Construction guides, cost breakdowns and planning advice for London homeowners and property investors.
650 articles — page 44 of 55
Illustrative image
Planning Permission for a Driveway in London: What You Need to Know
Many London homeowners assume that paving their front garden for a car is a simple job with no planning involvement. In fact, the rules changed in 2008 and the surface material matters significantly.
Drainage and Sewer Build-Over Consent for London Extensions
One of the most common unforeseen complications in London extension projects is the discovery of a public sewer crossing the site. Building over or close to a public sewer requires consent from Thames Water and can significantly affect the design.
Underpinning in London: What It Is, When You Need It, and What It Costs
Underpinning is one of the most significant structural interventions a London property can undergo. It is used to strengthen or deepen existing foundations — but understanding when it is genuinely necessary is important before committing to the expense.
As electric vehicles become mainstream, home charging is increasingly a priority for London homeowners. Installing a dedicated EV charger is faster, safer, and cheaper per charge than using a standard 3-pin socket.
Planning Conditions: What They Mean and How to Discharge Them
Most planning permissions in London are granted with conditions attached. Failing to comply with those conditions — even on a technicality — can undermine the planning permission itself. This guide explains how to manage them correctly.
Approved Inspector vs. Local Authority Building Control: Which Should You Choose?
When you submit a Building Regulations application in England, you have a choice between using the Local Authority Building Control (LABC) service or a private Approved Inspector. For most residential projects in London, either works well — but there are differences worth understanding.
How to Write a Design and Access Statement for a Planning Application
A Design and Access Statement (DAS) is a document submitted with certain planning applications to explain the design principles behind a proposal. Getting it right can make a significant difference to how a planning officer assesses the application.
How to Choose a Render Finish for Your London Extension
Render is one of the most common external finishes for London extensions. With several types on the market — each with different performance, cost, and maintenance characteristics — choosing the right one is worth careful consideration.
How to Read a Structural Survey Report for a London Property
A structural survey (also called a full structural survey or RICS Level 3 survey) is the most comprehensive pre-purchase property survey available. But the reports can be long and technical. This guide helps you understand what the findings actually mean.
Building Regulations drawings look technical and detailed — but understanding the basics helps you check that what is being built matches what was approved and gives you confidence in discussions with your contractor.
Open-Plan Living in London: Structural Considerations Before You Start
Creating open-plan living space by removing internal walls is one of the most popular home improvements in London. But structural walls cannot simply be removed — the process requires careful engineering and Building Regulations approval.
Concrete Block vs. Timber Frame Extensions: What's the Difference?
When commissioning a rear extension in London, most clients give little thought to the wall construction method. But the choice between traditional masonry and timber frame affects build speed, cost, thermal performance, and design flexibility.