⭐ 9.96/10 Checkatrade · 114+ Reviews
📞 07359 872594
Planning & Regulations2 min read

What Drawings Do You Need for a Planning Application in London?

A planning application for a house extension, loft conversion, or change of use in London requires a specific set of drawings — and a poorly prepared drawing package is one of the most common reasons for delays, additional information requests, or refused applications. Understanding what drawings are needed, what they must show, and what standards they must meet helps you commission the right drawings from the start and avoid the costly cycle of additional information requests from the planning officer.

Key Takeaways

  • Mandatory drawing package for a London householder planning application: (1) location plan (1:1250 or 1:2500, OS-based, site edged red, neighbouring land edged blue); (2) site plan (1:500 or 1:200); (3) existing floor plans (1:50 or 1:100, all floor levels); (4) proposed floor plans (all floor levels, proposed works indicated); (5) existing elevations (all affected facades); (6) proposed elevations (all affected facades, materials annotated); (7) existing and proposed roof plan where roof changes are proposed; (8) sections for loft conversions, basements, or where floor levels change
  • Drawing standards: each drawing as a separate PDF file; standard paper size (A1, A2, or A3); drawn scale must be verifiable (include graphical scale bar); drawing number and revision on each sheet; north point on all plan drawings; proposed materials annotated on all proposed elevations — failure to annotate materials leads to additional information requests which pause the 8-week determination clock
  • Additional documents beyond drawings: Design and Access Statement (mandatory only in designated areas for applications involving new dwellings; good practice for contentious applications in conservation areas); Heritage Statement (required or advisable for conservation area and listed building applications); BS 5837 tree survey (required where TPO trees or significant trees are affected); BNG assessment (not applicable to householder extensions to existing dwellings)
  • Pre-application advice strengthens contentious applications: most London boroughs offer paid pre-application advice (£100–£500 for householder) — the planning officer gives informal feedback before submission, allowing design adjustments that significantly increase the chance of approval; also consider neighbour engagement before submission (neighbour objections are influential in householder applications and are much easier to address at design stage than post-submission)
  • Planning permission vs Building Regulations: planning drawings are about appearance, scale, and impact — they are NOT sufficient for construction or Building Regulations. After planning, separate Building Regulations drawings (structural, thermal, fire, drainage details — typically 1:50 and 1:10) are required for Building Control approval; structural engineer drawings are also required separately. The planning fee for a householder application is £258 (2025 England); prior approval under the larger home extension scheme is £120

The mandatory drawings for a London householder planning application

**What is a householder planning application?**

A householder planning application is the application type used for most house extension and alteration projects — it applies to a single dwelling house where the works are to the house itself (extensions, loft conversions, outbuildings, fences, walls, gates, or other alterations). It does not apply to flats, or to change of use applications, or to applications for new dwellings.

The Planning Portal's online application system (PlanX or the legacy system, depending on the local authority) lists the mandatory and optional documents for each application type. For a householder application, the standard mandatory documents are:

**1. Location plan (mandatory)**:

  • A location plan showing the application site in context with the surrounding area, at a standard scale of 1:1250 (in urban areas) or 1:2500 (in rural areas). The location plan must:
  • Show the application site boundary, edged in red
  • Show any other land in the applicant's ownership or control that is not part of the application site, edged in blue
  • Show sufficient surrounding street layout for the site to be identified without reference to an address
  • Include a north point and a scale bar (or stated scale)

*Source*: Location plans must be derived from an Ordnance Survey (OS) base map — the OS holds the copyright to mapping data in the UK, and a planning location plan must be purchased from an authorised OS data supplier. Ordnance Survey digital map products can be purchased through the Planning Portal's location plan service, from companies such as Promap, GetMapping, or through an architect or planning consultant who has an OS data licence. The cost is typically £20–£50.

**2. Site plan (mandatory)**:

  • A site plan showing the application site at a scale of 1:500 or 1:200, showing:
  • The application site boundary (edged red)
  • All existing buildings on the site (hatched or shaded)
  • The proposed new buildings or extensions (shown in outline or in a contrasting hatch)
  • All buildings within or adjacent to the application site on neighbouring properties
  • The direction of north
  • Where relevant: access routes, parking areas, landscaping, trees

The site plan gives the planning officer a clear picture of the site and its context before looking at the detailed architectural drawings.

**3. Existing floor plans (mandatory)**:

  • Floor plans of the existing building at a standard scale of 1:50 or 1:100, showing:
  • All rooms at every floor level (including loft/roof space if relevant to the proposal)
  • All external walls and internal walls
  • Window and door positions
  • Room dimensions (not always required but strongly recommended — they allow the planning officer to assess scale and impact)
  • Dimensions must show the building footprint overall

*Note*: Existing floor plans should show the EXISTING condition — not the proposed. They are typically drawn from measured survey data (a tape measure or laser measure survey of the existing property). For most London terraced houses, a measured survey takes 2–4 hours for a competent surveyor or architect.

**4. Proposed floor plans (mandatory)**:

  • Floor plans of the building as proposed after the works, at the same scale as the existing floor plans (1:50 or 1:100). Proposed floor plans must show:
  • All existing rooms and the new extension/alteration rooms
  • The extent of the proposed works clearly indicated (typically by hatching or by cloud annotation on the drawing)
  • All walls, windows, doors, and room names
  • Dimensions of the proposed extension

**5. Existing elevations (mandatory)**:

  • Elevations of the existing building (the external facades), at 1:50 or 1:100, showing:
  • All visible external facades that will be affected by the proposed works (typically the rear elevation and the roof if the loft is being altered; the side elevation(s) for side extensions)
  • Existing window and door positions and sizes
  • Existing materials and finishes (cladding, render, brick, windows frame type)
  • Ground level (the level at which the building meets the ground)

**6. Proposed elevations (mandatory)**:

  • Elevations of the building as proposed, at 1:50 or 1:100. Proposed elevations must show:
  • The proposed new facade(s) of the extension or alteration
  • The relationship between the existing building and the new extension (the line of junction between existing and new must be clearly shown)
  • All proposed materials and finishes (annotated on the drawing)
  • Any proposed rooflights, dormer windows, or roof changes
  • Ground level and, where relevant, the relationship to neighbouring properties (ground level changes, fence heights)

**7. Existing and proposed roof plans (required for many applications)**:

A roof plan is a view of the building from above, showing the roof structure — ridge lines, eaves lines, slopes, rooflights, dormer positions. Required where the proposal involves any change to the roof (loft conversion, dormer, rooflight addition). Scale: 1:50 or 1:100.

**8. Existing and proposed sections (sometimes required)**:

  • A cross-section through the building (cutting through the relevant part of the proposal) shows the internal heights and relationships between floors and roof levels. Sections are particularly important for:
  • Loft conversions (to show head height within the converted loft)
  • Basement conversions (to show depths and relationship to existing foundations)
  • Extensions where the floor levels step between old and new
  • Scale: 1:50 or 1:100.

Drawing standards, who produces the drawings, and how to avoid common mistakes

**Drawing standards for planning applications**:

Planning applications in England are submitted via the Planning Portal (planningportal.co.uk), and all drawings must meet the following standards:

*File format*: PDF (preferred) or other acceptable formats listed by the local authority. Each drawing should be a separate PDF file — not a single PDF containing multiple drawings on separate pages.

*Drawing size*: Drawings should be prepared at a standard paper size (A1, A2, or A3) with the stated scale shown. The scale should be verifiable by measurement from the printed drawing (i.e., a 1:100 drawing at A1 paper size can be measured with a scale ruler).

*Drawing number and revision*: Each drawing should have a drawing number (e.g., 2025-RCB-001 Rev A) and revision letter. This allows specific drawings to be referenced in decision notices and in correspondence with the planning authority.

*North point*: A north arrow must appear on all plans (floor plans, site plan, location plan, roof plan).

*Scale bar*: All drawings should include a graphical scale bar (a drawn line labelled with its length in metres) — this ensures the scale is preserved when the drawing is printed at a different size from intended.

*Annotations*: All proposed materials should be annotated on the proposed elevations (e.g., 'matching existing London stock brick', 'grey powder-coated aluminium bi-fold doors', 'EPDM flat roof covering with insulated upstand'). The planning officer assesses the proposed materials as part of the application — if materials are not annotated, they will ask for additional information.

**Who produces planning drawings?**

  • *Architects and architectural technicians*:
  • A RIBA-registered architect or an architectural technician (typically CIAT registered) is the standard professional for producing planning drawings. They:
  • Visit the property to take a measured survey
  • Prepare existing plans, elevations, sections, and site plan
  • Design the proposed works (in conjunction with the homeowner)
  • Prepare proposed plans, elevations, sections, and roof plan
  • Submit the application (or assist the homeowner to submit) via the Planning Portal

Typical architect fee for planning drawings for a rear extension: £1,500–£4,000 (varies significantly by project complexity, architect's experience, and location in London).

*Architectural designers and drawing services*: There are many non-ARB-registered drawing services operating in London (architectural designers, planning consultants who also produce drawings). These can be competent and cost-effective, but the quality varies significantly. For straightforward projects, they can be adequate; for complex projects or contentious applications, an ARB-registered architect brings both greater design knowledge and professional accountability.

*Drawing companies (India/overseas)*: Some homeowners and builders use overseas drawing services who produce drawings based on sketches and dimensions emailed to them. These can produce acceptable drawings for simple projects but often lack knowledge of local planning context, conservation area requirements, and the nuances of London planning policy.

**What the drawing pack does NOT include (and what comes later)**:

  • Planners are concerned with *appearance, scale, and impact* — not structure, services, or construction details. Planning drawings are not sufficient for Building Regulations approval or for construction. They will not show:
  • Structural details (beam sizes, foundation depths, wall tie specifications)
  • Building Regulations compliance details (insulation values, fire safety provisions, ventilation)
  • Detailed construction information (drainage, services, fixing details)
  • After planning permission is granted, additional drawings are required:
  • *Building Regulations drawings*: More detailed construction drawings (typically 1:50 and 1:10 details) showing structural, thermal, ventilation, fire safety, and drainage compliance — submitted to Building Control (either the local authority Building Control or an Approved Inspector)
  • *Structural engineer drawings*: Foundation drawings, steel beam calculations, retaining wall designs — produced by the structural engineer working alongside the architect
  • *Services drawings*: M&E (mechanical and electrical) drawings where relevant (for larger or more complex projects)

Design and access statements, heritage statements, and how to strengthen a planning application

**When additional documents are required beyond the standard drawing pack**:

*Design and Access Statement (DAS)*: A Design and Access Statement is a written document that explains and justifies the design of the proposed works and how the proposal respects the site, its context, and accessibility. For householder applications: a DAS is mandatory only where the site is in a designated area (Conservation Area, World Heritage Site, SSSI) and the application involves the creation of one or more dwellings; or where the site is listed. For most standard householder extensions, a DAS is NOT mandatory — but it can be good practice to include one for contentious applications or in areas where the planning officer is likely to scrutinise the design carefully.

  • *Heritage Statement / Conservation Area Statement*:
  • Where the property is in a Conservation Area (or is a Listed Building), a heritage statement is typically required or strongly advisable. It should:
  • Describe the significance of the conservation area or listed building
  • Explain how the proposed works respect the character and appearance of the area
  • Reference the relevant Conservation Area Character Appraisal (most London boroughs have published one for each conservation area)
  • Justify any materials or design features that may be questioned

*Arboricultural Assessment (BS 5837 tree survey)*: Where trees are present within the site or adjacent to it, a BS 5837 tree survey (see `ground-investigation-guide`) may be required — particularly where planning permission affects the root protection area of any tree. Tree preservation orders (TPOs) add a formal requirement: any works affecting a TPO tree require separate consent.

*Biodiversity Net Gain (BNG)*: From April 2024 in England, planning applications (excluding householder applications for extensions to an existing house, and a number of other exempt categories) require a biodiversity net gain assessment. For most standard London householder extensions and loft conversions, BNG does not apply — but for applications that add a new dwelling (permitted development refusal sites, larger schemes) it may be triggered.

**How to strengthen a planning application for a contentious project**:

In conservation areas, or where the proposal is likely to attract neighbour objections, the following additional steps can significantly strengthen the application:

1. *Pre-application advice*: Many London boroughs offer a pre-application service (paid) where a planning officer reviews the proposal before submission and gives informal advice — typically £100–£500 for householder schemes. This can reveal officer concerns before you commit to a full application and fee.

2. *Neighbour engagement*: Speaking to immediately adjacent neighbours before submitting is good practice — neighbour objections are influential in householder applications. If neighbours have concerns, addressing them at the design stage is much easier than post-submission.

3. *Accurate materials annotation*: Annotating proposed materials precisely ('matching reclaimed London stock brick', 'timber window frames in colour to match existing') reduces the risk of additional information requests.

4. *Reference to design guidance*: In the planning statement (or in the DAS), reference to the local authority's design guidance (Supplementary Planning Document for extensions, conservation area character appraisal) shows the planning officer that the application has taken account of the local policy context.

**Planning application fees (England 2025)**:

| Application type | Fee | |---|---| | Householder application (extension, loft conversion, outbuilding) | £258 | | Prior approval (larger home extension under 6m/8m scheme) | £120 | | Certificate of lawfulness — existing (CLEUD) | £258 | | Certificate of lawfulness — proposed (CLOPUD) | £129 | | Listed building consent | No fee | | Change of use with associated operations | £578+ depending on floor area |

Fees correct as of early 2025 — confirm current fees at the Planning Portal before submitting.

Frequently Asked Questions

Do I need an architect to prepare my planning drawings?
You are not legally required to use an ARB-registered architect to prepare planning drawings in England — anyone can prepare and submit a planning application. However, the quality of the drawings matters significantly: a poorly prepared drawing pack leads to additional information requests (which pause the planning clock), increased delays, and sometimes outright validation rejection by the local authority. For most London householder extensions, an architect or CIAT-registered architectural technician is the most cost-effective option — they have the professional knowledge to prepare compliant drawings, understand local planning policy, and can advise on the most appropriate design to maximise the chance of approval. For very simple projects (a small rear extension in a non-conservation area, where PD comparison is clearly correct), some homeowners commission drawings from non-registered drawing services with acceptable results. For complex, conservation area, or contentious projects, an ARB architect is strongly recommended.
Can I use drawings from another planning application as a template for mine?
You cannot and should not copy drawings from another planning application — the drawings submitted as part of any planning application are copyright of the architect or designer who produced them, and the specific measurements and details will not match your property. What you CAN do is look at approved applications for similar projects in your area (via your local authority's planning search portal — all planning applications are public documents) to understand what types of proposals have been approved, what design principles the planners seem to accept, and what materials have been used in comparable approved extensions. This is useful research but not a substitute for your own drawings prepared from a measured survey of your specific property.
How long does it take to get planning permission for a house extension in London?
The standard statutory determination period for a householder planning application in England is 8 weeks from the date the application is validated (accepted as complete). Most London boroughs aim to determine applications within this period, but in practice some boroughs routinely take 10–12 weeks, and complex or contentious applications can take longer. The 8-week clock starts from validation — if the drawing pack is incomplete or has errors, the application will not be validated until all mandatory information is received, which can add weeks to the overall timeline. If additional information is requested after validation (the planning officer issues an AQS or RFI), the 8-week clock may be paused (with the applicant's agreement). To minimise the overall planning timeline: submit a complete, well-prepared application from the start; respond promptly to any additional information requests; and consider pre-application advice for contentious proposals.

Important Note

This guide is for general information only. Building regulations, planning rules, and legal requirements change regularly and vary by local authority. Always seek professional advice specific to your project and location. RCB Design & Build offers free initial consultations — book your free survey.

Ready to Discuss Your Project?

Free site survey. No obligation. Covering all Greater London & M25.

📞 Call now💬 WhatsAppFree Quote