Drainage and Sewers for London Home Extensions in 2025: Build-Over Agreements, Soakaways, and Costs

DRAINAGE is one of the most frequently overlooked cost items in a London home extension project — and one of the most consequential, because a drainage problem discovered late in the project (for example, a COMBINED SEWER running beneath the footprint of the planned extension, or a DEFECTIVE DRAINAGE RUN that must be replaced before the extension can be built over it) can add thousands of pounds of unplanned cost and weeks of programme delay. In LONDON, the drainage context is particularly important for three reasons: the COMBINED SEWER NETWORK (where surface water and foul water run in a single pipe) — managed by THAMES WATER — is widespread in London's Victorian terrace suburbs and runs through many rear gardens and beneath buildings; the LONDON CLAY SUBSOIL makes SOAKAWAYS for surface water disposal impractical in most of inner and outer London (the clay does not drain freely); and THAMES WATER'S BUILD-OVER AGREEMENT PROCESS adds a formal regulatory step that is time-consuming and can affect both programme and project cost. This guide covers DRAINAGE SURVEYS, THAMES WATER BUILD-OVER AGREEMENTS, DRAINAGE CONNECTIONS FOR EXTENSIONS, SURFACE WATER MANAGEMENT, and REALISTIC COSTS IN LONDON IN 2025.

Key Takeaways

  • Drainage surveys, Thames Water build-over agreements, and combined sewer awareness for London extensions in 2025: ALWAYS COMMISSION A CCTV DRAIN SURVEY BEFORE FINALISING THE EXTENSION DESIGN: cost £150-£350; reveals drain run routes and depths, sewer condition, and whether any public sewers cross the planned footprint; DRAINAGE SEARCH (CON29DW) FROM THAMES WATER: cost £20-£60; shows location of public sewers relative to property boundary; many shared drains became public sewers in 2011 (Flood and Water Management Act 2010); COMBINED SEWER (DOMINANT IN LONDON): foul + surface water in same pipe; Thames Water managed; often runs under rear garden at 0.9-1.8m depth; SEPARATE SEWER (OUTER LONDON SUBURBS POST-1950): separate foul and surface water sewers; THAMES WATER BUILD-OVER AGREEMENT — REQUIRED WHEN: extension built over, or foundations within 3m of, a public sewer or adopted lateral drain; INFORMAL BUILD-OVER (≤160mm sewer, ≤3m deep): self-certification by contractor/engineer; fee £150-£300; timescale 4-8 weeks; FORMAL BUILD-OVER AGREEMENT (larger/deeper sewers): legal agreement with Thames Water; application fee £400-£1,500; structural engineer design £500-£2,000; timescale 8-16 weeks; START EARLY — BUILD-OVER CAN DELAY PROJECT START; CONSEQUENCE OF NO BUILD-OVER: Thames Water can require demolition or underpinning; mortgage lenders may refuse to lend; DRAINAGE SEARCH SHOULD BE COMMISSIONED AT THE SAME TIME AS THE STRUCTURAL SURVEY AND BEFORE ARCHITECTURAL DRAWINGS ARE FINALISED.
  • New drainage connections, Part H, surface water management, and drainage costs for London extensions in 2025: PART H BUILDING REGULATIONS — KEY REQUIREMENTS: foul drainage: minimum 100mm pipe; minimum fall 1:40 to 1:80 (25-12mm/m); inspection chamber at every change of direction; trap on every fitting (WC 50mm seal; sink/bath/shower 25-75mm seal); PIPE SIZES: WC: 110mm soil stack and 100mm underground; sink/bath/shower: 40-50mm waste pipe; INSPECTION CHAMBERS: 450×450mm min (internal) for <600mm depth; 450×600mm for 600-1000mm depth; SURFACE WATER MANAGEMENT OPTIONS FOR LONDON EXTENSIONS: soakaway: generally NOT viable in London Clay (percolation test required to confirm); attenuation tank + controlled release: required where planning conditions mandate it; green roof: reduces runoff 40-60%; adds £50-£120/m² to flat roof cost; rainwater harvesting; for most small-medium London extensions: connecting roof downpipe to existing drainage system is acceptable — confirm with LPA planning conditions; DRAINAGE COSTS (TYPICAL LONDON EXTENSION): CCTV survey £150-£350; drainage search £20-£60; informal build-over £150-£450; formal build-over £900-£3,500 total; new drainage runs £50-£100/lm; inspection chambers £200-£600 each; drain relocation £1,500-£5,000+; TOTAL DRAINAGE PACKAGE (TYPICAL SINGLE-STOREY EXTENSION): approximately £2,000-£8,000; THIS IS FREQUENTLY UNDERBUDGETED.
  • Drainage red flags, soakaway testing, and surface water planning for London extensions 2025: RED FLAGS THAT MEAN DRAINAGE WILL COST MORE THAN EXPECTED: (1) combined sewer running under the planned extension footprint (requires build-over agreement + specialist foundations + possible programme delay of 8-16 weeks); (2) defective existing drainage (CCTV shows cracks, root intrusion, or collapse — must be repaired or replaced before new drainage is connected); (3) site in surface water flooding zone (LPA may condition surface water attenuation — attenuation tank adds £1,500-£5,000 to drainage cost); (4) deep sewers (>3m deep combined sewer under footprint requires formal build-over agreement with structural engineer design); (5) tree roots (large trees near the extension footprint may require: arborist report; root barrier; bored pile foundations deeper than typical strip foundations); SOAKAWAY TESTING (BRE 365 PERCOLATION TEST): dig test pit to proposed soakaway depth; fill with water; measure drainage time; if water does not drain within 1 hour: soakaway not viable at this site (London Clay will not drain freely); SOAKAWAY NOT VIABLE IN MOST OF LONDON (especially inner London, clay zones of outer London); CHECKING PLANNING CONDITIONS FOR DRAINAGE: some LPAs require specific drainage management plans as a planning condition on extensions; check BEFORE STARTING DESIGN whether the LPA has standing drainage conditions in the area; GROUND INVESTIGATION: where there is uncertainty about soil type, groundwater level, or tree proximity, a GROUND INVESTIGATION (GI) should be commissioned: approximately £500-£2,000 for a domestic scale GI (trial pits and/or borehole); a GI informs both the foundation design and the soakaway/drainage feasibility.

Drainage surveys, Thames Water build-over agreements, and sewer connections for London extensions in 2025

Drainage surveys, Thames Water build-over agreements, the combined sewer network in London, and how to connect a new extension to the existing drainage system in London in 2025 — with technical detail, compliance requirements, and cost ranges: WHY DRAINAGE IS A CRITICAL EARLY STEP IN A LONDON EXTENSION PROJECT: the DRAINAGE SITUATION beneath a London property is often unknown until a formal survey is carried out; the consequences of not surveying early include: discovering a SEWER OR DRAINAGE RUN beneath the planned extension footprint late in the design process, forcing a redesign; incurring THAMES WATER BUILD-OVER COSTS (surveys, applications, structural requirements) that were not budgeted; finding DEFECTIVE DRAINAGE (cracked or collapsed pipes, root intrusion, misaligned joints) that requires repair or replacement before the extension can be built; DRAINAGE SURVEY (CCTV DRAIN SURVEY) — WHAT IT IS AND WHEN TO DO IT: a CCTV DRAIN SURVEY involves: inserting a small camera into the existing drainage inspection chambers (manholes) and running it through the drainage runs beneath and around the property; the camera records the condition of the pipes (cracks, root intrusion, collapsed sections, displaced joints, silt build-up, tree root penetration); the survey typically includes a DRAINAGE RUN LAYOUT DRAWING showing the routes and depths of the drain runs under and around the property; the survey report identifies any DEFECTS and their severity (the standard survey report classifies defects by type and urgency); WHEN TO COMMISSION A CCTV DRAIN SURVEY: BEFORE THE DESIGN IS FINALISED: ideally the drainage survey should be carried out BEFORE THE ARCHITECTURAL DRAWINGS ARE COMPLETED so that the drainage layout can influence the extension design — if a sewer runs under the planned extension footprint, this can be addressed in the design phase (by RELOCATING THE SEWER or DESIGNING AROUND IT) rather than discovered during construction; AT THE LATEST: before the planning application is submitted or Building Control application is submitted; COST OF A CCTV DRAIN SURVEY IN LONDON IN 2025: approximately £150-£350 for a standard CCTV survey of a residential property (including the survey report and drainage plan); more complex properties (larger properties, multiple manholes, long drainage runs): approximately £250-£600; TYPES OF DRAINAGE IN LONDON — COMBINED SEWER VS SEPARATE SEWER: COMBINED SEWER SYSTEM (DOMINANT IN INNER AND MID LONDON): in a combined sewer system, BOTH FOUL WATER (from WCs, sinks, baths, showers, and kitchen drains) AND SURFACE WATER (rainwater from roofs and paved areas) run in the SAME PIPE; this pipe is a PUBLIC SEWER maintained by THAMES WATER; the combined sewer in residential areas of London typically runs under the rear garden (USUALLY AT A DEPTH OF 0.9-1.8M), frequently in the same line as the rear garden path or along the rear of the properties; the combined sewer discharges to a larger district sewer and eventually to Thames Water's SEWAGE TREATMENT WORKS; SEPARATE SEWER SYSTEM (MORE COMMON IN OUTER LONDON SUBURBS — POST-1950 DEVELOPMENTS): in a separate system, FOUL WATER and SURFACE WATER run in SEPARATE PIPES: the FOUL SEWER carries sewage to the treatment works; the SURFACE WATER SEWER (or WATERCOURSE CONNECTION) carries rainwater to a local river, stream, or watercourse; WHY THIS MATTERS FOR A LONDON EXTENSION: IF THE PROPERTY HAS A COMBINED SEWER: any surface water generated by the new extension (rainwater from the new flat roof) must be carefully managed; IN MANY LONDON BOROUGHS, THAMES WATER AND THE PLANNING AUTHORITY REQUIRE THAT NEW SURFACE WATER FROM EXTENSIONS IS NOT CONNECTED TO THE COMBINED SEWER (to reduce the risk of combined sewer overflow during heavy rainfall events); instead, surface water must be managed on-site (SOAKAWAY — if the ground conditions allow) or CONNECTION TO THE SURFACE WATER SEWER (if a separate surface water sewer is available); IN LONDON'S LONDON CLAY ZONES (MOST OF INNER AND OUTER LONDON), SOAKAWAYS ARE GENERALLY IMPRACTICAL because the clay soil does not drain freely — surface water pools at the bottom of a soakaway rather than dispersing; IN THIS CASE: SURFACE WATER MUST BE: attenuated on-site (RAINWATER HARVESTING TANK or ATTENUATION TANK — the water is stored temporarily and released to the sewer at a controlled rate); or discharged to a surface water sewer if one is available; THAMES WATER BUILD-OVER AGREEMENT — WHEN IS ONE REQUIRED? A THAMES WATER BUILD-OVER AGREEMENT IS REQUIRED WHEN: the proposed extension will be BUILT OVER OR WITHIN 3M OF A PUBLIC SEWER or lateral drain (a drain from the property to the public sewer that was adopted under the Water Industry Act 1991 — LATERAL DRAINS WERE ADOPTED BY SEWERAGE UNDERTAKERS FROM JULY 2011 UNDER THE FLOOD AND WATER MANAGEMENT ACT 2010); NOTE: the definition of a PUBLIC SEWER changed in 2011 when many formerly private shared drains became public sewers — this means that many drainage runs in London that the homeowner considers a private drain may now in fact be a public sewer; a DRAINAGE SEARCH (available from Thames Water for approximately £20-£60) shows the location of public sewers relative to the property; HOW TO FIND OUT IF A PUBLIC SEWER RUNS UNDER OR NEAR THE PLANNED EXTENSION: DRAINAGE SEARCH FROM THAMES WATER (DRAINAGE AND WATER ENQUIRY — CON29DW): this search shows the location of Thames Water's public sewers relative to the property boundary; it is typically carried out as part of the conveyancing searches when a property is purchased; if you do not have a current search, you can commission one from Thames Water directly (approximately £20-£60 for a residential search); the search shows whether there is a public sewer within 3m of the property and whether the property is at risk of surface water flooding; CCTV SURVEY: the CCTV survey should trace all drain runs to manholes and identify which runs are public sewers and which are private drains; THAMES WATER BUILD-OVER AGREEMENT PROCESS: INFORMAL BUILD-OVER (FOR DRAINS OF 160MM DIAMETER OR LESS AT DEPTHS OF 3M OR LESS AND WHERE THE PROPOSAL MEETS THAMES WATER'S STANDARD CONDITIONS): some build-over applications can be handled via an INFORMAL OR SELF-CERTIFICATION PROCESS — the contractor or engineer certifies that the building over the sewer complies with Thames Water's standard requirements; the standard requirements typically include: MINIMUM FOUNDATION CLEARANCE from the sewer (typically the sewer must be protected from foundation loads by a minimum distance); USE OF REINFORCED CONCRETE FOUNDATIONS (strip or raft) to span over the sewer and distribute loads; ACCESS MANHOLE (or equivalent) maintained within the built-over section; FORMAL BUILD-OVER AGREEMENT (FOR LARGER OR DEEPER SEWERS — TYPICALLY DIAMETERS ABOVE 160MM OR DEPTHS GREATER THAN 3M): a formal build-over agreement is a legal agreement between the building owner and Thames Water; the process involves: application to Thames Water; Thames Water issues a BUILD-OVER AGREEMENT APPLICATION PACK; structural engineer designs the foundation solution to protect the sewer; Thames Water reviews and approves the structural design; build-over agreement is issued; the works proceed; Thames Water carries out a POST-CONSTRUCTION CCTV SURVEY (to confirm the sewer has not been damaged during construction); TIMESCALES: INFORMAL BUILD-OVER: typically 4-8 weeks; FORMAL BUILD-OVER AGREEMENT: typically 8-16 weeks; THAMES WATER BUILD-OVER COSTS IN LONDON 2025: DRAINAGE SEARCH: approximately £20-£60; PRE-APPLICATION ENQUIRY (OPTIONAL BUT USEFUL): approximately £200-£500; INFORMAL BUILD-OVER (ASSESSMENT FEE): approximately £150-£300; FORMAL BUILD-OVER AGREEMENT APPLICATION FEE: approximately £400-£1,500 depending on complexity; STRUCTURAL ENGINEER DESIGN FOR SEWER PROTECTION (ADDITIONAL TO BUILD-OVER FEE): approximately £500-£2,000; TOTAL BUILD-OVER COSTS (TYPICAL LONDON EXTENSION): approximately £700-£4,000.

Drainage connections for extensions, surface water management, Part H, and drainage costs in London 2025

How to connect a new extension to the existing drainage system, surface water management options, Part H Building Regulations for drainage, and realistic drainage costs for London home extensions in 2025: NEW DRAINAGE CONNECTIONS FOR A LONDON EXTENSION — THE CHOICES AND REQUIREMENTS: when a new extension is added to a London Victorian terrace, new drainage connections are typically required for: NEW FOUL WATER FROM THE EXTENSION (kitchen sink, WC, shower, utility room): the new drainage must be connected to the existing foul drainage system of the property, which ultimately connects to the public sewer; the connection should be made via an INSPECTION CHAMBER (manhole) or via a JUNCTION (branch) into an existing drain run; in all cases, the new drainage runs must comply with PART H OF THE BUILDING REGULATIONS (Drainage and Waste Disposal); NEW SURFACE WATER FROM THE EXTENSION ROOF: the rainwater from the new flat roof or pitched roof of the extension must be managed — the options are: CONNECTION TO THE COMBINED SEWER (where there is no separate surface water sewer and a soakaway is not viable — as is the case in most of London's clay subsoil): connection is permissible in some cases where the additional surface water load is limited (a small extension adding relatively little impermeable surface area); however, THAMES WATER AND MANY LONDON PLANNING AUTHORITIES ARE INCREASINGLY REQUIRING ATTENUATION FOR ANY NEW SURFACE WATER CONNECTIONS to reduce combined sewer overflow events during heavy rainfall; SUSTAINABLE DRAINAGE SYSTEMS (SuDS): Part H and the LEAD LOCAL FLOOD AUTHORITY (LLFA) guidance requires that new developments (including home extensions) MANAGE SURFACE WATER ON-SITE where practicable; SuDS options for London gardens include: PERMEABLE PAVING (for any new external paving areas — allowing rainfall to infiltrate rather than run off); GREEN ROOF (a sedum or wildflower green roof on the flat extension roof — reduces surface water runoff by retaining rainfall in the growing medium — typically retains 40-60% of rainfall volume); RAINWATER HARVESTING TANK (collects roof runoff for garden irrigation or toilet flushing — reduces the volume discharged to the sewer); ATTENUATION TANK (a buried tank that collects roof runoff and releases it to the sewer at a controlled rate — the controlled rate is typically the pre-development runoff rate — for a small London extension this is a very small flow); FOR MOST LONDON HOME EXTENSIONS (UNDER 50M² OF NEW IMPERVIOUS SURFACE AREA): attenuation is typically not required unless specifically required by the planning authority or Thames Water; a simple RAINWATER DOWNPIPE from the new roof connecting to the existing drainage system is typically acceptable; FOR LARGER EXTENSIONS OR EXTENSIONS IN AREAS WITH SURFACE WATER FLOODING RISK: attenuation or SuDS measures may be required — check with the local planning authority's drainage officer; PART H BUILDING REGULATIONS — KEY REQUIREMENTS FOR DRAINAGE: PIPE SIZES: minimum 100mm diameter for foul drainage (carrying WC waste); minimum 75mm diameter for waste drainage (sinks, baths, showers — referred to as ABOVE-GROUND DRAINAGE or WASTE SYSTEMS); WHY MINIMUM 100MM FOR WC: solid waste from a WC requires a minimum 100mm (4 inch) diameter drain to prevent blockage; MINIMUM GRADIENTS: FOUL WATER DRAINS (100MM DIAMETER): minimum FALL (gradient) of 1:40 (25mm per metre) for a 100mm drain carrying WC waste where flow volume is low; minimum 1:80 (12mm per metre) where the flow is higher (more WCs contributing); WASTE PIPES (75MM DIAMETER — SINK, BATH, SHOWER): minimum fall of 1:44 (approximately 22mm per metre) for 75mm pipes; IN PRACTICE: the steeper the fall within acceptable limits, the better — but EXCESSIVELY STEEP GRADIENTS CAUSE SELF-SIPHONAGE (the liquid rushes away too fast, leaving solids behind and causing blockages); INSPECTION CHAMBERS (MANHOLES): at EVERY CHANGE OF DIRECTION (bend or junction), an INSPECTION CHAMBER must be provided to allow inspection and clearance of blockages; this is a BUILDING REGULATIONS REQUIREMENT (Part H); minimum internal plan size of an inspection chamber: 450mm × 450mm (for depth up to 600mm); for deeper manholes (600mm-1000mm): 450mm × 600mm; GROUND-LEVEL INSPECTION CHAMBERS: typically plastic half-round channel and branches inside a precast concrete or plastic chamber ring; INSPECTION CHAMBER COVERS: to be of GRADE MATCHED TO THE LOADING (for a garden path: Class A15/B125 cast iron or composite cover; for a driveway: Class B125 or C250); ABOVE-GROUND DRAINAGE (WASTE PIPES — INSIDE THE BUILDING): the drainage pipes from sinks, baths, showers, and WCs within the extension run inside the building before connecting to the underground drainage outside; these must comply with the TRAP requirements of Part H: every fitting (sink, bath, shower, WC) must have a TRAP (U-bend) to maintain a WATER SEAL that prevents sewer gases from entering the building; MINIMUM TRAP DEPTHS: WC trap seal: 50mm; sink, bath, and shower trap seal: 25mm minimum (75mm for appliances within 3m of a soil stack where self-siphonage risk exists); SINGLE STACK DRAINAGE (COMMON IN LONDON VICTORIAN TERRACES): many London Victorian terraces use a SINGLE STACK drainage arrangement — all WC, sink, bath, and shower waste connects to a SINGLE SOIL STACK (the 110mm diameter pipe that runs vertically inside or on the outside of the rear wall and discharges to the underground drainage); in an extension, the new foul drainage must be connected either: to the EXISTING SINGLE STACK (if it is correctly positioned and has adequate capacity); or via a NEW SOIL STACK (a new 110mm vertical stack run to the underground drainage); DRAINAGE COSTS FOR LONDON EXTENSIONS IN 2025: CCTV DRAIN SURVEY: approximately £150-£350; DRAINAGE SEARCH (THAMES WATER — CON29DW OR EQUIVALENT): approximately £20-£60; THAMES WATER BUILD-OVER AGREEMENT (INFORMAL): approximately £150-£450; THAMES WATER FORMAL BUILD-OVER AGREEMENT (FORMAL — LARGER SEWER): approximately £400-£1,500 application + £500-£2,000 structural engineer design = £900-£3,500 total; NEW UNDERGROUND DRAINAGE (SINGLE EXTENSION — TYPICAL SCOPE): EXCAVATION AND LAYING OF NEW DRAINAGE RUNS (100MM PIPE, GRANULAR BEDDING, SELECTED FILL): approximately £50-£100 per lm installed (labour and materials); INSPECTION CHAMBERS (STANDARD 450MM DIAMETER PLASTIC CHAMBER): approximately £200-£600 per chamber (supply and install — depending on depth and cover specification); CONNECTING TO EXISTING DRAIN RUNS (BREAKING INTO EXISTING DRAIN AND INSTALLING JUNCTION): approximately £300-£800; RELOCATION OF EXISTING DRAIN RUNS (WHERE A DRAIN MUST BE MOVED TO CLEAR THE EXTENSION FOOTPRINT): approximately £1,500-£5,000+ (depending on length, depth, and whether Thames Water consent is required); TOTAL DRAINAGE COST (TYPICAL SINGLE-STOREY LONDON EXTENSION — MODERATE COMPLEXITY): approximately £2,000-£8,000 (including survey, any build-over costs, new drainage runs, and inspection chambers); THIS IS OFTEN UNDERESTIMATED IN PROJECT BUDGETS.

Frequently Asked Questions

What is a Thames Water build-over agreement and when do I need one for a London extension?
THAMES WATER BUILD-OVER AGREEMENT — WHAT IT IS AND WHEN YOU NEED ONE: WHAT IT IS: a Thames Water build-over agreement is a formal agreement between the building owner and Thames Water that permits the construction of a building or extension over or within 3m of a public sewer; the agreement sets out the structural requirements (how the foundations must be designed to protect the sewer from loads and damage) and requires Thames Water to carry out a post-construction CCTV survey to confirm the sewer has not been damaged; WHEN IT IS REQUIRED: whenever the planned extension will be BUILT OVER or will have FOUNDATIONS WITHIN 3M OF A PUBLIC SEWER or adopted lateral drain; since 2011, many previously private shared drains have become public sewers — check the position via a DRAINAGE SEARCH (CON29DW or equivalent) from Thames Water (approximately £20-£60); the drainage survey will also help identify whether any drain runs cross the planned extension footprint; TYPES OF AGREEMENT: INFORMAL BUILD-OVER (self-certification): for smaller sewers (≤160mm diameter, ≤3m deep) where Thames Water's standard structural conditions can be met — the building contractor or engineer certifies compliance; fee approximately £150-£300; FORMAL BUILD-OVER AGREEMENT: for larger or deeper sewers, or where the standard conditions cannot be met — a formal legal agreement with Thames Water; application fee approximately £400-£1,500 + structural engineer fees £500-£2,000; TIMESCALES: informal: 4-8 weeks; formal: 8-16 weeks — start early; CONSEQUENCE OF NOT HAVING A BUILD-OVER AGREEMENT: Thames Water can require the building to be demolished or underpinned at the building owner's cost; also a mortgage lender may refuse to lend against a property where a build-over exists without the formal agreement.
How should surface water from a new London extension be managed?
SURFACE WATER MANAGEMENT FOR A LONDON HOME EXTENSION IN 2025: THE PROBLEM WITH LONDON'S COMBINED SEWER NETWORK: most of inner and outer London is served by a COMBINED SEWER SYSTEM — where both foul (sewage) and surface water (rainwater) run in the same pipe; when heavy rainfall saturates this system, COMBINED SEWER OVERFLOWS (CSOs) discharge diluted sewage into the River Thames and its tributaries — a serious environmental problem that Thames Water and the planning authorities want to reduce; WHAT THIS MEANS FOR A LONDON EXTENSION: the planning authority and Thames Water are increasingly requiring that NEW SURFACE WATER FROM EXTENSIONS IS NOT CONNECTED TO THE COMBINED SEWER WITHOUT SOME ATTENUATION; OPTIONS FOR SURFACE WATER MANAGEMENT: (1) SOAKAWAY: requires free-draining subsoil — impractical in most of London (clay does not drain freely); a percolation test (BRE 365 soakaway test) can confirm whether a soakaway will work at the specific site; (2) ATTENUATION TANK + CONTROLLED RELEASE: a buried tank collects roof runoff and releases it to the combined sewer at the pre-development runoff rate — manages peak flows; required where the planning authority conditions surface water attenuation; typically only required for larger extensions or sites with surface water flooding risk; (3) GREEN ROOF: a sedum green roof on the flat extension roof reduces runoff by retaining 40-60% of rainfall in the growing medium; acceptable to both the planning authority and Thames Water as a surface water management measure; adds approximately £50-£120/m² to the flat roof cost; (4) RAINWATER HARVESTING: collecting roof runoff in a tank for garden irrigation or toilet flushing; reduces the volume discharged to the sewer; for most small-to-medium London extensions (flat roof under 30m²), connecting the downpipe from the new extension roof to the existing drainage system (combined or separate sewer) is acceptable without attenuation — but always confirm with the local planning authority's drainage conditions before assuming this.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.