RICS Condition Report (Level 1)
THE RICS CONDITION REPORT (ALSO CALLED LEVEL 1 SURVEY UNDER THE RICS HOME SURVEYS STANDARD 2019) IS THE MOST BASIC FORM OF RICS SURVEY — A TRAFFIC-LIGHT (RED / AMBER / GREEN) RATING OF THE MAIN COMPONENTS OF A PROPERTY — WITH BRIEF NOTES ON CONDITION AND NO COST ESTIMATES.
WHAT A LEVEL 1 CONDITION REPORT COVERS: EXTERNAL FABRIC (CHIMNEY STACKS, ROOF COVERINGS, FLASHINGS, GUTTERS AND RAINWATER PIPES, MAIN WALLS, WINDOWS AND EXTERNAL DOORS); INTERNAL FABRIC (ROOF STRUCTURE, CEILINGS, INTERNAL WALLS AND PARTITIONS, FLOORS, BUILT-IN FITTINGS, BATHROOMS, KITCHEN AND UTILITY, FIREPLACES); SERVICES (ELECTRICITY, GAS/OIL HEATING, WATER AND SANITATION, DRAINAGE); GROUNDS (GARAGE, OUTBUILDINGS, BOUNDARIES, PATHS, PAVED AREAS); EACH ELEMENT IS RATED CONDITION 1 (NO SIGNIFICANT REPAIR NEEDED), CONDITION 2 (REPAIRS OR REPLACEMENT NEEDED — NOT URGENT), OR CONDITION 3 (URGENT REPAIRS OR REPLACEMENT NEEDED); WHAT A LEVEL 1 DOES NOT COVER: NO COST ESTIMATES; NO RECOMMENDATIONS FOR FURTHER INVESTIGATION; NO DETAILED ADVICE ON DEFECTS; NO STRUCTURAL ASSESSMENT; DOES NOT IDENTIFY HIDDEN DEFECTS BEHIND FINISHES OR BELOW FLOORS — THE SURVEYOR DOES NOT LIFT FLOORBOARDS, OPEN MANHOLES, PROBE SUSPECTED DAMP AREAS, OR ACCESS ROOF SPACES BEYOND A HEAD-AND-SHOULDERS INSPECTION. FOR A LONDON VICTORIAN TERRACE: A LEVEL 1 CONDITION REPORT IS GENERALLY NOT RECOMMENDED — IT IS NOT SUFFICIENTLY DETAILED FOR A 100-150-YEAR-OLD PROPERTY WITH THE COMPLEXITY OF DEFECTS TYPICAL OF VICTORIAN TERRACE CONSTRUCTION — A LEVEL 2 HOMEBUYER REPORT OR (BETTER) A LEVEL 3 BUILDING SURVEY IS THE MINIMUM APPROPRIATE SURVEY FOR A VICTORIAN TERRACE.
RICS HomeBuyer Report (Level 2) vs Building Survey (Level 3)
THE RICS HOMEBUYER REPORT (LEVEL 2 SURVEY UNDER RICS HOME SURVEYS STANDARD 2019 — ALSO KNOWN AS HOMEBUYER SURVEY) AND THE RICS BUILDING SURVEY (LEVEL 3 SURVEY — FORMERLY KNOWN AS THE FULL STRUCTURAL SURVEY) ARE THE TWO MAIN SURVEY OPTIONS APPROPRIATE FOR A LONDON VICTORIAN TERRACE.
RICS HOMEBUYER REPORT / LEVEL 2 SURVEY (A STANDARD-FORMAT REPORT — CONDITION RATINGS PLUS BRIEF COMMENTS ON SIGNIFICANT MATTERS — SURVEYOR INSPECTS ACCESSIBLE AREAS ONLY — DOES NOT OPEN UP AREAS FOR INSPECTION): WHAT IT COVERS: ALL ELEMENTS OF THE LEVEL 1 CONDITION REPORT PLUS BRIEF DESCRIPTIVE COMMENTS ON DEFECTS RATED CONDITION 2 OR 3 — AND A VALUATION (IF REQUESTED — HOMEBUYER REPORT WITH VALUATION IS THE MOST COMMON FORM); WHAT IT DOES NOT COVER: DOES NOT INVESTIGATE CONCEALED OR SUSPECTED DEFECTS IN DEPTH — THE SURVEYOR NOTES THAT FURTHER INVESTIGATION BY A SPECIALIST IS RECOMMENDED (FOR EXAMPLE: 'DAMPNESS WAS DETECTED IN THE BASEMENT EXTERNAL WALL — FURTHER INVESTIGATION BY A SPECIALIST CONTRACTOR IS RECOMMENDED') BUT DOES NOT IDENTIFY THE CAUSE OR EXTENT OF THE DEFECT; NO COST ESTIMATES FOR REPAIR; SUITABLE FOR: A RELATIVELY MODERN PROPERTY (POST-1950) IN GOOD OR AVERAGE CONDITION — OR A VICTORIAN TERRACE THAT HAS BEEN RECENTLY RENOVATED AND IS IN GOOD APPARENT CONDITION WITH NO OBVIOUS MAJOR DEFECTS VISIBLE; RICS BUILDING SURVEY / LEVEL 3 SURVEY (A BESPOKE, COMPREHENSIVE, DETAILED SURVEY — THE MOST THOROUGH SURVEY AVAILABLE FROM AN RICS SURVEYOR): WHAT IT COVERS: A THOROUGH INSPECTION OF ALL ACCESSIBLE AREAS — THE SURVEYOR IS EXPECTED TO INVESTIGATE, PROBE, AND TEST SUSPECTED DEFECTS (USING A DAMP METER, A LADDER TO ACCESS THE LOFT, OPENING INSPECTION COVERS — BUT NOT DESTRUCTIVE OPENING UP OF FINISHES) — DETAILED DESCRIPTION OF ALL DEFECTS FOUND — ASSESSMENT OF THE LIKELY CAUSE OF DEFECTS — PRIORITISED RECOMMENDATIONS FOR REPAIR — ESTIMATED COSTS FOR REPAIR WHERE POSSIBLE; THE SURVEYOR ALSO ADVISES ON: POTENTIAL PROBLEM AREAS THAT CANNOT BE FULLY ASSESSED FROM AN ACCESSIBLE INSPECTION (FOR EXAMPLE: THE CONDITION OF THE DRAINS — WHICH REQUIRES A CCTV DRAIN SURVEY — OR THE CONDITION BEHIND RECENTLY APPLIED FINISHES) — AND RECOMMENDS SPECIALIST INVESTIGATIONS WHERE RELEVANT; FOR A LONDON VICTORIAN TERRACE: A LEVEL 3 BUILDING SURVEY IS STRONGLY RECOMMENDED — PARTICULARLY WHERE: THE PROPERTY IS UNMODERNISED OR PARTLY MODERNISED; THE PROPERTY HAS OBVIOUS STRUCTURAL MOVEMENT (CRACKING, LINTELS, SETTLEMENT); ANY EVIDENCE OF DAMP, DRAINAGE ISSUES, OR PREVIOUS FLOODING; THE PROPERTY HAS A BASEMENT, CELLAR, OR LOWER GROUND FLOOR; ANY SIGNIFICANT EXTENSION, CONVERSION, OR ALTERATION HAS BEEN CARRIED OUT; THE BUYER INTENDS TO RENOVATE OR EXTEND THE PROPERTY.
Structural Engineer's Report
A STRUCTURAL ENGINEER'S REPORT IS A SEPARATE AND SPECIALIST ASSESSMENT (NOT PART OF AN RICS SURVEY) — CARRIED OUT BY A CHARTERED STRUCTURAL ENGINEER (MIStructE OR CEng — MEMBER OF THE INSTITUTION OF STRUCTURAL ENGINEERS OR CHARTERED ENGINEER STATUS) — AND IS APPROPRIATE WHERE A SPECIFIC STRUCTURAL CONCERN HAS BEEN IDENTIFIED DURING THE RICS SURVEY OR THE BUYER'S OWN INSPECTION.
WHEN IS A STRUCTURAL ENGINEER RECOMMENDED: (1) SIGNIFICANT CRACKS IN WALLS — PARTICULARLY DIAGONAL CRACKS RUNNING FROM WINDOW/DOOR CORNERS (INDICATIVE OF DIFFERENTIAL SETTLEMENT OR HEAVE — ESPECIALLY RELEVANT IN LONDON CLAY WHICH IS PARTICULARLY PRONE TO SEASONAL SHRINK-SWELL MOVEMENT); STAIR-STEP CRACKS IN BRICKWORK (MORTAR JOINT CRACKING — INDICATIVE OF DIFFERENTIAL MOVEMENT OF TWO ADJACENT STRUCTURAL ELEMENTS); HORIZONTAL CRACKS IN BRICKWORK (POTENTIALLY SERIOUS — INDICATIVE OF WALL LEANING, ARCH FAILURE, OR LINTEL FAILURE); (2) EVIDENCE OF STRUCTURAL ALTERATIONS — WALLS REMOVED, BEAMS INSTALLED, STRUCTURAL OPENINGS FORMED — WHERE THE BUYER CANNOT CONFIRM THAT STRUCTURAL ENGINEERING ADVICE WAS OBTAINED AND BUILDING CONTROL SIGNED OFF; (3) VISIBLE STRUCTURAL DEFLECTION — SAGGING FLOOR BOARDS, LINTELS WITH VISIBLE DEFLECTION, ARCHES THAT HAVE MOVED; (4) CHIMNEY STACK OR BREAST ISSUES — TILTED OR BULGING CHIMNEY STACK, CHIMNEY BREAST PREVIOUSLY REMOVED — ADEQUACY OF THE STRUCTURAL BEAM ABOVE IS UNKNOWN; (5) NEIGHBOURING BASEMENT CONVERSION — IF THE NEIGHBOURING PROPERTY HAS RECENTLY HAD A BASEMENT CONVERSION (UNDERPINNING ADJACENT TO THE PARTY WALL) — THIS CAN CAUSE SETTLEMENT IN THE SUBJECT PROPERTY; STRUCTURAL ENGINEER'S REPORT SCOPE: A STRUCTURAL ENGINEER INSPECTS THE PROPERTY AND PRODUCES A WRITTEN REPORT ON THE STRUCTURAL CONCERNS IDENTIFIED — TYPICALLY INCLUDING: DESCRIPTION AND CLASSIFICATION OF CRACKS (BRE DIGEST 251 CRACK CLASSIFICATION — CATEGORY 0-5 BASED ON CRACK WIDTH AND PATTERN); ASSESSMENT OF CAUSE; RECOMMENDATION (MONITOR ONLY / FURTHER INVESTIGATION REQUIRED / REMEDIAL WORKS RECOMMENDED — WITH OUTLINE SCOPE OF WORKS); COST (LONDON 2025 — STRUCTURAL ENGINEER INSPECTION AND WRITTEN REPORT — TYPICAL LONDON RESIDENTIAL PROPERTY): APPROXIMATELY £400-900.
CCTV Drain Survey, Asbestos Survey, and Electrical Test
IN ADDITION TO THE RICS SURVEY AND ANY STRUCTURAL ENGINEER'S REPORT, THE FOLLOWING SPECIALIST SURVEYS ARE STRONGLY RECOMMENDED FOR A LONDON VICTORIAN TERRACE PRE-PURCHASE — PARTICULARLY FOR OLDER, UNMODERNISED, OR PARTLY RENOVATED PROPERTIES.
CCTV DRAIN SURVEY: A CLOSED-CIRCUIT TELEVISION DRAIN SURVEY (CCTV SURVEY — WHERE A SMALL CAMERA MOUNTED ON A REMOTE-CONTROLLED TRACK IS INSERTED INTO THE DRAIN NETWORK AND PUSHED THROUGH THE DRAINAGE PIPES — RECORDING VIDEO FOOTAGE OF THE INTERNAL CONDITION OF THE PIPES) IS THE ONLY WAY TO RELIABLY ASSESS THE CONDITION OF THE BELOW-GROUND DRAINAGE OF A LONDON VICTORIAN TERRACE: STANDARD RICS HOME SURVEYS (LEVEL 1, 2, AND 3) DO NOT INCLUDE A CCTV DRAIN SURVEY — THEY ASSESS DRAINS ONLY BY VISUAL INSPECTION OF ACCESSIBLE MANHOLE COVERS AND GULLIES — NOT THE BURIED PIPE RUNS; CCTV REVEALS: PIPE COLLAPSE OR DEFORMATION; ROOT INTRUSION (COMMON IN LONDON WHERE VICTORIAN CLAY PIPES HAVE OPEN JOINTS AT EVERY BRICK LENGTH ALLOWING TREE ROOTS TO ENTER); JOINT DISPLACEMENT (LONDON CLAY SEASONAL MOVEMENT); SULPHATE ATTACK ON CONCRETE PIPES; MISCONNECTIONS (SURFACE WATER INCORRECTLY CONNECTED TO FOUL SEWER OR VICE VERSA); COST: APPROXIMATELY £200-400 (PRE-PURCHASE CCTV DRAIN SURVEY — LONDON — SPECIALIST DRAINAGE CONTRACTOR — SEE DRAINAGE SURVEY GUIDE). ASBESTOS SURVEY: ASBESTOS CONTAINING MATERIALS (ACMS) WERE WIDELY USED IN UK CONSTRUCTION FROM THE 1940S TO 1999 (WHEN CHRYSOTILE WHITE ASBESTOS WAS FINALLY BANNED IN THE UK — BLUE AND BROWN ASBESTOS WERE BANNED IN 1985 AND 1986 RESPECTIVELY) — IN A LONDON VICTORIAN TERRACE, ACMS ARE MOST LIKELY TO BE FOUND IN: FLOOR TILES (VINYL FLOOR TILES — 9-INCH X 9-INCH THERMOPLASTIC FLOOR TILES IN KITCHENS AND HALLWAYS FROM THE 1950S-1970S — LIKELY ACM); TEXTURED COATINGS (ARTEX AND SIMILAR TEXTURED CEILING AND WALL COATINGS — ARTEX APPLIED BEFORE 1984 HAS A HIGH PROBABILITY OF CONTAINING CHRYSOTILE ASBESTOS); PIPE LAGGING (ASBESTOS INSULATION ON HOT WATER PIPES — MORE COMMON IN COMMERCIAL PROPERTIES BUT PRESENT IN SOME RESIDENTIAL PROPERTIES WITH OLDER HEATING SYSTEMS); A PRE-PURCHASE ASBESTOS SURVEY (RICS-STANDARD MANAGEMENT SURVEY — FORMERLY TYPE 2) IDENTIFIES SUSPECTED ACMS AND TAKES SAMPLES FOR LABORATORY ANALYSIS; COST: APPROXIMATELY £200-500 (PRE-PURCHASE MANAGEMENT ASBESTOS SURVEY — LONDON VICTORIAN TERRACE). ELECTRICAL INSTALLATION CONDITION REPORT (EICR): THE EICR IS THE STANDARD DOCUMENT FOR ASSESSING THE SAFETY OF AN EXISTING ELECTRICAL INSTALLATION — CARRIED OUT BY A REGISTERED ELECTRICIAN (NICEIC OR NAPIT REGISTERED) — IDENTIFIES: DATED WIRING (RUBBER-INSULATED CABLES — PRE-1960S — HIGH RISK IF STILL IN PLACE — SHOULD BE FULLY REWIRED); EARTHING AND BONDING DEFICIENCIES; CIRCUIT PROTECTION ISSUES; COST: APPROXIMATELY £150-400 (EICR FOR A TYPICAL LONDON VICTORIAN TERRACE 3-4 BEDROOM PROPERTY).
Pre-Purchase Survey Costs and Value
PRE-PURCHASE SURVEY COSTS (LONDON 2025 — APPROXIMATE RANGE — SURVEYING COSTS VARY WITH PROPERTY SIZE, SURVEYOR, AND SURVEY TYPE).
RICS LEVEL 1 CONDITION REPORT: APPROXIMATELY £300-500 (LONDON — SMALL 2-BEDROOM VICTORIAN TERRACE) TO £500-800 (LARGER 4-5 BEDROOM TERRACE); NOT RECOMMENDED FOR VICTORIAN TERRACES — SEE ABOVE. RICS LEVEL 2 HOMEBUYER REPORT (WITH VALUATION): APPROXIMATELY £500-900 (2-3 BEDROOM VICTORIAN TERRACE LONDON) TO £800-1,400 (4-5 BEDROOM LARGER TERRACE); APPROPRIATE FOR: RECENTLY RENOVATED VICTORIAN TERRACE IN GOOD APPARENT CONDITION WITH NO OBVIOUS MAJOR DEFECTS. RICS LEVEL 3 BUILDING SURVEY (NO VALUATION): APPROXIMATELY £700-1,200 (2-3 BEDROOM VICTORIAN TERRACE LONDON) TO £1,000-2,000 (LARGER 4-5 BEDROOM TERRACE); APPROPRIATE FOR: ALL UNMODERNISED, PARTLY RENOVATED, OR EXTENDED VICTORIAN TERRACES — STRONGLY RECOMMENDED FOR ANY VICTORIAN TERRACE IN LONDON. STRUCTURAL ENGINEER'S REPORT (WHERE STRUCTURAL CONCERNS IDENTIFIED): APPROXIMATELY £400-900 (INSPECTION AND WRITTEN REPORT — LONDON — CHARTERED STRUCTURAL ENGINEER). CCTV DRAIN SURVEY: APPROXIMATELY £200-400. ASBESTOS MANAGEMENT SURVEY: APPROXIMATELY £200-500. EICR (ELECTRICAL INSTALLATION CONDITION REPORT): APPROXIMATELY £150-400. FULL PRE-PURCHASE DUE DILIGENCE PACKAGE (LEVEL 3 BUILDING SURVEY + CCTV DRAIN SURVEY + EICR + ASBESTOS SURVEY): APPROXIMATELY £1,300-3,300 TOTAL (FOR A TYPICAL 3-4 BEDROOM LONDON VICTORIAN TERRACE). CONTEXT ON VALUE: A LEVEL 3 BUILDING SURVEY THAT IDENTIFIES A DEFECTIVE ROOF (ESTIMATED COST £15,000-25,000 TO RESLATE), A FAILED DRAINAGE SYSTEM (£5,000-15,000 FOR CIPP RELINING), AND AN ELECTRICAL REWIRE REQUIREMENT (£5,000-12,000) WILL TYPICALLY ENABLE THE BUYER TO RENEGOTIATE THE PURCHASE PRICE BY MORE THAN THE COST OF ALL PRE-PURCHASE SURVEYS COMBINED — OR TO WITHDRAW FROM A PURCHASE THAT WOULD HAVE BEEN SERIOUSLY PROBLEMATIC.
Frequently Asked Questions
What type of survey should I get for a Victorian terrace in London?▼
What is the difference between a HomeBuyer Report and a Building Survey?▼
Does a survey include checking the drains?▼
What are the most common defects found in London Victorian terraces?▼
How much does a pre-purchase survey cost in London?▼
Important Note
This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.