are party wall notices to serve, this early communication helps set a cooperative tone.

7. Plan Where You'll Live During the Build

A loft conversion is less disruptive than a full renovation — but there will be noise, dust, and the occasional loss of hot water or electricity for short periods. Most families stay in the house throughout. Some prefer to move out during the structural phase (typically the first 2–4 weeks).

Discuss the programme with your contractor, understand which phases are noisiest, and plan accordingly.

At RCB Design & Build, we walk every client through pre-start preparation as part of our onboarding process. We tell you exactly what to expect, when, and what we'll need from you. No surprises.

Ready to start planning your loft conversion? Call 07359 872594 or visit rcbgroup.co.uk.