What Is Included in a Bathroom Renovation?
A bathroom renovation can mean different things depending on the scope. The elements that make up the works:
- **Structural/waterproofing element**:
- •Strip-out (remove existing suite, floor tiles, wall tiles, boards)
- •Tanking/waterproofing the shower area and wet floor
- •Any structural repairs (joist strengthening for heavy tile or stone)
- **First-fix plumbing**:
- •New pipework runs where fittings are repositioning
- •New soil/waste connections for WC, bath, and shower
- •New hot and cold supply pipes in new positions
- **First-fix electrical**:
- •New lighting circuit (downlights, mirror light)
- •Shaving socket / towel rail circuit
- •Extract fan circuit (Part F Building Regulations)
- •Underfloor heating thermostat and circuit
- **Second-fix and finishes**:
- •Wall board or wet plaster (for tileable surface)
- •Wall tiling (labour only — tiles are client-supplied)
- •Floor tiling or specialist floor covering (labour only)
- •Suite installation (bath, WC, basin, shower tray, shower enclosure — client-supplied)
- •Mixer taps, shower head (client-supplied)
- •Mirror, accessories (client-supplied)
- •Ventilation (extract fan installed to Part F)
- •Underfloor heating mat installed
- •Second-fix plumbing (connect all fittings)
- •Second-fix electrical (connect all circuits)
**Note on rcbGroup terms**: second-fix materials — sanitaryware (bath, WC, basin, shower tray), tiles, taps, shower enclosure, mirrors, and accessories — are client-supplied under our standard terms unless specifically agreed otherwise. The costs below cover the building works only.
Bathroom Renovation Costs by Size and Specification (London 2026)
All costs below cover building works only (labour, waterproofing, boards, first-fix plumbing and electrics, tiling labour, suite installation labour). They exclude: tiles, sanitaryware (bath, WC, basin, shower), taps, mirrors, accessories, and VAT.
- **Family bathroom (like-for-like, no layout change)**:
- •Budget specification (same suite position, basic waterproofing, simple tile lay): £4,500–£7,500
- •Mid specification (new board, quality waterproofing, pattern tile lay, new LED lighting): £7,500–£13,000
- •High specification (wet room, large format tile, walk-in shower, UFH, bespoke layout): £13,000–£25,000
- **En-suite shower room (small, 2–3m²)**:
- •Budget specification: £3,500–£6,000
- •Mid specification: £6,000–£10,000
- •High specification: £10,000–£18,000
- **Cloakroom / WC (small, under 2m²)**:
- •Budget: £2,500–£4,500
- •Mid specification: £4,000–£7,000
- •High specification: £7,000–£12,000
- **Master bathroom (larger room, premium spec, separate bath and shower, his-and-hers)**:
- •Mid specification: £15,000–£25,000
- •High specification: £25,000–£45,000+
**Note**: these are 2026 London construction cost estimates based on completed projects and current labour rates. Actual costs for your project will depend on the specific scope, specification, site conditions, and procurement route.
What Drives Bathroom Renovation Cost Up in London?
**1. Layout change (repositioning the WC)**: The WC soil pipe is the most critical drainage element in a bathroom. Moving the WC to a new position on the same wall costs relatively little. Moving it to a different wall — or especially to a position that requires a longer or rerouted soil pipe — can add £1,500–£4,500 in drainage works, particularly if the floor must be opened up to reroute waste pipework.
- **2. Wet room vs. shower enclosure**:
- A wet room (a completely waterproofed, barrier-free shower area) requires:
- •Full room waterproofing (floor and walls to 1.8m minimum)
- •A linear or recessed drain
- •A correctly falls-set floor (all slopes drain to the drain)
- •Specific board and membrane specification
- Wet rooms cost approximately £2,000–£5,000 more than a comparable standard shower enclosure installation.
**3. Underfloor heating**: Electric underfloor heating mats (thermostat, mat, and tile connection) add approximately £600–£1,500 for a typical bathroom. The electrical circuit must be on a separate RCD-protected circuit.
**4. Large format tiles**: Tiles over 600mm × 600mm require more care in laying — walls must be flatter (fewer undulations), more adhesive, and more skill. Expect a 25–50% premium on tiling labour for large format tiles vs. standard format.
**5. Structural repairs to the floor joists**: In Victorian London properties, floor joists under bathrooms are often affected by years of moisture exposure — sometimes with significant rot or woodworm. Discovering and replacing joists adds £300–£800 per joist (labour and material). A survey of the joist condition (by lifting floor boards before stripping) is recommended on older London properties.
**6. Access for plumbing (tight spaces, back-to-wall cisterns)**: Some premium sanitaryware (concealed cisterns, back-to-wall WCs) requires a service duct behind the WC for access. This adds complexity and cost if not factored into the design.
The Tile Budget: Separating Labour from Material
Tiles are one of the most significant variables in a bathroom project — yet one that is entirely in the client's control under rcbGroup's terms, because tiles are client-supplied.
- **Understanding the tile budget**:
- •Large London bathroom (10–14m² of wall tiles + 4m² floor): 14–18m² of wall tiles + 4m² floor tiles
- •Budget tiles (Topps Tiles entry range, B&Q): £10–£30/m²
- •Mid-range tiles (Porcelain Superstore, Tile Giant, Mandarin Stone entry): £30–£80/m²
- •Premium tiles (Mandarin Stone, Stone Tile Company, designer tile suppliers): £80–£250+/m²
- •Natural stone (travertine, marble, limestone): £50–£300+/m²
- For a typical London family bathroom (15m² of wall tiles + 5m² floor):
- •Budget tile spend: £300–£750
- •Mid-range tile spend: £750–£2,250
- •Premium tile spend: £2,250–£10,000+
**Grout and adhesive**: add approximately 15–20% to the tile quantity for grout, adhesive, and waste. These are also client-supplied under rcbGroup standard terms.
**Tip**: order 10–15% more tile than measured to allow for cutting waste and future repairs. Matching tiles from the same batch (same shade code) is important for consistency — tiles from different batches can vary.
- **Sanitaryware cost guide** (client-supplied, for budgeting purposes):
- •Budget suite (WC, basin, bath): £500–£1,200
- •Mid-range suite: £1,200–£3,500
- •Premium suite (Ideal Standard, Laufen, Duravit): £3,500–£12,000
- •Shower enclosure (frameless glass): £500–£3,500
- •Mixer taps: £80–£1,500 per fitting
Frequently Asked Questions
How much does a bathroom renovation cost in London?▼
How long does a bathroom renovation take in London?▼
Do I need planning permission for a bathroom renovation?▼
Why are tiles and sanitaryware client-supplied?▼
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. To talk through your own project, book a project review.